Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED DI 783BUTION DEMONST 'KTION SYSTEM
~
'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME'ECIPIENT AFFILIATION
SUBJECT:
Monthl g repts for Jul 1991 for Turkey Point Units 3 & .W/910812 r. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/3)LP- &2EB10 1 1 NRR/DOEA/OEAB 1 1 E FILE 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
P.O. Box 029100, Miami, Fl 33102-9100 AU8 12 981 L-91-219 3.'0 CFR 50-36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the July 1991 Operating Status and Summary of Operating. Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i08i60i50 91073i PDR ADOCK 05000250 R PDR ng~>y an FPL Group company
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-250 UNIT Turke Point 3 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Jul 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/0 1/9 1 07/02/91 07/03/91 07/04/9 1 07/05/9 1 07/06/91 07/07/91 07/08/9 1 07/09/9 1 07/10/9 1 07/11/9 1 07/12/9 1 07/13/9 1 07/14/9 1 07/15/9 1 07/16/9 1 07/17/9 1 07/18/91 07/19/91 07/20/9 1 07/2 1/9 1 07/22/9 1 07/23/9 1 07/24/9 1 07/25/9 1 07/2 6/9 1 07/27/91 07/28/9 1 07/29/9 1 07/30/91 07/3 1/9 1
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 8/ 7/91 COMPLETED BY R. A. TIERNEY TELEPHONE 305/246/6970 OPERATING STATUS
- 1. UNI1 NAME: TURKEY POINT UNIT 3
- 2. REPORT ING PERIOD: JULY, 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE 11 HOURS IN REPORT PERIOD: 744 5087 163520.6 12 NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 104473.2 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14 HOURS GENERATOR ON-LINE 0.0 0.0 103055.7 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8 16 GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991 18 NET ELECTRICAL ENERGY GENERATED (MWH) -1267 -7204 64871314 19 UNIT SERVICE FACTOR 0.0 0.0 63.0 20 UNIT AVAILABILITYFACTOR 0.0 0.0 63. 1 21 CAPACITY FACTOR (USING MDC NET)' 0.0 0.0 60.7 22 CAPACI'TY FACTOR (USING DER NET) 0.0 0.0 57.2 23 UNIT FORCED OUTAGE RATE 0.0 0.0 12.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/03/91
41 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 COMPLETED BY
~t.
Turkey Point Unit R. A. Tierney 99 3
REPORT MOTH . July, 1991 ~tt 96-6999 Method of Shutting Ucensee Cause &Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Code4 Codes Prevent Recurrence Reports 22 901212 S 744 N/A EE ENGINE Unit 3 was shutdown for a scheduled Upgrades Outage 2
F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) Rle D - Regulatory Restriction 4 - Continued (NUBEG4161)
E - Operator Training &Ucense Examination 5 - Load Reduction
'
F - Administrative 9 - Other(Exphln)
- Operational Error (Explain) Exhibit1-Same Source H - Other (Exphin)
Ol
~ '
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Jul 1991 Unit 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO' 50-251 UNIT Turke Point 4 DATE Au ust 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Zul 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/0 1/9 1 07/02/91
-07/03/91 07/04/91 07/05/9 1 07/0 6/9 1 07/07/91 07/08/9 1 07/09/9 1 07/10/9 1 07/11/9 1 07/12/9 1 07/13/91 07/14/9 1 07/15/91 07/16/9 1 07/17/9 1 07/18/9 1 07/19/9 1 07/20/9 1 07/2 1/9 1 07/22/91 07/23/9 1 07/24/91 07/25/91 07/2 6/9 1 07/27/91 07/28/91 07/2 9/9 1 07/30/9 1 07/3 1/9 1
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 8/ 7/91 COMPLETED BY R. A. TIERNEY TELEPHONE 305/246/6970 OPERATING STATUS
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: JULY, 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 5087 157252.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 0.0 0.0 97567.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) -'1398 -6188 62047440
- 19. UNIT SERVICE FACTOR 0.0 0.0 62.0
- 20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.1 2'I. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.4
- 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.9
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91
~l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKH NO. 50-.251 UNn NAME Turkey Point in 4 DATE AUgust;-7.";, 19911 COMPLETED BY R. A. Tierney REPORT MpNTH July 1991 TELEPHONE (805) 246-6970 Method of Shutting Licensee Causea Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report At Code 4 Codes Prevent Recurrence 901124 744 0/H N/A RC/EE EUELLXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outages 2
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment FaHure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Everit Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F Administrative
-.
9 - Other(Exphln)
G - Operational Error(Explain) Exhibit1-Same Source H - Other(Exphln)
SUMMARY
OF OPERATING EXPERIENCE'OCKET NO'. 50-251 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH. Jul 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.
~~
p i li U
l