ML20202E987
| ML20202E987 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/09/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20202E993 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8604140084 | |
| Download: ML20202E987 (2) | |
See also: IR 05000298/1986009
Text
e
,
APR - 91986
In Reply Refer To:
Docket:
50-298/86-09
4
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
3
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Mr. R. Wise and Dr. J. B. Nicholas of
this office during the period March 3-7, 1986, of activities authorized by NRC
Operating License DPR-46, for Cooper Nuclear Station, and to the discussion of
our findings with Mr. G. R. Horn and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included your chemistry / radiochemistry
program, radiochemistry confirmatory measurements, and whole body counting
system confirmatory measurements. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
The inspection findings are
j
documented in the enclosed inspection report.
J
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this inspection, we will be pleased to
,
'
discuss them with you.
.
Sincerely,
CridnM Signed By
,
J. E. Gag;!ardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
1
Appendix - NRC Inspection Report
50-298/86-09
cc w/ enclosure:
(see next page)
1
C:RPS/ h
C:RPB /
FRPS k
C:FRPS
0:0
RIV:FRP
JEGagiajdo
JBNicholas/tw RWise
BMurray
rt
JPJaudon
3 /;t1I/86
3 /28/86
% /
86 ch/yg /86
Y/2 /86
g/
8(
7
6604140084 860409
if
~"
ADOCK 05000298
gd
IV l}\\
..
.
.
.
.
.
_
_
_
. . _ _
__
_ _ _
.
.
Nebraska Public Power District
-2-
,
cc w/ enclosure:
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
l
P. O. Box 98
l
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
,
l
Nebraska Radiation Control Program Director
bec to DMB (IE06)
bcc distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin,.RA
.
l
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
'
- R&SPB
- RSB
- MIS System
- J. B. Nicholas
- RIV File
- R. Wise
- RSTS Operator
- B. Murray
R. L. Bangart
- w/766
l
l
i
c
l
l
i.
. . . - . - -
, _ - -
-
-
- - - .
_ , _ . - - - .
_ _ _ . . - . , _
_- _
.
.,
_ . - .
.
-_