Other: ML13212A367, ML14050A304, ML14071A620, ML14072A369, ML14092A346, ML14177A430, ML14238A691, ML14245A371, ML14300A218, ML14317A783, ML15027A196, ML15098A181, ML15106A736, RS-14-183, Updated Responses to NRC Set 14 Requests for Additional Information, Related License Renewal Application, RS-14-249, Results of Detailed Review Performed in Response to Request 1 of NRC RAI B.2.1.7-7 from Set 17, Related to License Renewal Application, RS-15-049, Units 1 and 2 - LRA Impact Assessment Associated with Earlier Responses to Set 29 RAI B.2.1 .5-1a, Related to the License Renewal Application, ULNRC-06118, Updated RAI Response to the License Renewal Application, Enclosures 1 and 2
|
MONTHYEARML13212A3672013-08-12012 August 2013 Plan for the Aging Management Program Regulatory Audits Regarding the Byron and Braidwood Nuclear Stations License Renewal Application Review Project stage: Other ML13262A0352013-10-0707 October 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application -Aging Management, Set 1 Project stage: RAI ML13281A5572013-10-28028 October 2013 Summary of Telephone Conference Call Held on September 25, 2013 Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAIs Pertaining to the Byron-Braidwood License Renewal Application (TAC Nos. MF187 Project stage: RAI ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA Project stage: RAI ML13281A5742013-11-25025 November 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 3 (TAC Nos. MF1879, MF1880, MF1881, and MF1882 Project stage: RAI ML13281A5692013-12-12012 December 2013 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and the Braidwood Nuclear Station Units 1 and 2, LRA - Aging Management, Set 4 Project stage: RAI ML13282A3692013-12-13013 December 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 2 Project stage: RAI RS-13-273, Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application2013-12-17017 December 2013 Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application Project stage: Response to RAI RS-13-274, Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application2013-12-19019 December 2013 Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application Project stage: Response to RAI ML13317A0752014-01-13013 January 2014 Requests for Additional Information for Review of Byron, Units 1 & 2, and Braidwood, Units 1 & 2, License Renewal Applications, Set 6 Project stage: RAI RS-14-003, Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application2014-01-13013 January 2014 Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application Project stage: Response to RAI ML14017A0072014-01-16016 January 2014 Enclosure 1 to ULNRC-06072, Callaway Plant, Unit 1, Responses to Request for Additional Information (RAI) Sets 29 and 27 (RAI B2.1.6-4b) Project stage: Response to RAI ML14007A6582014-01-22022 January 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 9 Project stage: RAI ML13309A9322014-01-23023 January 2014 Summary of Telephone Conference Call Held on October 31, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braid Project stage: Draft RAI ML13330A9322014-01-23023 January 2014 Bbs Record of Conference Call-Regarding-RAI Set 4 110513 Project stage: RAI ML13318A4152014-01-23023 January 2014 November 12, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braidwo Project stage: Draft RAI RS-14-030, Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application2014-02-0404 February 2014 Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application Project stage: Response to RAI ML14006A0212014-02-0606 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application- Aging Management, Set 8 Project stage: RAI ML14023A5642014-02-0707 February 2014 RAI for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 13 Project stage: RAI ML14030A5962014-02-10010 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 12 Project stage: RAI ML14007A6032014-02-18018 February 2014 Request for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, LRA - Aging Management - Set 17 Project stage: RAI ML14034A0682014-02-18018 February 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 11 Project stage: RAI ML14035A5342014-02-20020 February 2014 January 22, 2014, Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, Llc., Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braidwood Station, License Renewal Applica Project stage: Draft RAI ML14035A1892014-02-20020 February 2014 Summary of Telephone Conference Call Held on January 30, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron Station and Braidw Project stage: Draft RAI ML14050A1222014-02-24024 February 2014 Summary of Telephone Conference Call Held on January 16, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 7, Tor the Byron-Braidwood License Renewal Application (TAC Nos. MF1879, Mf Project stage: RAI ML14038A3362014-02-26026 February 2014 Request for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management - Set 10 Project stage: RAI RS-14-051, Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application2014-02-27027 February 2014 Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14063A4952014-03-0404 March 2014 Response to NRC Requests for Additional Information, Set 13, Dated February 7, 2014 Re License Renewal Application Project stage: Response to RAI ML14051A4312014-03-0404 March 2014 Summary of Telephone Conferene Call Held on January 29, 2014, Between the NRC and Exelon Generating Company, Llc., Concerning RAI Set 10, for the Byron and Braidwood Station License Renewal Application (TAC Nos. MF1879, MF1880, MF1881, and Project stage: RAI ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA Project stage: RAI ML14050A1672014-03-0404 March 2014 Summary of Telephone Conference Call on January 23, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 11, for Byron-Braidwood License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 Project stage: RAI ML14051A4282014-03-0606 March 2014 January 13, 2014, Summary of Telephone Conference Call Held Between the NRC and Exelon RAI Set 8, for the Byron and Braidwood Station LRA Project stage: RAI ML14050A0812014-03-0707 March 2014 Correction to Request for Additional Information B.2.1.10-1, Letter Dated February 7, 2014, for the Review of the Byron Station and Braidwood Station, Units 1 and 2, LRA Set 13 Project stage: RAI ML14064A3912014-03-11011 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 15 Project stage: RAI ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal Project stage: Draft RAI ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal Project stage: Draft RAI ML14072A3692014-03-13013 March 2014 AMP Audit Enclosure (3) Project stage: Other ML14071A6202014-03-13013 March 2014 Aging Management Programs Audit Report Regarding the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (Tac Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML14050A3042014-03-14014 March 2014 Scoping and Screening Methodology Audit Report Regarding the Byron Station, and Braidwood Station, Units 1 and 2, LRA Project stage: Other ML14058B1822014-03-18018 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 14 Project stage: RAI ML14051A5032014-03-20020 March 2014 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Set 17 Project stage: RAI RS-14-084, Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application2014-03-28028 March 2014 Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14073A7052014-04-0303 April 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the NRC and Exelon, Concerning Drais Pertaining to the Byron and Braidwood Station, LRA Project stage: RAI ML14084A3352014-04-0303 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 16 Project stage: RAI ML14084A4882014-04-0707 April 2014 Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron and Braidwood License Renewal Application Set 16 Project stage: Draft RAI ML14092A2612014-04-0707 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 20 Project stage: RAI ML14092A3462014-04-0707 April 2014 Project Manager Change for the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 Project stage: Other ML14094A3662014-04-0808 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 19 Project stage: RAI ML14093B2472014-04-10010 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 18 Project stage: RAI ML14099A4852014-04-17017 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 & 2, and Braidwood Station, Units 1 & 2, License Renewal Application, Set 21, Project stage: RAI 2014-02-27
[Table View] |
Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 12| ML14030A596 |
| Person / Time |
|---|
| Site: |
Byron, Braidwood  |
|---|
| Issue date: |
02/10/2014 |
|---|
| From: |
Robinson L License Renewal Projects Branch 1 |
|---|
| To: |
Gallagher M Exelon Generation Co |
|---|
| Robinson L, 415-4115 |
| References |
|---|
| TAC MF1879, TAC MF1880, TAC MF1881, TAC MF1882 |
| Download: ML14030A596 (9) |
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 10, 2014 Mr. Michael P. Gallagher Vice President, License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 SUBJECT REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION, SET 12 (TAC NOS. MF1879, MF1880, MF1881, AND MF1882)
Dear Mr. Gallagher:
By letter dated May 29, 2013, Exelon Generation Company, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses NPF-37, NPF-66, NPF-72, and NPF-77 for Byron Station, Units 1 and 2, and Braidwood Stat1on, Units 1 and 2, respectively, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with John Hufnagel, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4115 or by e-mail Lindsay.Robinson@nrc.gov.
~~
. Lindsay R. Robinson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457
Enclosure:
Requests for Additional Information cc w/encl: Listserv
- ML14030A596 OFFICE LA:DLR PM: RPB1:DLR NAME I King LRobinson DATE 2/4/2014 2/6/2014 PM:RPB1 :DLR JDailv 2/6/2014
RAI 2.2-1 ApolicabHity:
BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION-SET 12 Byron Station (Byron) and Braidwood Station (Braidwood)
Background:
License renewal application (LRA) Section 2.2 provides the results of applying the license renewal seeping criteria, described in LRA Section 2.1, to the systems, structures, and components (SSCs). The results are presented in LRA Table 2.2*1.
The following Updated Final Safety Analysis Report (UFSAR) systems could not be located in LRA Table 2.2-1:
UFSAR Section System 3.9.2.7 Loose Parts Monitoring System Loose Parts Monitoring System E.17 Plant Safety Parameter Display System Safety Parameter Display System Request:
Please provide information explaining where these systems are considered in LRA, or provide justification for their exclusion.
RAI 2.3.3.16-1 Applicability:
Byron and Braidwood
Background:
LRA Section 2.1.5.2 (pg. 2.1-21) states:
For nonsafety-related piping connected to safety-related piping, the nonsafety-related piping was assumed to provide structural support to the safety-related piping if the nonsafety-related is within the analytical boundary of the CLB
[Current licensing basis] seismic analysis..
Generally, the analytical boundaries are located at anchor points. In cases where it is impractical to seismically model a piping system from anchor point to anchor point, the analytical boundary can be truncated by utilizing a series of ENCLOSURE supports designed such that the effects of the piping truncated from the model would not change the response of the piping within the analysis boundary.
Issue:
On LRA drawings LR-BYR-M-65 Sheets 3 and 6 (C1) and LR-BRW-M-65 Sheets 3 and 6 (C1),
the staff could not locate seismic anchors on the 10 CFR 54.4(a)(2) non-safety related lines OAS35AB 2 and OAS35AA 2, respectively, continued from M-56 Sheet 4A (E6/E8) to safety-related valve BEF-40 on LR-BYRIBRW-M-65 Sheets 3 and 6 (05).
Request:
The staff requests additional information on the location of the seismic or equivalent anchor between the safety/non-safety interface and the end of the 10 CFR 54.4(a)(2) seeping boundary.
RAI 2.3.3.18-1 Applicability:
Byron
Background:
LRA Section 2.1, "Seeping and Screening Methodology," describes the applicant's seeping methodology, which specifies how systems or components were determined to be included in scope of license renewal. The staff confirms the inclusion of all components subject to aging management review (AMR) by reviewing the results of the screening of components within the license renewal boundary.
Issue:
License renewal drawing LR-BYR-M-78 Sheet 7 (CB and 05) has in scope continuations to M-44 Sheet 3C_ Drawing M-44 Sheet 3C was not provided with the LRA Request:
The staff requests the applicant provide sufficient information to locate the license renewal boundary. If the continuation cannot be shown on license renewal boundary drawings, then provide additional information describing the extent of the seeping boundary and verify whether or not there are additional component types subject to an AMR between the continuation and the termination of the seeping boundary. If the seeping classification of a section of the piping changes over the continuation, provide additional information to clarify the change in seeping classification.
RAI 2.3.3.18-2 Applicability:
Braidwood
Background:
LRA Section 2.1, "Seeping and Screening Methodology," describes the applicant's seeping methodology, which specifies how systems or components were determined to be included in scope of license renewal. The staff confirms the inclusion of all components subject to an AMR by reviewing the results of the screening of components within the license renewal boundary.
Issue:
On license renewal drawing LR-BRW-M-78 Sheet 6 {C4), the continuation of piping in scope for license renewal was not provided for the continuation of line 1 PR23B 2.
Request The staff requests the applicant provide additional information to locate the license renewal boundary. If the continuation cannot be shown on license renewal boundary drawings, then provide additional information describing the extent of the seeping boundary and verify whether or not there are additional component types subject to an AMR between the continuation and the termination of the seeping boundary. If the seeping classification of a section of the piping changes over the continuation, provide additional information to clarify the change in seeping classification.
RAI 2.3.3.18-3 Applicability:
Braidwood
Background:
LRA Section 2.1, "Seeping and Screening Methodology," describes the applicant's seeping methodology, which specifies how systems or components were determined to be included in scope of license renewal. The staff confirms the inclusion of all components subject to an AMR by reviewing the results of the screening of components within the license renewal boundary.
License renewal drawing LR-BRW-M-78 Sheet 6 (A5) shows nonsafety-related outlet line number 1PR23B 2 highlighted in green indicating it is in scope for 10 CFR 54.4(a)(1). However.
allocation (C4). this line is highlighted red indicating lhe line is in scope for 10 CFR 54.4(a)(2).
Request The staff requests the applicant clarify the seeping classification of line 1 PR23B 2.
RAI2.3.3.19-1 Applicability:
Braidwood
Background:
LRA Section 2.1.5.2 states in certain instances the analytical boundaries of the CLB seismic analysis are not clearly defined. In these cases, non safety-related piping was included in scope for 10 CFR 54.4(a)(2) for the entire run of nonsafety-related piping that is connected at both ends to safety-related piping On LR-8RW-M-64 Sheet 4A (87), lines 1WEC4A and 1WEC2A are shown with an FA.d symbol indicating nonsafety-related piping runs are connected at both ends to safety-related piping.
The continuation to LR-BRW-M-48 Sheet 29 (87) does not connect to safety-related piping.
Request:
The staff requests the applicant provide justification for the F.4.d symbols on LR-BRW-M-64 Sheet 4A.
RAt 2.3.3.19-2 Applicability:
Braidwood
Background:
LRA Section 2.1. 5. 2 states in certain instances the analytical boundaries of the CLB seismic analysis are not clearly defined. In these cases, the nonsafety-related piping was included in scope for 10 CFR 54.4(a)(2) for the entire run of nonsafety-related piping that is connected at both ends to safety-related piping.
Issue:
On LR-8RW-M-138 Sheet 48 (A/87) lines 2WEC4A and 2WEC2A downstream of valves 2CV010A and 2CV010B are shown with an F.4.d symbol indicating nonsafety-related piping runs are connected at both ends to safety-related piping. The continuations to LR-BRW-M-48 Sheet 29 (85) do not connect to safety-related piping.
Request:
The staff requests the applicant provide justification for the F.4.d symbol on LR-BRW-M-138 Sheet 48 RAt 2.3.3.20-1 Applicability:
Byron
Background:
In LRA Section 2.1.5.2, the applicant stated for nonsafety-related piping connected to safety-related piping, the nonsafety-related piping is assumed to provide structural support to the safety-related piping if the non safety-related piping is within the analytical boundary of the CLB seismic analysis.
Issue:
On LRA drawing LR-BYR-M-69 Sheet 1 (E2. E3. E4. E6. E7 and EB). the staff could not locate seismic or equivalent anchors on the 10 CFR 54.4(a)(2) non-safety related lines OGW04AA, OGW04AB, OGW04AC, OGW04AD, OGW04AE, and OGW04AF, all of which are contrnued from M-69 Sheet 2 (04) to safety-related valves OGW9297A, OGW9297B, OGW9297C, OGW9297D, OGW9297E, and OGW9297F, respectively.
Request The staff requests the applicant provide additional information to locate the seismic or equivalent anchors between the safety/non-safety interface and the end of the 10 CFR 54.4(a)(2) scoping boundary.
RAt 2.3.3.20-2 Applicability:
Braidwood
Background:
LRA Section 2.1, "Seeping and Screening Methodology," describes the applicant's seeping methodology, which specifies how systems or components were determined to be included in scope of license renewal. The staff confirms the inclusion of all components subject to an AMR by reviewing the results of the screening of components within the license renewal boundary.
Issue:
License renewal drawing LR-BRW-M-48 Sheet 31 (C1) shows nonsafety-related line number OAC07A 1 connected twice to the in scope Sulfuric Acid Day Tank as not highlighted, indicating it is not in scope for license renewal. Note that on LR-BYR-M-48 Sheet 31 (C1 ), this line is in scope for 10 CFR 54.4(a)(2).
Request The staff requests the applicant clarify the seeping classification of line OAC07 A 1 on LR-BRW-M-48 Sheet 31.
RAI 2.3.3.20-3 Applicability:
Braidwood
Background:
In LRA Section 2.1.5.2, the applicant stated for nonsafety-related piping connected to safety-related piping, the nonsafety-related piping is assumed to provide structural support to the safety-related piping if the nonsafety-related is within the analytical boundary of the CLB seismic analysis.
Issue:
On LRA drawing LR-BRW-M-69 Sheet 1 (E2, E3, E4, E6, E7 and EB), the staff could not locate seismic or equivalent anchors on the 10 CFR 54.4(a)(2) non-safety related lines OGW04AA, OGW04AB, OGW04AC, OGW04AD, OGW04AE, and OGW04AF all of which are continued from M-69 Sheet 2A (E2) to safety-related valves OGW9297A, OGW92978, OGW9297C, OGW9297D, OGW9297E, and OGW9297F, respectively.
Request:
The staff requests the applicant provide additional information to locate the seismic or equivalent anchors between the safety/non-safety interface and the end of the 10 CFR 54.4(a)(2) seeping boundary.
Letter to M.P. Gallagher from lindsay R. Robinson dated February 10, 2014
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION, SET 12 (TAC NOS. MF1879, MF1880, MF1881, AND MF1882)