ML20155F829

From kanterella
Revision as of 12:51, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for May 1988 for Waterford Unit 3
ML20155F829
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/31/1988
From: Burski R, Killona L
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
W3P88-126, NUDOCS 8806170067
Download: ML20155F829 (7)


Text

.

. s NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3-MAY 1988 The unit completed its second refueling / maintenance outage during the month.

C

} (] 1

/

8806170067 880531 PDR ADOCK 05000382 R DCD _ - _ . . ________ ________ __________________

r

. s PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of May 1988, there were no pressurizer safety valve failures or challenges.

i

)

OPERATING DATA REPORT

' UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/ LA DATE: JUNE'1988 OPERATING STATUS

~

1. - Docket:' 50-382 Notes
2. Reporting Period: May 1988
3. Utility

Contact:

GEORGE MILLER

. Phone Number: (504) 467-8211

4. Iicensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Mwe): 1153
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075 __
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
10. Power Level To Which Restricted, if Any'(Net MWe): NONE
11. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
12. Hours In Reporting Period 744 3647.0 23544.0
13. Number Of Hours Reactor Was Critical 61.0 2168.7 18273.3
14. Reactor Reserve Shutdown Hours .15 Hours Generator On-Line 2.8 2055.8 17870.2
16. ' Unit Reserve Shutdown Hours _

i

[

T ,

.0PERATING-DATA REPORT (Continued)

This Month Yr.-to-Date- Cumulative-

c 17-. GrossLThermal Energy 3,254 6,861,039 58,322,011 Generated (KWH)
18. Gross Electrical Energy 340 2,324,730 19',705,540 Generated (MWH)

- 19. Het Electrical Energy -12,028 2,204,605 18,729,074 Generated-(MWH)

20. Unit Service Facter 0.4 56.4 75.9
21. Unit' Availability Factor 0.4 56.4 75.9
22. Unit Capacity Factor 0.0 56.2 74.0 (Using MDC Net) 123. Unit ~ Capacity Factor 0.0 _

54.8 72.1-(Using DER Net)

24. Unit Forced Outage Rate 0.0 5.1 7.5

' 25. Unit Forced Outage Hours _0.0 111.3 1447.6

. 26. Shutdowns-Scheduled over Next 6 Months (Type, Date, and Duration of Each):

27. LIf Shut Down At End of Report Period, Estimated Date Of Startup:
2 8. Units In Test Status (Prior to Commercial Operation)

Forecast Achieved i INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 v

. . . ~ . ._, . _ , _...__,,_.-.m

ii, *-

AVERAGE. DAILY UNIT POWER LEVEL.

DOCKET NO. 50-382-UNIT WATERFORD 3

'DATE JUNE 1988' COMPLETED BY' GEORGE MILLER TELEPHONE 504-467-8211 MONTH MAY 1988

_ DAY AVERAGE DAILY POWER LEVEL . DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1- -9 17 -11 2 18 -11 3 -10 19 -11 4 20 -12 5 -9 '21 -13

.6 -9 22 -13 7 -11 23 -13 8 -11 24 -15 9 -11 25 -23 10- -12 26 -31

'11 -12 27 12- -11 28 -40 13 -11 29 -41

, 14 -8 30 -41 15 -11 31 -28 16 -12 i

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

k

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR MAY 1988

' DOCKET NO- 382'

' UNIT NAME' WATERFORD 3 DATE JUNE 1988 .

COMPLETED BY GEORGE MILLER TELEPHONE ~- - 504-467-8211 Method cf Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Type 1 , (HOURS) REASON 2 Down Reactor 3 Report. # Codei Codes Prevent Recurrence 88-03 880401 S 741.2 C,B 4 N/A N/A. N/A Refueling / Maintenance Outage #2.

Total = 1436.7 1 2 3 F: Forced Reason: Method S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

I C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4 E-Operator Training & 5-Load Reduction IEEE Std. 805-1984 License Examination .9-Other 5 F-Administrative IEEE Std. 803A-1983:

G-Operational Error (Explain)

Il-Other (Explain) o .

O

4*

  • 4, P. O. BOX UD40 LOUISI& AN POWER A/

LIGHT 317 NEWBARONNESTREET +

ORLEANS, LOUISTANA 70160 *

(504)195-3100 UTN NhysNM June 15, 1988 F3P88-1226 A1.05 C1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enciosed is the subject monthly report which covers the operating stata tics for the month of May 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

~

A.F.Burski Manager -

Nuclear Safety & Regulatory Affairs RFB:LWL:ssf Enclosure cc: R.D. Martin, NRC Region IV NRC Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson h)$

1 \

i "AN EQUAL OPPORTUNITY EMPLOYER"