LICENSEE:
Constellation Energy Generation, LLC FACILITIES:
Braidwood Station and Byron Station
SUBJECT:
SUMMARY
OF THE JUNE 2, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNITS 1 AND 2 On June 2, 2022, from 5:00 p.m. to 6:00 p.m. (CDT), an information meeting with a question-and-answer session was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2021 end-of-cycle plant performance assessment of Braidwood Station and Byron Station, and with general information on the NRC. The open house was held virtually via Microsoft Teams. The NRC representatives discussed plant performance with members of the public. Representatives from Constellation Nuclear were also present at the event.
The NRC discussed their assessment of Braidwood Stations and Byron Stations performance during the public outreach. The assessment information was documented in the March 2, 2022, end-of-cycle assessment letters (ADAMS Accession No. ML22055B031 and ML22055B054, respectively). Representatives from the NRC made links to those letters, inspection reports, fact sheets and brochures, and other public documents available to those in attendance. The presentation for this webinar is available in ADAMS, Accession Number ML22159A333.
Hironori Peterson, Branch Chief Branch 3 Division of Reactor Projects Docket Nos.
- 05000456, 05000457 (Braidwood) 05000454, 05000455 (Byron)
License Nos. NPF-72, NPF-77 (Braidwood)
NPF-37, NPF-66 (Byron) cc: Distribution via LISTSERV June 9, 2022 Signed by Peterson, Hironori on 06/09/22
ML22159A223 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIII RIII NAME NShah:sw HPeterson DATE 06/08/2022 06/09/2022
Enclosure PUBLIC MEETING ATTENDEES June 2, 2022 U.S. Nuclear Regulatory Commission N. Shah, Project Engineer, DRP, Branch 1 D. Kimble, Senior Resident Inspector, Braidwood Station D. Betancourt, Senior Resident Inspector, Byron Station P. Smagacz, Resident Inspector, Braidwood Station J. Weigandt, Resident Inspector, Byron Station A. Demeter, Reactor Engineer, DRP, Branch 3 P. Chandrathil, Public Affairs Office C. Hernandez, Resident Office Assistant Constellation Nuclear D. Brunswick Z. Cox P. Dempsey G. Gugle D. Gullot J. Kowalski K. Lueshen S. Macartney R. Schliessmann B. Seawright L. Simpson H. Welt L. Zurawski Members of the Public A. Medsker J. Schneider P. Steenwik B. Theis