ML17353A597

From kanterella
Revision as of 08:41, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr
ML17353A597
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/29/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-067, L-96-67, NUDOCS 9603190371
Download: ML17353A597 (17)


Text

CATEGORY 1 REGULATCiO INFORMATION DISTR ECTION%STEM (RIDE)C.>>>>>>.:~il'i FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C".J'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C AU'AH.NAME

'U'AR AFFILIATION KNORR,J.E.

Florpda Power&Tight Co.HOVEY,R.J.

Flor)da Power&Light Co.RECIP.NAME RE)IPIENT AFFILIATION

'J DOCKET¹05000250 05000251 SUBJECT.: Month}y 3&4 960313 DISTRjBUTION CODE: IE24D TITLE: Monthly Operating NOTES: repts for Feb 1996 for Turkey Point Units COPIES RECEIVED:LTR I ENCL I SIZE:!Q Report (per Tech Specs)RECIPL'ENT ID CODE/NAME PD2-1.PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB FRATERNAL LITCO BRYCE F J H NRC PDR COPIES LTTR ENCL 1 1'1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R FILE CENTER 01 R NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUl'RED:

LTTR 9'ENCL E I'L FPL NAR13 1996 L-96-067 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, Robert J.Hovey Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant yBOO54 e~OS1~0S71 Vao~ae PDR ADOCK 05000250 R PDR an FPL Group company 1 i P OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 3/7/96 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: FEBRUARY 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHE~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LZNE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHj 18.NET ELECTRZCAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NONE 696 550.3 0.0 526.6 0.0 3%$768 323526 306886 75.7 75.7 66.2 63.6 24.3 1440 1294.3 0.0 1270.6 0.0 2rSV227 862310 821685 88.2 88.2 85.7 82.3 11.8 203697.6 138200.2 844.4 136166.2 121.8 2FK61246 91099295 86235081 66.8 66.9 64.5 61.1 11'25.ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

IP 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.-ZL25Q.TELEPHONE:

REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Reports System code'caponent code'ause 4 Corrective Action to Prevent Recurrence 01 960201 0.0 N/A FILTERS GRASS fOULING Of INTAKE SCREENS/STRAI HERS 02 960201 0.0 N/A HH HTEXCH WATER BOX CLEANING 03 960201 0.0 N/A HB VALVEX TURBINE VALVE TEST 04 960209 53.5 LER 96-002 CC HTEXCH AUTO TRIP DUE TO HIGH S/G WATER LEVEL 05 960212 0.0 N/A CH VALVEX FAILURE Of MAIN FEEDWATER PUMP CHECK VALVE 06 960216 83.5 N/A f I LTERS GRASS FOULING Of INTAKE SCREENS/STRAINERS 07 960219 32.4 NA RB INSTRU ROD CONTROL PROBLEMS F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination F-Administrative C-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9 Other (Explain)Exhibit 0-Instructions for preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-same Source AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 317 371 685 699 709 707 702 686 604 0 0 246 379 384 371 58 0 0 0 0 383 683 686 687 687 686 686 686 686 DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH Unit 3 began operation for the month at 60%reactor power.Power was reduced to 40%for a turbine valve test on February 2.Power was returned to 60%power for waterbox and heat exchanger cleaning on February 2 and taken to 100%power on February 3.The unit remained at essentially 100%power until February 9.On February 9 power was reduced to 60%power for waterbox cleaning and testing of a main feed water pump discharge check valve.During this testing an automatic reactor trip occurred on February 9 due to hi-hi steam generator water level, which is discussed in LER 96-002.The unit was restarted on February 11 and operated at approximately 60%during repair of the main feed water pump discharge check valve.On February 16 the unit was taken to Mode 3 due to a grass influx into the intake and remained off line until February 19.The unit was taken to Mode 2 on February 19 however returned to Mode 3 due to rod control problems.The unit was returned to power on February 21 and remained at essentially 100%power through the end of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 689 688 689 698 709 709 707 704 700 693 692 697 701 700 697 695 703 705 700 695 690 681 675 681 681 678 678 670 664 C

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 3/7/96 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: FEBRUARY 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 696 12.NUMBER OF HOURS REACTOR 696.0 13.REACTOR RESERVE SHUTDOWN HOURS 0.0 14.HOURS GENERATOR ON-LINE 696.0 15.UNIT RESERVE SHUTDOWN HO 0.0 17.GROSS ELECTRICAL ENERGY GENERATED (MWH7 504313 18.NET ELECTRICAL ENERGY GENERATED (MWH)481644 19.UNIT SERVICE FACTOR 100.0 20.UNIT AVAILABILITY FA 100.0 21.CAPACITY FACTOR (USING MD 103.9 22.CAPACITY FACTOR (USING DER NET)99.9 23.UNIT FORCED OUTAGE RATE 0.0 24.SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR MARCH 1996 1440 1440.0 0.0 1440.0 0.0 ST59845 1046564 999512 100.0 100.0 104.2 100.2 0.0 197429.0 134925.8 166.6 130833.2 577.2 YKE33102 88585705 83884427 66.3 66.6 64.7 61.3 10.2 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor'icensee Event Reports Systen Code Conponent Code'ause 4 Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Exan (nation F-Adninistratlve C-Operational Error (Explain)H-Othor (Explain)Method 1-Manual 2-Manual Scran 3-Autonatic Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit 0-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG 0161)Exhibit 1-Sane Sourco

)J~~DOCKET NO.UNIT'ATE'EPORT MONTH Unit 4 operated at essentially 100%reactor power for the month.A T,, coast down, due to fuel depletion, was begun at the end of the month in anticipation of the scheduled refueling shutdown on March 4.

.0 lt 1