Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures
ML21033A658
Person / Time
Site: Dresden, Byron  Constellation icon.png
Issue date: 02/04/2021
From: Joel Wiebe
Plant Licensing Branch III
To: Rhoades D
Exelon Generation Co
Wiebe J
References
EPID L-2020-LRM-0094
Download: ML21033A658 (4)


Text

February 4, 2021 LICENSEE: Exelon Generation Co. LLC FACILITY: Byron Nuclear Power Station, Units 1 and 2, and Dresden Nuclear Power Station, Units 2 and 3

SUBJECT:

SUMMARY

OF OCTOBER 13, 2020, PRESUBMITTAL MEETING BETWEEN THE U. S. NUCLEAR REGULATORY COMMISSION AND EXELON GENERATION COMPANY, LLC REGARDING POST SHUTDOWN EMERGENCY PLAN STAFFING TO SUPPORT THE PLANNED EARLY CLOSURES OF BYRON, UNITS 1 AND 2, AND DRESDEN, UNITS 2 AND 3 (EPID L-2020-LRM-0094)

On October 13, 2020, a Category 1 public meeting was held between the staff of the U.S.

Nuclear Regulatory Commission (NRC) and representatives of Exelon Generation Company LLC (Exelon), via teleconference. The purpose for this teleconference was for Exelon to brief the NRC staff on post shutdown emergency plan staffing in support of the scheduled early closures of the Byron and Dresden nuclear power stations.

The meeting was published on the NRCs public webpage on September 29, 2020 (Agencywide Documents Access Management System (ADAMS) Accession No. ML20273A342). No licensee-furnished presentation materials were received by the NRC staff.

A list of meeting attendees/affiliations is provided as an Enclosure to this meeting summary.

Background

The NRC was notified of the planned early closures of both the Byron and Dresden stations by Exelon letters dated September 2, 2020 (ADAMS Accession Nos. ML20246G613 and ML20246G627, respectively).

Summary In support of the scheduled early closures for each of these stations, Exelon presented information to the NRC staff regarding proposed site emergency plan changes that would revise the on-shift staffing and the Emergency Response Organization staffing. Exelon stated that the revised staffing is commensurate with the reduced spectrum of credible accidents in the post shutdown and permanently defueled condition. In order to assist in the transition from an operating facility to a permanently defueled facility, the changes are required to properly reflect the conditions of the facility while continuing to preserve the Byron Decommissioning Trust Fund and the effectiveness of the emergency plan. Exelon stated that the proposed changes continue to meet the planning standards in 10 CFR 50.47(b) and requirements in 10 CFR 50, Appendix E.

The NRC staff engaged the licensee regarding various aspects of the changes, but no final determinations or regulatory decisions were made by the NRC staff during the meeting.

No public comments were received during the meeting Meeting feedback forms were available; no comments were received.

Please direct any inquiries to me at 301-415-6606 or by e-mail at Joel.Wiebe@nrc.gov.

/RA/

Joel S. Wiebe, Senior Project Manager Plant Licensing Branch, III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, 50-237 and 50-249

Enclosure:

List of Attendees cc w/encl: Listserv

LIST OF ATTENDEES/AFFILIATION/ORGANIZATION RE:

SUMMARY

OF OCTOBER 13, 2020, PRESUBMITTAL MEETING BETWEEN THE NRC AND EXELON GENERATION COMPANY LLC REGARDING POST SHUTDOWN EMERGENCY PLAN STAFFING TO SUPPORT THE PLANNED EARLY CLOSURES OF BYRON, UNITS 1 AND 2 AND DRESDEN, UNITS 2 AND 3 ATTENDEES AFFILIATION/ORGANIZATION Nancy Salgado NRC Joseph Anderson NRC Harral Logaras NRC Mike Norris NRC Prema Chandrathil NRC Scott Burnell NRC Joel Wiebe NRC Jeanette Adisay NRC Roy Elliott NRC Chris Wilson Exelon Generation Co. LLC (Exelon)

Douglas Walker Exelon Patrick Simpson Exelon Lisa Simpson Exelon Brett Norman Exelon Mitch Mathews Exelon Leslie Holden Exelon Robert Lloyd Exelon Michelle Olsofsky Pacific Gas and Electric (Public)

Anonymous Grundy County Emergency Management (Public)

Jeff Quinn EPM Inc (Public)

Scott Foils Illinois Senate Staff (Public)

George Gray Grundy County Administrator (Public)

Tarver Haven Illinois Emergency Management Agency (Public)

Clare Roth Exchange Monitor Publication (Public)

Kent Bugg Coal City Unit School District (Public)

Enclosure

ML21033A658 (Meeting Summary)

OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JWiebe SRohrer NSalgado JWiebe DATE 02/03/2021 02/02/2021 02/04/2021 02/04/2021