Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations
ML18225A304
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 08/16/2018
From: Joel Wiebe
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co
Wiebe J
References
EPID L-2018-LRM-0045
Download: ML18225A304 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 16, 2018 LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: BYRON STATION, UNIT 2, AND BRAIDWOOD STATION, UNIT 1

SUBJECT:

SUMMARY

OF AUGUST 8, 2018, MEETING WITH EXELON GENERATION COMPANY, LLC, ON A FUTURE RELIEF REQUEST TO EXTEND THE POST-PEENING FOLLOW UP INSPECTIONS FOR CERTAIN REACTOR PRESSURE VESSEL HEAD PENETRATIONS (EPID L-2018-LRM-0045)

On August 8, 2018, a Category 1 public meeting was held via teleconference between the U.S.

Nuclear Regulatory Commission (NRC) and representatives of Exelon Generation Company, LLC. The purpose of the teleconference was to discuss a future relief request (RR) to extend the post-peening follow up inspections for Byron Station, Unit 2, and Braidwood Station, Unit 1.

The meeting notice and agenda, dated July 13, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18220A762. A list of attendees is provided as Enclosure 1.

The licensee presented information (ADAMS Accession No. ML18218A112) that provided an overview of the future RR.

The NRC staff queried the licensee about the technical basis for the RR. The staff noted that submitting a request pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1) provides a basis for an acceptable level of quality and safety and has a stronger technical basis than when submitting an RR pursuant to 10 CFR 50.55a(z)(2) that provides a basis for determining there is no compensating increase in quality and safety. The staff did not provide an opinion on the viability of 10 CFR 50.55a(z)(1) vs. 10 CFR 50.55a(z)(2).

The NRC staff pointed out that the licensee could achieve alignment of the timing of the follow-up inspections to a single refueling outage by moving some follow-up inspections to an earlier outage. The NRC staff recognizes that there is a strong technical basis for not moving the follow-up inspections to an earlier outage, but encouraged the licensee to provide that basis in the relief request.

Members of the public were not in attendance. Public Meeting Feedback forms were not requested.

Please direct any inquiries to me at 301-415-6606, or Joel.Wiebe@nrc.gov.

Sincerely, oel S. Wiebe, Senior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-455

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES AUGUST 8 1 2018, MEETING WITH EXELON GENERATION COMPANY, LLC FUTURE RELIEF REQUEST TO EXTEND THE POST-PEENING FOLLOW UP INSPECTIONS FOR CERTAIN REACTOR PRESSURE VESSEL HEAD PENETRATIONS Exelon Generation Company, LLC Heather Malikowski Jim Cirilli Ben Youman Brad Lanka Darren Gardner David Gullott Doug Spitzer Gary Contrady Glenn White (Dominion)

Markus Burkardt (Dominion)

NRC Staff John Tsao Stephen Cumblidge Jay Collins Roger Kalikian Ali Rezai Seung Min Joel Wiebe Enclosure