Letter Sequence RAI |
---|
|
Results
Other: ML13212A367, ML14050A304, ML14071A620, ML14072A369, ML14092A346, ML14177A430, ML14238A691, ML15098A181, ML15106A736, RS-14-183, Updated Responses to NRC Set 14 Requests for Additional Information, Related License Renewal Application, RS-14-249, Results of Detailed Review Performed in Response to Request 1 of NRC RAI B.2.1.7-7 from Set 17, Related to License Renewal Application
|
MONTHYEARML13212A3672013-08-12012 August 2013 Plan for the Aging Management Program Regulatory Audits Regarding the Byron and Braidwood Nuclear Stations License Renewal Application Review (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML13281A5742013-11-25025 November 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 3 (TAC Nos. MF1879, MF1880, MF1881, and MF1882 Project stage: RAI ML13303B4632013-11-25025 November 2013 Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA Project stage: RAI ML13281A5692013-12-12012 December 2013 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and the Braidwood Nuclear Station Units 1 and 2, LRA - Aging Management, Set 4 Project stage: RAI ML13282A3692013-12-13013 December 2013 Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 2 (TAC Nos. MF1879, MF1880, MF1881, and MF1882 Project stage: RAI RS-13-273, Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application2013-12-17017 December 2013 Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application Project stage: Response to RAI RS-13-274, Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application2013-12-19019 December 2013 Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application Project stage: Response to RAI ML13317A0752014-01-13013 January 2014 Requests for Additional Information for Review of Byron, Units 1 & 2, and Braidwood, Units 1 & 2, License Renewal Applications, Set 6 Project stage: RAI RS-14-003, Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application2014-01-13013 January 2014 Bryon, Units 1 and 2, Response to NRC Requests for Additional Information, Set 2, Dated December 13, 2013, Related to the License Renewal Application Project stage: Response to RAI ML14007A6582014-01-22022 January 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 9 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML13309A9322014-01-23023 January 2014 Summary of Telephone Conference Call Held on October 31, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braid Project stage: Draft RAI RS-14-030, Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application2014-02-0404 February 2014 Response to NRC Requests for Additional Information, Set 6, Dated January 13, 2014, Related to License Renewal Application Project stage: Response to RAI ML14006A0212014-02-0606 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application- Aging Management, Set 8 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14023A5642014-02-0707 February 2014 RAI for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 13 (TAC MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14030A5962014-02-10010 February 2014 Requests for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 12 (TAC MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14007A6032014-02-18018 February 2014 Request for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, LRA - Aging Management - Set 17 Project stage: RAI ML14035A1892014-02-20020 February 2014 Summary of Telephone Conference Call Held on January 30, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron Station and Braidw Project stage: Draft RAI ML14035A5342014-02-20020 February 2014 January 22, 2014, Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, Llc., Concerning Draft Requests for Additional Information Pertaining to the Byron Station and Braidwood Station, License Renewal Applica Project stage: Draft RAI RS-14-051, Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application2014-02-27027 February 2014 Response to NRC Requests for Additional Information, Set 8, Dated February 6, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14063A4952014-03-0404 March 2014 Units 1 & 2, Response to NRC Requests for Additional Information, Set 13, Dated February 7, 2014 Re License Renewal Application Project stage: Response to RAI ML14050A1672014-03-0404 March 2014 Summary of Telephone Conference Call on January 23, 2014, Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 11, for Byron-Braidwood License Renewal Application (TAC Nos. MF1879, MF1880, MF1881 Project stage: RAI ML14036A3102014-03-0404 March 2014 Summary of Telephone Conference Call Held on January 28, 2014, Between NRC and Exelon, Concerning RAI Set 10, for the Byron and Braidwood Station, LRA Project stage: RAI ML14051A4312014-03-0404 March 2014 Summary of Telephone Conferene Call Held on January 29, 2014, Between the NRC and Exelon Generating Company, Llc., Concerning RAI Set 10, for the Byron and Braidwood Station License Renewal Application (TAC Nos. MF1879, MF1880, MF1881, and Project stage: RAI ML14051A4282014-03-0606 March 2014 January 13, 2014, Summary of Telephone Conference Call Held Between the NRC and Exelon RAI Set 8, for the Byron and Braidwood Station LRA Project stage: RAI ML14050A0812014-03-0707 March 2014 Correction to Request for Additional Information B.2.1.10-1, Letter Dated February 7, 2014, for the Review of the Byron Station and Braidwood Station, Units 1 and 2, LRA Set 13 Project stage: RAI ML14058B1802014-03-11011 March 2014 Summary of Telephone Conference Call on February 18, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Regarding Byron & Braidwood Stations, License Renewal Project stage: Draft RAI ML14064A4032014-03-11011 March 2014 Summary of Telephone Conference Call on February 27, 2014, Between U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information Re Byron Station & Braidwood Station License Renewal Project stage: Draft RAI ML14064A3912014-03-11011 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 15 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14071A6202014-03-13013 March 2014 Aging Management Programs Audit Report Regarding the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (Tac Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML14072A3692014-03-13013 March 2014 AMP Audit Enclosure (3) Project stage: Other ML14050A3042014-03-14014 March 2014 Scoping and Screening Methodology Audit Report Regarding the Byron Station, and Braidwood Station, Units 1 and 2, LRA Project stage: Other ML14058B1822014-03-18018 March 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 14 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14051A5032014-03-20020 March 2014 Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Set 17 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI RS-14-084, Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application2014-03-28028 March 2014 Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application Project stage: Response to RAI ML14084A3352014-04-0303 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 16 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14073A7052014-04-0303 April 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the NRC and Exelon, Concerning Drais Pertaining to the Byron and Braidwood Station, LRA Project stage: RAI ML14092A3462014-04-0707 April 2014 Project Manager Change for the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: Other ML14092A2612014-04-0707 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 20 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14084A4882014-04-0707 April 2014 03/04/2014 Summary of Telephone Conference Call Held Between NRC and Exelon Generation Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Byron and Braidwood License Renewal Application Set 16 Project stage: Draft RAI ML14094A3662014-04-0808 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 19 Project stage: RAI ML14093B2472014-04-10010 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 18 (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14099A4852014-04-17017 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 & 2, and Braidwood Station, Units 1 & 2, License Renewal Application, Set 21, (TAC Nos. MF1879, MF1880, MF1881, and MF1882) Project stage: RAI ML14099A4932014-04-22022 April 2014 April 03, 2014 Summary of Telephone Conference Call Held Between NRC and Exelon Generation Co., LLC, Concerning Draft Request for Additional Information, Set 21, Pertaining to Byron, Units 1 & 2, Braidwood, Units 1 & 2, License Renewal Appl Project stage: Draft RAI ML14111A1182014-04-24024 April 2014 Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 22 Project stage: RAI ML14107A0772014-04-25025 April 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 23, Pertaining to the Byron Station & Braid Project stage: Draft RAI ML14107A2262014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 21, Pertaining to the Byron Station and Project stage: Draft RAI ML14092A4402014-05-14014 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and Project stage: Draft RAI ML14112A4182014-05-14014 May 2014 Summary of Telephone Conference Call Held on April 10, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 22, Pertaining to the Byron Station and Project stage: Draft RAI ML14094A4252014-05-14014 May 2014 Summary of Telephone Conference Call Held on April 1, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 19, Pertaining to the Byron Station and B Project stage: Draft RAI ML14129A3392014-05-14014 May 2014 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2014-03-11
[Table View] |
Request for Additional Information for the Review of the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application, Set 19ML14094A366 |
Person / Time |
---|
Site: |
Byron, Braidwood |
---|
Issue date: |
04/08/2014 |
---|
From: |
Robinson L License Renewal Projects Branch 1 |
---|
To: |
Gallagher M Exelon Generation Co |
---|
Robinson L, 415-4115 |
References |
---|
TAC MF1879, TAC MF1880, TAC MF1881, TAC MF1882 |
Download: ML14094A366 (10) |
|
|
---|
Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 ML23069A0342023-03-0606 March 2023 Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML23018A1632023-01-18018 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22241A0522022-08-29029 August 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000456/2022004 05000457/2022004 ML22237A0272022-08-25025 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A1272022-04-26026 April 2022 Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A9862022-02-0404 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 ML21350A4372021-12-16016 December 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000456/2022010 and 05000457/2022010 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21228A2352021-08-17017 August 2021 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000457/2021004 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21193A0942021-07-12012 July 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1022021-02-25025 February 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000456/2021010; 05000457/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21020A1292021-01-20020 January 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2021002; 05000457/2021002 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information ML20294A5492020-10-21021 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20104C1452020-04-10010 April 2020 NRR E-mail Capture - Preliminary RAIs for Exelon'S April 6, 2020, Application to Defer Braidwood, Unit 2, Steam Generator Inspections ML20077M2212020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request ML20023A0812020-01-23023 January 2020 NRR E-mail Capture - RAIs for L-2019-LLA-0201 - Braidwood, Units 1 and 2, LAR to Revise TS 3.7.9, Ultimate Heat Sink ML20008D3992020-01-0808 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2020001 ML19350B2952019-12-16016 December 2019 NRR E-mail Capture - Draft Request for Additional Information Regarding Braidwood Station, Units 1 and 2, Impractical Inservice Inspection Requirements (L-2019-LLA-0081) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19252C1542019-08-22022 August 2019 NRR E-mail Capture - Issuance of the Remainder of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19232A2242019-08-0707 August 2019 NRR E-mail Capture - Partial Issuance of Final RAIs for Braidwood/Byron TSTF-505 Application ML19207A0672019-07-26026 July 2019 NRR E-mail Capture - Partial Issuance of Preliminary RAIs for Braidwood/Byron TSTF-505 Application 2023-07-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AprilS, 2014 Mr. Michael P. Gallagher Vice President, License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 SUBJECT REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION, SET 19 (TAG NOS. MF1879, MF1880, MF1881, AND MF1882)
Dear Mr. Gallagher:
By letter dated May 29, 2013, Exelon Generation Company, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses NPF-37, NPF-66, NPF-72, and NPF-77 for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, respectively, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with John Hufnagel, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4115 or by e-mail at Lindsay Robinson@nrc gov.
Sincerely, r / C'i~dsay R. Robinson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454, 50-455, 50-456, and 50-457
Enclosure:
Request for Additional Information cc w/encl: Listserv
- ML14094A366 *concurred via email OFFICE LA:DLW PM: RPB1 :DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME IKing LRobinson YDiazSanabria LRobinson DATE 4/7/14 4/8/14 4/8/14 4/8/14
Letter to M.P. Gallagher from Lindsay R. Robinson dated April 8, 2014
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION, SET 19 (TAC NOS. MF1879, MF1880, MF1881, AND MF1882)
DISTRIBUTION EMAIL:
PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRarb Resource RidsOgcMaiiCenter RidsNrrPMByron Resource RidsNrrPMBraidwood Resource LRobinson DMclntyre, OPA JMcGhee, Rill EOuncan, Rill JBenjamin, Rill AGarmoe, Rill JRobbins, Rill VMillyng, Rill PChandralhil, Rill
BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION, SET 19 (TAG NOS. MF1879, MF1880, MF1881, AND MF1882)
RAI4.2.6-1 Applicability:
Byron Station (Byron) and Braidwood Station (Braidwood), Units 1 and 2
Background:
License renewal application (LRA) Section 4.2.6 describes the time-limited aging analysis (TLAA) for calculation of the low temperature overpressure protection (LTOP) system setpoints.
The LRA slales lhat, in accordance with 10 CFR 54.21(c)(1)(iii), the applicant will use its Reactor Vessel Surveillance Program to establish and report the LTOP system setpoints in order to manage the effects of aging for the period of extended operation (PEO) As described in LRA Section 8.2.1.19, the Reactor Vessel Surveillance Program is a condition monitoring program that provides material and dosimetry data for monitoring irradiation embrittlement through the PEO.
Issue:
To satisfy the requirements of 10 CFR 54.21(c)(1)(iii), the applicant should describe the processes it will use to ensure that the LTOP system setpoints are updated and reported to the NRC prior to entering the PEO. LRA Section 4.2.6 states that the applicant will use its Reactor Vessel Surveillance Program for this purpose. However, the current licensing basis (CLB) already specifies certain processes that the applicant must use to update the LTOP system setpoints. In particular, Technical Specification (TS) 5.6.6 identifies the analytical methods that the applicant must use for establishing the setpoints, and it also requires the applicant to document the setpoints in a Pressure and Temperature Limits Report (PTLR) and provide the report to the NRC for each reactor vessel fluence period and for any revision or supplement thereto. Since the primary purpose of the Reactor Vessel Surveillance Program is for data collection only, the program does not include the specific analytical methods and processes that must be used to establish, document, and report the new LTOP system setpoints in accordance with TS 5.6.6. Because the Reactor Vessel Surveillance Program does not fully implement the requ1rements of TS 5.6.6, it is not clear to the staff why the applicant credits this program for the demonstration required by 10 CFR 54.21(c)(1)(ili).
Request:
Explain why the procedures that implement the requirements of TS 5.6.6 will not be used to establish, document, and report the new LTOP system setpoints prior to entering the PEO, in order to satisfy the requirements of 10 CFR 54.21 (c)(1 )(iii). If any analy1ical methods or processes outside the requirements of TS 5.6.6 will be used to establish, document, and report the new LTOP system setpoints for the PEO, identify and explain the TS changes or additions that are needed per the requirements of 10 CFR 54.22. Based on this response, revise LRA Sections 4.2.6 and A.4.2.6 accordingly.
ENCLOSURE
RAI 4.2.4-1/A.4.2.4-1 Applicability:
Byron and Braidwood
Background:
LRA Section 4.2.4 states that the TLAA on the adjusted reference temperature (ART) calculations is acceptable in accordance with the 10 CFR 54.21 (c)(1 )(ii). LRA Section 4.2.5 states that "the P-T [pressure-temperature]limits for the period of extended operation will be updated prior to expiration of the P-T limits for the current period of operation" and concludes that the TLAA on P-T limits satisfies the requirements of 10 CFR 54.21(c)(1)(iii).
Issue:
The methods of analysis in ASME Section XI, Appendix G, as referenced in 10 CFR Part 50, Appendix G, require an analysis of neutron fluence values at the crack tips of flaws that are postulated to initiate at both the inside (i.e., clad-to-base metal) and outside surfaces of the reactor pressure vessel (RPV) and projected to extend from the postulated crack initiation site to a depth one-quarter of the wall thickness. To be consistent with these regulatory requirements, the methodology in WCAP-14040, Revision 4 (Reference 4.8.2 in the LRA), as mandated by TS 5.6.6, requires the ART calculations (i.e., nil-ductility reference temperature (RT NoT) calculations) to be performed based on an assessment of both the 1/4T and 3/4T neutron fluence values for the RPV beltline and extended beltline components.
LRA Section 4.2.4 does not include any ART values for RPV beltline and extended beltline components that are based on the 3/4T fluence values for the components at 57 effective full-power years (EFPY).
LRA Section A.4.2.4 states that "57 EFPY 1/4T fluence values were used to compute ART values for Byron and Braidwood beltline and extended beltline materials in accordance with Regulatory Guide 1.99, Revision 2 requirements." This is not consistent with WCAP-14040-NP-A as described above.
Request:
- 1. Amend LRA Section 4.2.4 to provide the ART tables and values that are based on an assessment of the 3/4T neutron fluences for the RPV beltline and extended beltline components at 57 EFPY. Amend LRA Section A.4.2.4 to state that both the 57 EFPY 1/4T and 3/4T fluence values were used to compute ART values for Byron and Braidwood beltline and extended beltline materials in accordance with WCAP-14040-NP requirements, as mandated by TS 5.6.6.
- 2. Provide a basis for dispositioning the TLAA on the ART in terms of 10 CFR 54.21(c)(1)(ii). given that these values will be factored into the P-T limits for the period of extended operation. which are being dispositioned as 10 CFR 54.21 (c)(1 )(iii).
Otherwise, revise the LRA to disposition the TLAA for projected ART values in terms of 10 CFR 54.21(c)(1)(iii).
RAI 4.2.5-1/A.4.2.5-1 Applicability:
Byron and Braidwood
Background:
LRA Section 4.2.5 provides the TLAA on the P-T Limits. LRA Section 4.2.5 states that the TLAA is acceptable in accordance with the requirements of 10 CFR 54.21 (c)(1 )(iii) because the applicant's PTLR process will be used to generate the P-T limit curves for the PEO.
Generation of the P-T limit curves using the applicant's PTLR process is currently governed by the TS 5.6.6 and the associated plant implementing procedures. The provisions in TS 5.6.6 require the P-T limits to be generated in accordance with the following NRC-approved methodologies:
- Those methodologies referenced in the NRC letter of January 21, 1998, "Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, Acceptance of Referencing Pressure Temperature Limits Report," which include WCAP-14040-NP-A (current NRC approved version, which is Revision 4 of the report; LRA Reference 4.8.2).
- Those methodologies referenced in the NRC letter of August 8, 2001, "Issuance of Exemption from the requirements of 10 CFR 50.60 and Appendix G for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2."
- WCAP-16143-P, "Reactor Vessel Closure HeadNessel Flange Requirements Evaluation for Byron/Braidwood Units 1 and 2."
The fracture toughness of reactor vessel materials may decrease with time in the presence of sufficient neutron irradiation. Therefore, NRC regulations require monitoring of reactor vessel material fracture toughness during plant operation. P-T limits define the pressure and temperature operating conditions that must be maintained to ensure adequate margins of safety exist on material fracture toughness.
10 CFR Part 50 Appendix G, "Fracture Toughness Requirements,"Section I, "Introduction and Scope," states the following:
This appendix specifies fracture toughness requirements for ferritic materials of pressure-retaining components of the reactor coolant pressure boundary (RCPB) of light water nuclear power reactors to provide adequate margins of safety during any condition of normal operation, including anticipated operational occurrences and system hydrostatic tests, to which the pressure boundary may be subjected over its service lifetime.
Ferritic materials of pressure-retaining components of the RCPB include the following:
(1) Reactor pressure vessel (RPV) forgings (e.g .. RPV nozzles and flanges) and their associated structural welds
(2) Plates or forgings from which the RPV shells and heads were manufactured and their associated structural welds
{3) Ferritic materials in other portions of the RCPB, including those used to fabricate ferritic piping, pumps, valves, and other pressure vessels in the RCPB For LRAs, the regulation in 10 CFR 54.22 requires the LRA to include any TS additions or changes that are necessary to manage the effects of aging during the PEO and the justification for such TS changes or additions to be included in the application.
Issues:
- 1. Licensees must be able to demonstrate that the P-T limits developed for the plant are bounding for all ferritic components in the RCPB, as required by Section I of 10 CFR Part 50, Appendix G. To demonstrate compliance with 10 CFR Part 50, Appendix G, the evaluation of P-T limits considers several factors, including the initial properties and composition of the ferritic materials used to fabricate the RPV components, the accumulated neutron fluence for each component (and hence the neutron embrittlement of the material), and the stress levels applied to the components resulting from operating loads and structural discontinuities. The evaluation of P-T limits that are based solely on an evaluation of ferritic RPV components in the beltline region of the vessel may be insufficient to demonstrate compliance with 10 CFR Part 50, Appendix G. This is because the effects of structural discontinuities for an RPV component with a lower reference temperature (such as a nozzle with a lower neutron fluence) may result in more conservative P-T limits than those that are based on an RPV shell component with a higher reference temperature. Thus, the development of P-T limits for the RPCB must consider not only the RPV beltline shell components with the highest reference temperature but also other RPV components with structural discontinuities, including those that are located outside of the beltline region of the RPV.
The applicant has proposed to address the RCPB and RPV discontinuity issue through an enhancement in LRA Sections 4.2.5 and A.4.2.5 that states the following:
The analysis for the P-T curves will consider locations outside of the beltline such as nozzles, penetrations and other discontinuities to determine if more restrictive P-T limits are required than would be determined by considering only the reactor vessel beltline materials.
lt is not evident to the staff why this issue can be resolved through an enhancement that is defined in LRA Section A.4.2.5. The calculation of the Byron and Braidwood P-T limits is driven by a PTLR process that is mandated by TS 5.6.6 and the PTLR criteria in Generic Letter (GL) 96-03 1 , "Relocation of the Pressure Temperature Limit Curves and Low 1
Generic Letter (GL) 96-03, establishes the NRC policy for processing license amendments to move P-T limit and low temperature overpressure protection system setpoint requirements into an owner's report (the PTLR) controlled by the Administrative Controls Section of the TS. The GL also establishes the TS criteria that need to be proposed for the processing of these license amendments, the minimum criteria that should be tncluded in the methodologies for generating the P-T limits and LTOP system setpoint values for the faciltties, and the information that should be included in the PTLRs. GL 96-03 may be accessed at: http //www. nrc.gov/read tng-rm/doc-collections/gen-comm/gen-letters/1996/gl96003.html.
Temperature Overpressure Protection System Limits," dated January 31, 1996, which dictates that this should be part of the approved methodologies that are referenced in TS 5.6.6.
- 2. The applicant modified its RPV closure flange configuration in 1995 (Braidwood, Unit 2) and in 2010 (Byron, Unit 2), such that one stud cannot be tensioned. However, the methods of analysis in WCAP-16143-P are based on the original plant design configuration, with all original reactor vessel closure studs fully tensioned.
- 3. Based on the issues raised in Parts (1) and (2) above, the staff seeks clarification why a change toTS 5.6.6, Part b., or to the methodologies invoked by TSS 5.6.6, Part b., would not need to be processed as part of the LRA, as mandated by 10 CFR 54.22.
Requests:
- 1. Clarify how the assessment of RPV non-beltline structural discontinuities for its impact on future P-T limits will be performed in accordance with 10 CFR 54.21 (c)(1)(iii) and how this will be factored into the update of the PTLRs that will be submitted to the NRC in accordance TS 5.6.6, Part c. Explain why the assessment of RPV non-beltline structural discontinuities is proposed as part of an enhancement that is defined in LRA Section A.4. 2.5 rather than the NRC policy established in GL 96-03, which would have this type of assessment performed in accordance with 10 CFR Part 50, Appendix G, requirements and included within the scope of at least one of the P-T limit methodologies that are invoked by TS 5.6.6, Part b.
- 2. Explain why the current TS 5.6.6 required methodologies and the plant procedures for implementing the PTLR process are valid for updating the P-T limit curves that will be generated for the PEO, given that the P-T limits minimum temperature requirement methodology in WCAP-16143-P is not based on the configurations of current RPV closure flange assemblies at Byron Unit 2 and Braidwood Unit 2.
- 3. Based on your responses to Requests ( 1) and (2) above, explain whether applicable changes toTS 5.6.6 or to the methodologies invoked by TS 5.6.6 need to be proposed for the LRA in accordance with the requirement in 10 CFR 54.22. Amend LRA Sections 4.2.5 and A.4.2.5, accordingly, if it is determined that either TS 5.6.6 or the methodologies invoked by TS 5.6.6 need to be amended in accordance with the 10 CFR 54.22 requirements.
RAI4.2.5-2 Applicability:
Byron, Unit 2 and Braidwood, Unit 2
Background:
LRA Section 4.2.5 provides the applicant TLAA for accepting the Byron and Braidwood P-T limits in accordance with 10 CFR 54.21 (c)(1 )(iii) and the applicant's PTLR process, which is mandated and controlled by requirements in TS 5.6.6. Updated Final Safety Analysis Report (UFSAR) Section 5.3.2.1 states that the "surveillance program withdrawal schedule is contained in Table 4.1 of the PTLR document for each unit, respectively." UFSAR Section 5.3.2.1 also states that "[c]hanges to the withdrawal schedule may be made as part of an update to the PTLR under the provisions of 10 CFR 50.59."
Pursuant to the requirements in 10 CFR Part 50, Appendix H, "Reactor Vessel Surveillance Program Requirements," changes to a RPV surveillance withdrawal schedule must be submitted to the NRC for review and approvaL Issue:
The NRC's policy for approving license amendments for PTLR processes is given in GL 96-03.
In this GL, the staff only indicated that P-T limit changes and the LTOP system setpoint changes could be processed through a licensee's 10 CFR 50.59 and PTLR processes, so long as the PTLR methodologies approved in the Administrative Controls Section of the TS would be used to make the changes to the P-T limits and the LTOP setpoint values. In contrast, proposed changes to the RPV surveillance program withdrawal schedules for the units are required by 10 CFR Part 50, Appendix H, to be submitted to the NRC for review and approval. The provisions of 10 CFR 50.59 do not apply to the processing of proposed changes to the RPV surveillance program withdrawal schedules.
Request:
Explain the basis for stating that future "[c]hanges to the withdrawal schedule may be made as part of an update to the PTLR under the provisions of 10 CFR 50.59," when the regulation in 10 CFR Part 50, Appendix H, requires proposed changes to RPV surveillance program withdrawal schedules to submitted to the NRC for review and approval.
RAI A.4.2.4-2 Applicability:
Byron and Braidwood
Background:
LRA Section A.4.2.4 provides the UFSAR Supplement summary description for the TLAA on the ART calculations, which were provided in LRA Section 4.2.4.
Issue:
UFSAR Supplement A.4.2.4 references a 200 degree Fahrenheit (200 °F) value in Section C.3 of Regulatory Guide (RG) 1.99, "Radiation Embrittlement of Reactor Vessel Materials,"
Revision 2, and implies that the 200 °F value was included in the RG section to place a limit on the calculation of 1/4T ART values {i.e., 1/4T RT NDT values). Section C.3 of RG 1.99, Revision 2, relates to the bases for RPV material selection when choosing the ferritic steel materials that would be used to fabricate the RPVs of newly constructed plants. In this case, the 200 °F value referenced in Section C.3 of the RG serves only as a recommended ART basis for establishing and limiting the copper (Cu) alloying contents of ferritic steel materials that are procured and used for fabrication of the RPVs in new plants; it does not establish an upper-bound limit on the calculation of those 1/4T ART values after the RPVs are fabricated and the plants are operated.
The reference sentence from LRA Section A.4.2.4 states:
The projections demonstrate that the ART values in the limiting material for each unit will remain below the NRC Regulatory Guide 1.99, Revision 2, Section 3 acceptance criteria of 200 degrees F through the period of extended operation.
Request:
Amend LRA Section A.4.2.4 to be consistent with the 200 °F value basis that is referenced in Section C.3 of RG 1.99, Revision 2, or provide a technical basis for the statement as written.
Otherwise, amend LRA Section A.4.2.4 to delete that statement from UFSAR Supplement Section A.4.2.4.