Letter Sequence Meeting |
---|
|
|
MONTHYEARML19263F8752019-09-20020 September 2019 Relief Request VRR-01: Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)C3)(xi) Project stage: Supplement RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) Project stage: Supplement RS-20-056, Re. Ginna, Withdrawal of Relief Request for Alternative Frequency to Supplemental Indication2020-04-10010 April 2020 Re. Ginna, Withdrawal of Relief Request for Alternative Frequency to Supplemental Indication Project stage: Withdrawal ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto Project stage: Meeting 2020-02-28
[Table View] |
Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach BottoML20181A000 |
Person / Time |
---|
Site: |
Calvert Cliffs, Peach Bottom, Nine Mile Point, Braidwood, Limerick, Ginna, Clinton |
---|
Issue date: |
06/29/2020 |
---|
From: |
Blake Purnell Plant Licensing Branch III |
---|
To: |
Bryan Hanson Exelon Generation Co, Exelon Nuclear |
---|
Purnell B |
References |
---|
EPID L-2020-LRM-0055 |
Download: ML20181A000 (5) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24261B7722024-09-18018 September 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC, Related to the License Amendment Request to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital PPS ML24214A1402024-08-0505 August 2024 July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24183A1642024-07-0202 July 2024 June 27, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML24162A2212024-06-24024 June 2024 Summary of April 11, 2024, Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (EPID L-2022-LLA- ML24164A0182024-06-12012 June 2024 May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24151A2592024-06-0303 June 2024 May 22, 2024, Summary of Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24135A3722024-05-22022 May 2024 Enclosure 1 - Meeting Summary for May 7 and May 9 2024 Public Scoping Meetings ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24079A2382024-03-19019 March 2024 Summary of March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood Station, Unit 2 ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML23352A0592024-01-0909 January 2024 Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23173A0142023-06-22022 June 2023 Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A2802023-03-28028 March 2023 Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23030A0092023-02-10010 February 2023 January 10, 2023, Summary of Meeting with Constellation Energy Generation, LLC, on Planned Limerick Digital Modernization Project Installation Support License Amendment Request and Exemption Request ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests ML22346A0002022-12-14014 December 2022 Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22227A1112022-08-25025 August 2022 Summary of June 24, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22168A1922022-06-24024 June 2022 Summary of May 3, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions 2024-09-18
[Table view] |
Text
June 29, 2020 LICENSEE: EXELON GENERATION COMPANY, LLC FACILITIES: BRAIDWOOD STATION, UNITS 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; LIMERICK GENERATING STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; AND R. E. GINNNA NUCLEAR POWER PLANT
SUBJECT:
SUMMARY
OF JUNE 24, 2020, MEETING WITH EXELON GENERATION COMPANY, LLC REGARDING A PLANNED REQUEST FOR AN ALTERNATIVE TO SUPPLEMENTAL VALVE POSITION INDICATION TESTING REQUIREMENTS (EPID L-2020-LRM-0055)
On June 24, 2020, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Exelon Generation Company, LLC (Exelon, the licensee). The purpose of the meeting was to discuss a proposed alternative to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and standards, for supplemental valve position indication (SPI) testing. The meeting notice and agenda are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20161A325. A copy of Exelons presentation is available in ADAMS at Accession No. ML20171A235. A list of attendees is enclosed.
The proposed alternative will be for the Exelon plants which are currently using, or will be soon using, the 2012 Edition of the American Society of Mechanical Engineers (ASME) Operation and Maintenance of Nuclear Power Plants, Division 1 (OM Code). The ASME OM Code requires SPI testing to be performed once every 2 years. In addition, 10 CFR 50.55a(b)(3)(xi) requires:
When implementing ASME OM Code, 2012 Edition, Subsection ISTC-3700, Position Verification Testing, licensees shall verify that valve operation is accurately indicated by supplementing valve position indicating lights with other indications, such as flow meters or other suitable instrumentation, to provide assurance of proper obturator position.
The proposed alternative would allow Exelon to perform the SPI testing for certain valves at a frequency that is consistent with the test frequencies in Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B, to 10 CFR Part 50.
The specific valves are containment isolation valves, pressure isolation valves, and boundary valves that are currently tested in accordance with the Appendix J requirements or an NRC-approved alternative that is consistent with the Appendix J requirements. The proposed alternative would apply to different types of valves (e.g., motor-operated valves, air-operated valves, check valves). The proposed alternative would not apply to active motor-operated valves tested in accordance with the Mandatory Appendix III, Preservice and Inservice Testing
of Active Electric Motor Operated Valve Assemblies in Light-Water Reactor Power Plants, of the ASME OM Code.
On February 28, 2020 (ADAMS Accession No. ML20059P100), Exelon submitted a similar request for an alternative to the SPI testing requirements. However, Exelon withdrew this request on April 10, 2020 (ADAMS Accession No. ML20101P584). The February 28, 2020, proposed alternative would have allowed Exelon to decrease the frequency of SPI testing for numerous valves at its facilities using a risk-informed approach. In an April 14, 2020, letter (ADAM Accession No. ML20092M768), the NRC staff identified the additional information that the staff would need to review the proposed alternative as a risk-informed submittal. During the June 24, 2020, meeting, Exelon personnel stated that the new proposed alternative would not be risk-informed and would not include risk information. The new proposed alternative would follow the performance-based approach in 10 CFR Part 50, Appendix J, Option B. The NRC staff noted that based on the Exelon presentation slides, the scope of the new request appeared to be smaller and that the additional information identified in the April 14, 2020, letter may not be needed to support the new request.
The NRC staff identified three possible options for Exelon to pursue the change: (1) a performance-based submittal where the performance history of each valve is discussed in the application; (2) a code case that is developed through the consensus process with the relevant ASME OM Code committee, and (3) a risk-informed approach that included the necessary risk information in the application.
Exelon cited a September 20, 2019, application for Palo Verde Nuclear Generating Station (ADAMS Accession No. ML19263F875) as a precedent for its proposed alternative. The NRC staff noted that the Palo Verde application provided specific information about each valve included in its request. The staff stated that Exelons application should provide the valve identification, system, and historical performance. The staff stated that it normally verifies that there are not historic issues (e.g., stem-disc connection issues) with specific valves when it reviews requests for alternatives. Specifically, the staff stated that it uses the Institute for Nuclear Power Operations (INPO) database to verify specific valve information. Exelon stated that it could easily provide the specific information for each valve in the application and could do similar searches of the INPO database.
Exelon confirmed that the application would identify all the NRC-approved alternatives related to this request. The NRC staff stated that Exelon would not need to resubmit specific valve information that was provided in previous alternative requests. However, Exelon stated that the previously approved alternatives only account for a small subset of valves.
The NRC staff noted that the Appendix J requirements are only for leakage testing, but the proposed alternative will need to describe how both the open and closed position of the valves is verified. In addition, the NRC stated that the proposed alternative would need to describe how valve failures are treated given that the SPI testing and boundary valves are not part of Appendix J. Exelon stated that it is not intending to create any new requirements. Exelon stated that, under the proposed alternative, a valve failure would result in the valve returning to the current 2-year test interval. Successful testing of the valve for, typically, two consecutive 2-year intervals would be required before the test interval could be extended, consistent with Appendix J. Exelon further stated that it would not distinguish between valve failure and a position indication failure.
Exelon is planning on submitting the proposed alternative as a fleet request in July 2020 and will request approval within 6 months to support spring 2021 refueling outages. The NRC staff stated that it could work towards meeting the 6-month request date but the staff cannot guarantee that it will meet this date.
A representative for the Nuclear Energy Institute (NEI) asked about the NRC staff interactions with the ASME OM Code committee regarding the SPI test interval. The NEI representative also asked if the NRC staff has looked into other options (e.g., rulemaking) in case the effort with the ASME OM Code committee stalls. The NRC staff stated that there is an ongoing effort with the ASME OM Code committee to revise the SPI test interval requirements in the ASME OM Code. Additionally, the staff noted that although there were no other options currently being considered, it may be possible to include changes to the SPI testing requirements in a future rulemaking.
Public meeting feedback forms were not received. Please direct any inquiries to me at 301-415-1380 or Blake.Purnell@nrc.gov.
/RA/
Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, 50-317, 50-318, 50-461, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, and 50-244
Enclosure:
List of Attendees cc: Listserv
ML20181A000 *via email OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA* NRR/DORL/LPL3/BC* NRR/DORL/LPL3/PM NAME BPurnell SRohrer (JBurkhardt for) NSalgado (RKuntz for) BPurnell DATE 06/29/2020 06/29/2020 06/29/2020 06/29/2020 LIST OF ATTENDEES JUNE 24, 2020, MEETING WITH EXELON GENERATION COMPANY, LLC Name Affiliation Blake Purnell NRC Michael Farnan NRC Angela Buford NRC Nancy Salgado NRC Tom Scarbrough NRC Jeff Circle NRC Bob Pascarelli NRC Stephen Dinsmore NRC Hang Vu NRC Nick Hansing NRC V. Sreenivas NRC Mark DiRado Exelon William Reynolds Exelon Glenn Weiss Exelon David Neff Exelon David Gullott Exelon Lisa Zurawski Exelon Putri Kusumawatimurray Exelon Thomas Basso Nuclear Energy Institute Enclosure