ML17352A531

From kanterella
Revision as of 07:36, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1994 for Turkey Point Units 3 & 4.W/940413 Ltr
ML17352A531
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1994
From: Mowrey C, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-086, L-94-86, NUDOCS 9404180387
Download: ML17352A531 (14)


Text

t ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t

~

REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSXON NBR:9404180387 DOC.DATE: 94/03/31 NOTARXZED: NO DOCKET g FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON MOWREY,C.L. Florida Power & Light Co.

PLUNKETT,T.F.

RECIP.NAME Florida RECIPIENT AFFILXATION Power & Light. Co. gR I

SUBJECT:

Monthly operating repts for Mar 1994 for Turkey Point Units D 3 & 4.W/940413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: A RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DRIL/RPEB E~IMS OEAB01 N~RJJ30 1 1

1 1 RGN2 1

1 1

1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

FPL',pp i8 L-94-086 "i934 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S. D..Ebneter, Regional Administrator, Region II, USNRC T P. Johnson,

~ Senior Resident Inspector, USNRC, Turkey Point Plant g ~OQ QQ5 9404180387 940331 I.

PDR R

ADOCK 05000250

, PDR I

I(

an Fpt Group company

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE COMPLETED BY A ril 11 1994 C. L. Mowre TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 691 3/02/94 692 3/03/94 695 3/04/94 700 3/05/94 698 3/06/94 693 3/07/94 687 3/08/94 682 3/09/94 680 3/10/94 677 3/11/94 681 3/12/94 690 3/13/94 691 3/14/94 687 3/15/94 687 3/16/94 687 3/17/94 684 3/18/94 684 3/19/94 682 3/20/94 677 3/21/94 663 3/22/94 663 3/23/94 660 3/24/94 665 3/25/94 667 3/26/94 666 3/27/94 665 3/28/94 667 3/29/94 668 3/30/94 673 3/31/94 677

UNIT SHUTDOWNS: AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point $ 3 DATE:

COMPLETED BY:

A ril C. L. Mowre 11 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 No. Date Duration Reason2 Method of Licensee System Component Cause S Corrective Action to Type'/A (Hours) Shutting Event Code code Prevent Recurrence Down Reports Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit G - instructions Exhibit - Same Source S - Scheduled A Equipment Failure 1 - Manual for Preparation of Data 1

B - Maintenance or Test Refueling 2 - Manual Scram Entry Sheets Licensee C 3 Automatic Scram Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training S 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/1 1/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 186897.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160.0 123420.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 2112.2 121645.5
15. UNIT RESERVE SHUTDOWN HOURS 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1637553 4612879 252752717
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 529680 1507515 81089331
18. NET ELECTRICAL ENERGY GENERATED (MWH) 505949 1437959 76707464
19. UNIT SERVICE FACTOR 100.0 97.8 65. 1
20. UNIT AVAILABILITYFACTOR 100.0 97.8 65.2
21. CAPACITY FACTOR (USING MDC NET) 102. 1 100.0 62.6
22. CAPACITY FACTOR (USING DER NET) 98. 1 96. 1 59.2
23. UNIT FORCED OUTAGE RATE 0.0 2.2 11.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 1994
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE:

COMPLETED BY A

C.

ril 11 L. Mowre 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially 100% and maintained that level throughout the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point DATE COMPLETED BY A ril 11 1994 C. L. Mowre 4

TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 696 3/02/94 696 3/03/94 698 3/04/94 703 3/05/94 701 3/06/94 698 3/07/94 692 3/08/94 688 3/09/94 686 3/10/94 257 3/11/94 0 3/12/94 0 3/13/94 0 3/14/94 0 3/15/94 0 3/16/94 0 3/17/94 0 3/18/94 351 3/19/94 619 3/20/94 676 3/21/94 672 3/22/94 671 3/23/94 671 3/24/94 670 3/25/94 672 3/26/94 673 3/27/94 673 3/28/94 674 3/29/94 675 3/30/94 682 3/31/94 685

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME:

DATE COMPLETED BY: C. L. Mowre A ril 11 1994 TELEPHONE 305 246-6204 REPORT MONTH MARCH 1994 No. Date Type Duration Reason Yethod of Licensee System Cause 4 Corrective Action to (Hours) Shutting Event Code Component Code Prevent Recurrence Down Reportf Reactor 02 031094 184.77 251-94-002 PIPEXX Shutdown to repair Yovable Incore Detector Flux Yapper Guide Tube 03 031894 0.0 N/A CC PIPEXX Steam Generator Chemistry Hold-point at 30%

F - Forced Reason Yethod Exhibit 0 Instructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 - Yanual for Preparation of Data 1

B Haintenance or Test 2 - Yanual Scram Entry Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 Load Reduction License Examination 9 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

~ ~

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/11/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS> IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 180629.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 568.9 1984. 9 119265.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GFNERATOR ON-LINE 559.2 1975. 2 115300.2
15. UNIT RESERVE SHUTDOWN HOURS 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1210387 4279371 243339326
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392485 1396955 77750925
18. NET ELECTRICAL ENERGY GENERATED (MWH) 372330 1330585 73565817
19. UNIT SERVICE FACTOR 75.2 =

91.4 63.8

20. UNIT AVAILABILITYFACTOR 75.2 91.4 64.2
21. CAPACITY FACTOR (USING MOC NET) 75.1 92.5 62. 1
22. CAPACITY FACTOR M(USING DER NET) 72.2 88.9 58.8
23. UNIT FORCED OUTAGE RATE 24.8 8.5 12.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ ~

~

'UMMARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point DATE COMPLETE BY:

A ril 11 1994 C. L. Mowre 4

TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100% power. On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system.

Following completion of the repair, the unit had a hold-point at 30% for steam generator chemistry. The unit was returned to essentially 100% power on March 19, and remained at that level through the end of the month.