Category:Meeting Summary
MONTHYEARML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24164A0182024-06-12012 June 2024 May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24079A2382024-03-19019 March 2024 Summary of March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood Station, Unit 2 ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML21330A0722021-12-0303 December 2021 Summary of November 17, 2021, Meeting with Exelon Generation Company, LLC, Related to a Future License Amendment to Remove License Condition 2.C.(12)(d) for Braidwood Station, Unit 2 ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20171A3812020-08-12012 August 2020 (COVID-19) Presubmittal Meeting Summary - Byron Unit 2 LAR - One-Time Extension of Steam Generator Tube Inspections ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18135A0222018-05-14014 May 2018 Summary of the May 10th, 2018, Public Open House Regarding Braidwood Nuclear Power Station ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing 2024-06-04
[Table view] |