MONTHYEARML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 Project stage: Meeting 2021-01-21
[Table View] |
Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3ML21011A282 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle  |
---|
Issue date: |
01/21/2021 |
---|
From: |
Haskell R Plant Licensing Branch III |
---|
To: |
Exelon Generation Co, Exelon Nuclear |
---|
Haskell R |
References |
---|
EPID L-2020-LRM-0113 |
Download: ML21011A282 (5) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle |
---|
Category:Meeting Summary
MONTHYEARML25022A2032025-01-23023 January 2025 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Amendment Request to Allow Modification of the Standby Gas Treatment System ML24341A0922024-12-31031 December 2024 Summary of December Observation Meeting with Constellation Energy Generation, LLC on LAR to Support Replacement of Existing Safety-Related Analog Control Systems ML24351A0822024-12-19019 December 2024 Summary of November 7, 2024, Meeting with Constellation Energy Generation on Planned Alternative Requests Regarding Reactor Vessel Closure Studs (L-2024-LRM-0114) ML24344A2272024-12-12012 December 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 and 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System ML24338A0922024-12-0606 December 2024 Summary of November 8, 2024, Public Observation Meeting with Constellation Energy Generation, LLC on LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24325A5532024-11-21021 November 2024 Summary of October 29, 2024, Public Observation Meeting with Constellation Energy Generation, LLC Regarding Peach Bottom Atomic Power Station, Units 2 & 3 Digital Upgrade of the Emergency Core Cooling System Compensated Level System EPID L- ML24270A1672024-10-23023 October 2024 Scoping Meeting Summary Report ML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24277A2972024-10-10010 October 2024 October 2, 2024, Summary of Pre Submittal Public Meeting with Constellation Fitzpatrick, LLC to Discuss Future Amendment on Main Steam Line Radiation Monitor High Radiation System Isolations ML24275A0302024-10-0707 October 2024 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment Request to Allow Modification of the Standby Gas Treatment System ML24261B7722024-09-18018 September 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC, Related to the License Amendment Request to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital PPS ML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24214A1402024-08-0505 August 2024 July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24193A3432024-07-12012 July 2024 Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML24192A2122024-07-10010 July 2024 Summary of the May 22, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Lasalle County Station, Units 1 and 2 ML24183A1642024-07-0202 July 2024 June 27, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML24162A2212024-06-24024 June 2024 Summary of April 11, 2024, Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (EPID L-2022-LLA- ML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24164A0182024-06-12012 June 2024 May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24151A2592024-06-0303 June 2024 May 22, 2024, Summary of Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24135A3722024-05-22022 May 2024 Enclosure 1 - Meeting Summary for May 7 and May 9 2024 Public Scoping Meetings ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24079A2382024-03-19019 March 2024 Summary of March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood Station, Unit 2 ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23352A0592024-01-0909 January 2024 Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request ML23234A2342023-08-29029 August 2023 Summary of August 18, 2023, Meeting with Constellation Energy Generation, LLC, Related to the LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23237A2692023-08-25025 August 2023 Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23173A0142023-06-22022 June 2023 Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML23173A0072023-06-22022 June 2023 Summary of the Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 2025-01-23
[Table view] |
Text
January 21, 2021 LICENSEE:
Exelon Generation Co. LLC FACILITY:
Byron Nuclear Power Station, Units 1 and 2, and Dresden Nuclear Power Station, Units 2 and 3
SUBJECT:
SUMMARY
OF JANUARY 6, 2021, PRESUBMITTAL MEETING BETWEEN THE U. S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC REGARDING LICENSING ACTIVITIES TO SUPPORT THE PLANNED EARLY CLOSURES OF BYRON, UNITS 1 AND 2, AND DRESDEN, UNITS 2 AND 3 (EPID L-2020-LRM-0113)
On January 6, 2021, a Category 1 public meeting was held between the staff of the U.S.
Nuclear Regulatory Commission (NRC) and representatives of Exelon Generation Company LLC (Exelon), via teleconference. The purpose for this teleconference was for Exelon to brief the NRC staff on an emergency plan (EP) exemption and license amendment request (LAR) in support of post-defueled conditions following the scheduled early closures of the Byron and Dresden nuclear power stations.
The meeting was published on the NRCs public webpage on December 15, 2020 (Agencywide Documents Access Management System (ADAMS) Accession No. ML20350B643). No licensee-furnished presentation materials were received by the NRC staff.
A list of meeting attendees/affiliations is provided as an Enclosure to this meeting summary.
=
Background===
The NRC was notified of the planned early closures of both the Byron and Dresden stations by Exelon letters dated September 2, 2020 (ADAMS Accession Nos. ML20246G613 and ML20246G627, respectively).
Summary In support of the scheduled post-defueled conditions for each of these stations, Exelon presented information to the NRC staff for: (1) EP exemption planning and (2) EP LAR planning; as each pertain to post-defueled conditions that will exist at the Byron and Dresden stations following the planned early closures. Exelon discussed that each licensing action submittal would follow recently NRC-approved precedence regarding EP exemptions and license amendments used within industry. This will be accomplished by utilizing available benchmarking and industry lessons learned from previous decommissioning transition experience (i.e., Oyster Creek, Three Mile Island 1, other sites). Exelon discussed they would use revised Emergency Action Levels (EALs) which will conform to NRC-endorsed NEI 99-01, Revision 6,1 and there would be no EAL deviations. Exelon also discussed that the revised EPs would continue to follow industry norms for notifications at both the State and Federal level.
1 Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors, dated November 2012 (ADAMS Accession No. ML12326A805).
Exelon explained that the submittals will address various topical areas including:
communications, meteorology, staffing levels, emergency response organizations (EROs),
training, exercises/drills, etc. Exelon stated in their presentation that the projected submittal timelines for the EP exemption and EP license amendment for each station would be in mid-March 2021 (Dresden) and mid-May 2021 (Byron). Exelon concluded by reiterating that the announced planned early closure for Byron, Units 1 and 2, is scheduled to occur by September 30, 2021, and for Dresden, Units 2 and 3, is scheduled to occur by November 30, 2021.
The NRC staff engaged with Exelon to discuss mitigative strategies that have been employed throughout industry associated with spent fuel pool level indication and recovery from any potential loss of water inventory. The NRC staff discussed the benefits of NRC-approved information used at other sites; including previous NRC rulemakings and guidance such as the mitigation of beyond-design-basis events also known as the MBDBE Rule 2 and NEI 06-12.3 Exelon acknowledged the staffs discussion on the topic and indicated the forthcoming EP licensing submittals would be informed accordingly.
There were no final determinations or regulatory decisions made by the NRC staff during the meeting.
Public Participation During the public question and comment period, the NRC staff received and responded to a member of the public pertaining to:
o Availability of Exelon (or NRC) furnished presentation materials for this meeting.
o Exelons intention to reverse the currently scheduled early closures of the Byron and Dresden stations should economic conditions in the State of Illinois change in 2021.
A fact sheet on the decommissioning process can be found at: http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning.html. Also, the current Frequently Asked Questions (FAQs) about reactor decommissioning can be found at:
http://www.nrc.gov/waste/decommissioning/faq.html.
Meeting feedback forms were available; no comments were received.
2 Federal Register Notice/ Volume 84 No. 154/ Friday, August 9, 2019/ Rules and Regulations (84 FR 39684).
3 Nuclear Energy Institute (NEI) NEI 06-12, B.5.b Phase 2 & 3 Submittal Guideline, Revision 3, dated September 2009, ADAMS Accession No. ML092890400.
Please direct any inquiries to me at 301-415-1129 or by e-mail at Russell.Haskell@nrc.gov.
/RA/
Russell S. Haskell, Project Manager Plant Licensing Branch, III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.
STN 50-454, STN 50-455, 50-237 and 50-249
Enclosure:
List of Attendees cc w/encl: Listserv
Enclosure LIST OF ATTENDEES/AFFILIATION/ORGANIZATION RE:
SUMMARY
OF JANUARY 6, 2021, PRESUBMITTAL MEETING BETWEEN THE NRC AND EXELON GENERATION COMPANY LLC REGARDING LICENSING ACTIVITIES TO SUPPORT THE PLANNED EARLY CLOSURES OF BYRON, UNITS 1 AND 2 AND DRESDEN, UNITS 2 AND 3 ATTENDEES (23)
AFFILIATION/ORGANIZATION Amanda Marshall Nuclear Regulatory Commission (NRC)
Joseph Anderson NRC Marlayna Doell NRC Mike Norris NRC Prema Chandrathil NRC Russell Haskell NRC Dan Barss NRC Joel Wiebe NRC Zahira Cruz-Perez NRC Kenneth Mott NRC Chris Wilson Exelon Generation Co. LLC (Exelon)
Douglas Walker Exelon Patrick Simpson Exelon Duane Avery Exelon Daniel Murphy Exelon Kari Benning Exelon Leslie Holden Exelon Lisa Simpson Exelon Mitch Mathews Exelon Roger Fallens Exelon Zoe Cox Exelon Rodney Brown EC2 LLC (Public)
Steven Dolly S&P Global Platts (Public)
ML21011A282 (Meeting Summary)
OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME RHaskell SRohrer NSalgado RHaskell DATE 1/12/2021 1/12/2021 1/14/2021 1/21/2021