ML14190A464

From kanterella
Jump to navigation Jump to search

Summary of Telephone Conference Call Held on June 30, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Discussing Applicant Responses in Staff Requests for Additional Information B.2.1.16-1A, B.21.23-1
ML14190A464
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/16/2014
From: Robinson L
License Renewal Projects Branch 1
To:
Exelon Generation Co
Robinson L, 415-4115
References
TAC MF1879, TAC MF1880, TAC MF1881, TAC MF1882
Download: ML14190A464 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 16, 2014 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2 Braidwood Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 30, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC, DISCUSSING APPLICANT RESPONSES TO STAFF REQUESTS FOR ADDITIONAL INFORMATION B.2.1.16-1A, B.2.1.23-1, AND 3.0.3-3A CONCERNING THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAC NOS. MF1879, MF1880, MF1881, MF1882)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Exelon Generation Company, LLC (Exelon or the applicant), held a telephone conference call on June 30, 2014, to discuss and clarify the applicants responses to staff requests for additional information (RAIs). Specifically, the staff discussed the responses submitted for RAI B.2.1.23-1 (letter dated January, 13, 2014), RAI 3.0.3-3a (letter dated May 12, 2014), and RAI B.2.1.16-1a (letter dated June 16, 2014). For the responses associated with RAI B.2.1.23-1 and RAI 3.0.3-3a, the staff was concerned that program basis information located in the response was not adequately addressed in the associated aging management program (AMP) basis description in Section B of the license renewal application (LRA). The applicant understood the staffs concern and agreed to review and amend the RAI response to include the basis information in the associated AMP basis description in Section B of the LRA.

For the response associated with RAI B.2.1.16-1a, the staff was concerned that the response information regarding the extent of inspections for multiple wet pipe sprinkler systems in the Fire Water System program was not being addressed in the associated LRA commitments and Fire Water System AMP enhancements. The applicant stated that they had deliberately not included the statement, [t]he wet pipe sprinkler systems that are not inspected during a five (5) year period will be inspected during the subsequent five (5) year period in the associated LRA commitments, and Fire Water System AMP enhancements, because it believed that this was beyond the level of detail required in the commitment and enhancement statements.

The applicant also stated that placing this information in the RAI response and Fire Water System AMP Program Description is sufficient to ensure that the statement will be included in the applicable plant-specific implementing procedures. The staff will evaluate this item to determine if more information is needed.

The applicant had an opportunity to comment on this summary.

/RA/

Lindsay Robinson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457

Enclosure:

List of Participants cc w/encl: Listserv

ML14190A464 *concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds LRobinson YDiazSanabria LRobinson DATE 7/15/14 7/16/14 7/16/14 7/16/14

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 30, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC DISCUSSING APPLICANT RESPONSES TO STAFF REQUESTS FOR ADDITIONAL INFORMATION B.2.1.16-1A, B.2.1.23-1, AND 3.0.3-3A CONCERNING THE BYRON STATION AND BRAIDWOOD STATION, LICENSE RENEWAL APPLICATION (TAC NOS. MF1879, MF1880, MF1881, MF1882)

DISTRIBUTION EMAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMByron Resource RidsNrrPMBraidwood Resource LRobinson DMcIntyre, OPA EDuncan, RIII JBenjamin, RIII AGarmoe, RIII JMcGhee, RIII JRobbins, RIII VMitlyng, RIII PChandrathil, RIII

TELEPHONE CONFERENCE CALL BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS June 30, 2014 PARTICIPANTS AFFILIATIONS Lindsay Robinson U.S. Nuclear Regulatory Commission (NRC)

William Holston NRC John Wise NRC John Hufnagel Exelon Generating Company, LLC (Exelon)

Al Fulvio Exelon Don Warfel Exelon Albert Piha Exelon Casey Muggleston Exelon Pete Tamburro Exelon Paul Cervenka Exelon ENCLOSURE