ML17352A377

From kanterella
Revision as of 04:22, 26 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
ML17352A377
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1993
From: KNORR J E, PLUNKETT T F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-008, L-94-8, NUDOCS 9401240146
Download: ML17352A377 (20)


Text

Y E~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS): CQSU4N4 FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C , AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power 6 Light Co.PLUNKETT,T.F.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251

SUBJECT:

Monthly o e'ng repts for Dec 1993 for Turkey Point Units 3&4.113 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA N DORS 0 EG WIXR 01 EXTERNAL EGGG BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME RAGHAVAN,L AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

..Box 029100, Miami, FL, 33102-9100 Jp,N l3 19M L-94-008 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9'.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very Truly Yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j.OO 8 pg 9401240146 931231 PDR ADOCK 05000250'.R'DR an PPL Group company ZEND//(

F gO~$+>~p'a!eI AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 llKRH POINT 3 MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 12/02/93 12/03/93 12/04/93 12/05/93 12/06/93 12/07/93 12/08/93 12/09/93 12/10/93 12/11/93 12/12/93 12/13/93 12/14/93 12/15/93 12/16/93 12/17/93 12/18/93 12/19/93 12/20/93 12/21/93 12/22/93 12/23/93 12/24/93 12/25/93 12/26/93 3.2/27/93 12/28/93 12/29/93 12/30/93 12/31/93 701 700 699 695 690 692 697 696 693 692 690 703 700 698 697 706 700 704 698 693 692 695 693 694 698 703 705 702 694 693 693 J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNlT NAME: 50-250 DATE: anuar COMPLETED BY:..norr TELEPHONE REPORT MONTH DECEMBER 1993 No Date Type'uration (Hours)Reasons Method of Shutting Down Reactors Licensee Event Reportt Spstep Comgnept Cause 4 Corrective Action to Prevent Recurrence NA N/A NIA 0.0 N/A N/A N/A N/A NIA N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Traininc 6 License Examination F-Administrative G-Operational Error (Explain)H-other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entrv Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-same Source aM V I', II 1 c'if,'yt'f ,p'~N'.'<1 L a I<c'1 e<j C P OPERATING DATA REPORT OPERAT I NG STATUS DOCKET NO 50-250 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLff SED Tt IERMAL POWER (MWT): 2200 4.NAMf:PLATL ttaIING (GROSS MWE): 760 b.DLSl(AN ELECTRI(.AL RATING (NET MWL): 693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 It" CffANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE t AST REPORT~GIVE REASONS: 9 POWt.R LEVEL TO WHICH RESTRICTED.

IF ANY (NET MWE)'IO HLASONS FOR HFSTRICfIONS

~IF ANY>>MONTHLY-YTD-CUMULATIVE 1 1.~1(, HS Itt REPORf PERIOD: 12.NUMBER OF ttOURS REACTOR WAS CRITICAL 13.fct-af lOR RFSERVE SHUTDOWN HOURS 14.tfOt)HS GENERATOR ON-LING 15, uutl fEEsLRvh SrfufDowN H0URs 16 GfCO 5 IftERMA'tEERGY GENERAfEO (MWH)ff.Gffo'El ECTRICAL FNCRGY GENERATED (MWH)'tl.NF,I LLFCTRICAI.

ENERGY GENERATED (MWH)IU.UNII EENVICE FACTOR 20.UNIT AVAILAUII ITY FACTOR 21.caPAcll Y I aclOR (UsING Muc NET)2>>".CAPAC11Y FAC1'OH (USING DER NET)23.utEIT I-ORCEO Outa(.E RATE 24.SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS ,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 744 744.0 0.0 744.0 0.0 1637596 543065 518542 100.0 100.0 104.6 100.6 0.0 8760 8501.0 0.0 8422.6 0.0 1823291'I 5939690 5657345 96.1 96.1 97.0 93.2 1.8 184737.6 121260.3 844.4 1 19533.4 121.8 248139838 79581816 75269505 64.7 64.8 62.2 58.8 11.8 25=I f SttUI'OWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f V I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETED BY TELEPHONE:

50-250 ur e own anuar orr REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100%power and retained that status through the end of the month.

I E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURTKP POINT 4 ANUA E.N R MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693

'E F IV 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-251 REPORT MONTH DECEMBER 1993 No.Date Type~Duration (Hours)Reason*Method of Shutting Down , Reactors Licensee Event Reports Sgs t e(m Componept Code Cause 4 Corrective Action to Prevent Recurrence N/A N/A N/A 0.0 N/A N/A N/A N/A N/A N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Sczam 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions foz Preparation of Data EntrV Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-same source 1"l~~I II<<~-~I'1

~C~~,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE'0-251 ur e oxn anua orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~-power and retained that status through the end of the month.

J.0 1~i g OPERaflNG STA'rUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993 3.LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760 5.DESIGN ELECTRICAL RATING (NET MWF.): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)StNCE LAST REPORT.GIVE REASONS: 9.POwER LEVFL TO wHICH RESTRICTED.

IF aNY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: o MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 'e 2.NUMBER OF HOURS REACTOR WAS CRIT'AL 13.REAC1'OR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UN11 RESERVE SHUTDOWN HOURS 16 GROSS iHERMat.ENERGY GENERa'rFD (MwH)17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)18.tetr El.ECTRICAL ENERGY GENERATEO (MWH)19.UNll SERVICE FaCTOR 20.UNIT AVAILABlt,lTY FACTOR 21.capacil'Y Factok (osING MDG NET)22.caknCI1Y FAclDR (UsING DER NET)23.UNtl FORCED OitraGE RaTE 24.SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE 744 744.0 0.0 744.0 0.0 1637791 542820 518449 100.0 100.0 104.6 100.6 0.0 8760 7441.7 0.0 7279.7 0.0 15485620 4995000 4746291 83.1 83.1 81.4 78.2 2.0 178469.0 117280.3 166.6 113325.0 577.3 239059955 76353970 72235232 63.5 63.8 61.8 58.4 11.4 25.1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(~I