ML20202E987

From kanterella
Revision as of 21:51, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/86-09 on 860303-07.No Violation or Deviation Noted
ML20202E987
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/09/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20202E993 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8604140084
Download: ML20202E987 (2)


See also: IR 05000298/1986009

Text

e ,

APR - 91986

In Reply Refer To:

Docket: 50-298/86-09

4

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

3 P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Mr. R. Wise and Dr. J. B. Nicholas of

this office during the period March 3-7, 1986, of activities authorized by NRC

Operating License DPR-46, for Cooper Nuclear Station, and to the discussion of

our findings with Mr. G. R. Horn and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included your chemistry / radiochemistry

program, radiochemistry confirmatory measurements, and whole body counting

system confirmatory measurements. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors. The inspection findings are

j documented in the enclosed inspection report.

J Within the scope of the inspection, no violations or deviations were identified.

'

, Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

.

Sincerely,

, CridnM Signed By

J. E. Gag;!ardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure: 1

Appendix - NRC Inspection Report I

50-298/86-09

cc w/ enclosure: (see next page)

1

RIV:FRP FRPS k C:FRPS 0:0 C:RPS/ h C:RPB /

JBNicholas/tw RWise BMurray RLE rt JPJaudon JEGagiajdo

3 /;t1I/86 3 /28/86  %/ 86 ch/yg /86 Y/2 /86 g/ 7 8(

6604140084 860409 ~"

if

PDR ADOCK 05000298 gd

  • IV

.. . . . .

l}\

.

_ _ _ . . _ _ __ _ _ _

. .

Nebraska Public Power District -2-

,

cc w/ enclosure:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

l P. O. Box 98

l Brownville, Nebraska 68321

Kansas Radiation Control Program Director

,

l Nebraska Radiation Control Program Director

bec to DMB (IE06)

bcc distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin,.RA .

'

  • Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015

l *R&SPB *RSB

  • MIS System *J. B. Nicholas
  • RIV File *R. Wise
  • RSTS Operator *B. Murray

R. L. Bangart

  • w/766

l

l

i

l

c

l

l

i. . . . - . - - _ , _ - - -

- -_--. _ , _ . - - - . _ _ _ . . - . , _ _- _ . ., _ . - .

-_

.