ML17352A377

From kanterella
Revision as of 07:39, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
ML17352A377
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1993
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-008, L-94-8, NUDOCS 9401240146
Download: ML17352A377 (20)


Text

Y E~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CQSU4N4 DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION Florida Power 6 Light Co.

,

KNORR,J.E.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o e 'ng repts for Dec 1993 for Turkey Point Units 3 & 4. 113 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 D N DORS 0 1 1 NRR/DRIL/RPEB 1 1 EG WIXR 01 1 1 RGN2 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

.. Box 029100, Miami, FL, 33102-9100 Jp,N l3 19M L-94-008 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very Truly Yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j. OO 8 pg PDR R 'DR 9401240146 931231 ADOCK 05000250 an PPL Group company

'.

ZEND

//(

F gO

~ $ +>

~p'a ! e I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT llKRH POINT 3 DATE COMPLETED BY TELEPHONE MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93 701 12/02/93 700 12/03/93 699 12/04/93 695 12/05/93 690 12/06/93 692 12/07/93 697 12/08/93 696 12/09/93 693 12/10/93 692 12/11/93 690 12/12/93 703 12/13/93 700 12/14/93 698 12/15/93 697 12/16/93 706 12/17/93 700 12/18/93 704 12/19/93 698 12/20/93 693 12/21/93 692 12/22/93 695 12/23/93 693 12/24/93 694 12/25/93 698 12/26/93 703 3.2/27/93 705 12/28/93 702 12/29/93 694 12/30/93 693 12/31/93 693

J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNlT NAME:

DATE: anuar COMPLETED BY: . . norr TELEPHONE REPORT MONTH DECEMBER 1993 No Date Type'uration (Hours)

Reasons Method Shutting of Licensee Event Spstep Comgnept Cause 4 Corrective Action to Down Reportt Prevent Recurrence Reactors NA N/A NIA 0.0 N/A N/A N/A N/A NIA N/A F Forced Reason Method Exhibit G - Instructions Exhibit 1 same Source s scheduled A Equipment Failure 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram Entrv Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E Operator Traininc 6 5 Load Reduction License Examination 9 Other (Explain)

F Administrative G Operational Error (Explain)

H other (Explain)

aM I',

V II 1

c' c' a I<

if,'yt'f

,p

'

N '.

~

e<

1

'<1 L j C P

OPERATING DATA REPORT DOCKET NO 50 250 DATE 1/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERAT I NG STATUS

1. UNIT NAME: TURKEY POINT UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLffSED Tt IERMAL POWER (MWT ): 2200
4. NAMf:PLATL ttaIING (GROSS MWE): 760
b. DLSl(AN ELECTRI(.AL RATING (NET MWL): 693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 It" CffANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7)

SINCE AST REPORT GIVE REASONS:

t ~

9 POWt.R LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)

'IO HLASONS FOR HFSTRICfIONS ~ IF ANY>>

MONTHLY - YTD- CUMULATIVE 1 1. 1(, HS Itt REPORf PERIOD:

~ 744 8760 184737.6

12. NUMBER OF ttOURS REACTOR WAS CRITICAL 744.0 8501.0 121260. 3
13. fct-af lOR RFSERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. tfOt)HS GENERATOR ON-LING 744.0 8422.6 1 19533. 4 15, uutl fEEsLRvh SrfufDowN H0URs 0.0 0.0 121.8 16 GfCO 5 IftERMA'tEERGY GENERAfEO (MWH) 1637596 1823291'I 248139838 ff. Gffo' El ECTRICAL FNCRGY GENERATED (MWH) 543065 5939690 79581816

'tl. NF,I LLFCTRICAI. ENERGY GENERATED (MWH) 518542 5657345 75269505 IU. UNII EENVICE FACTOR 100. 0 96. 1 64.7

20. UNIT AVAILAUIIITY FACTOR 100. 0 96. 1 64.8
21. caPAcll Y I aclOR (UsING Muc NET) 104. 6 97. 0 62.2 2>>". CAPAC11Y FAC1'OH (USING DER NET) 100. 6 93.2 58.8
23. utEIT I-ORCEO Outa(.E RATE 0.0 1.8 11.8
24. SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS

,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 25 = I f SttUI'OWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f

V I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: ur e own DATE anuar COMPLETED BY orr TELEPHONE:

REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100% power and retained that status through the end of the month.

I E

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURTKP POINT 4 DATE ANUA COMPLETED BY E. N R TELEPHONE MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693

IV 4

'E F

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH DECEMBER 1993 No. Date Type~ Duration (Hours)

Reason* Method of Shutting Licensee Event Sgs t e(m Componept Code Cause 4 Corrective Action to Down Reports Prevent Recurrence Reactors ,

N/A N/A N/A 0.0 N/A N/A N/A N/A N/A N/A F Forced Reason Method Exhibit G - Instructions Exhibit 1 - same source s scheduled A Equipment Failure 1 Manual foz Preparation of Data B Maintenance or Test 2 - Manual Sczam EntrV Sheets Licensee C Refueling Event Report (LER) File D Regulatory restriction 3

4 - Automatic Continued Scram (NUREG-0161)

E Operator Training & 5 Load Reduction License Examination 9 Other (Explain)

F - Administrative G Operational Error (Explain)

H Other (Explain)

1 "l

~ ~ I II << ~

- ~ I' 1

~ C ~ ~,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT: ur e oxn DATE:

TELEPHONE'0-251 anua COMPLETED BY: orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~- power and retained that status through the end of the month.

J

.0 1~

i g

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 1/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERaflNG STA'rUS

1. UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993
3. LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760
5. DESIGN ELECTRICAL RATING (NET MWF.): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)

StNCE LAST REPORT. GIVE REASONS:

9. POwER LEVFL TO wHICH RESTRICTED. IF aNY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

o MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 8760 178469.0

'e

2. NUMBER OF HOURS REACTOR WAS CRIT'AL 744.0 7441. 7 117280.3
13. REAC1'OR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GFNERATOR ON-LINE 744.0 7279.7 113325.0
15. UN11 RESERVE SHUTDOWN HOURS 0.0 0.0 577.3 16 GROSS iHERMat. ENERGY GENERa'rFD (MwH) 1637791 15485620 239059955 17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH) 542820 4995000 76353970
18. tetr El.ECTRICAL ENERGY GENERATEO (MWH) 518449 4746291 72235232
19. UNll SERVICE FaCTOR 100. 0 83.1 63.5
20. UNIT AVAILABlt,lTYFACTOR 100. 0 83.1 63.8
21. capacil'Y Factok (osING MDG NET) 104. 6 81.4 61. 8
22. caknCI1Y FAclDR (UsING DER NET) 100. 6 78.2 58.4
23. UNtl FORCED OitraGE RaTE 0.0 2.0 11.4
24. SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE
25. 1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(~

I