| | title = Partially Withheld Insp Rept 50-285/87-23 on 871116-20 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Previously Identified Items,Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization | | | title = Insp Rept 50-285/87-23 on 870727-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp in Accordance W/Section XI of ASME Boiler & Pressure Vessel Code |
| | author name = Kelly J, Yandell L | | | author name = Hunnicutt D, Tapia J, Westerman T |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| | addressee name = | | | addressee name = |
Line 10: |
Line 10: |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-285-87-32, NUDOCS 8801250474 | | | document report number = 50-285-87-23, NUDOCS 8709010425 |
| | package number = ML20148D715 | | | package number = ML20237F796 |
| | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS |
| | page count = 1 | | | page count = 9 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:_ _ - _ - _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ | | {{#Wiki_filter:y |
| ,
| | . . |
| O APPENDIX B
| | APPENDIX , |
| | U.S. NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION IV== |
| | NRC Inspection Report: 50-285/87-23 License: DPR-40 Docket: 50-285 |
| | { |
| | Licensee: Omaha Public Power District (OPPD) |
| | 1623 Harney Street Omaha, Nebraska 68102 l Facility Name: Fort Calhoun Station, Unit 1 (FCS) |
| | Inspection At: FCS, Blair, Nebraska Inspection Conducted: July 27-31, 1987 Inspectors: oh N// w w m e d (' h/24'/3 7 . |
| | D. M. Hunnicutt, Chief, Operations Section Date |
| | ' |
| | Reactor Safety Branch j 4n1 8 [A6 [B} |
| | J. }< Tapia', Rebcton Inspector, Operations Dat'e |
| | ' |
| | ShcVion, Reactor %fety Branch Approved: #I CiC ft/[i* f/Z f /f'7 p T. F. Westerman, Chief, Reactor Safety Branch Odte Inspection Summary Inspection Conducted July 27-31, 1987 (Report 50-285/87-23) |
| | Areas Inspected: Routine, unannounced inspection of inservice inspection in i |
| | accordance with Section XI of the ASME B&PV Cod Results: Within the area inspected, no violations or deviations were identifie ' |
| | g9010425070828 G ADOCK 05000285 PDR |
| | |
| | _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ |
| | . |
| | . . |
| | |
| | DETAILS Persons Contacted OPPD |
| | *W. G, Gates, Plant Manager |
| | *C. Bloyd, Senior Nuclear Production Engineer J. Ressler, Senior Test Engineer |
| | *A. Richard, Quality Assurance (QA) Manager |
| | *K. Stultz, Acting Manager, Technical Services |
| | *D. Munderloh, Senior Engineering, Licensing |
| | *T. J. McIvor, Plant Technical Supervisor |
| | *R. Kellogg, Supervisor, Mechanical Technical Services |
| | *R. Mueller, Supervisor, Maintenance Engineering |
| | *Present at the exit intervie . Inservice Inspection (ISI) |
| | An inspection was conducted to determine whether inservice testing of Class 1, 2, and 3 pressure retaining components was being conducted in compliance with the technical requirements described in 10 CFR Part 50.55a(g) and Section XI of the American Society of Mechanical Engineer's (ASME) Boiler and Pressure Vessel (B&PV) Code and with the QA requirements of Appendix B to 10 CFR Part 5 The OPPD " Inservice Inspection Program Plan for the 1983-1993 Interval" i defines the ISI program for the second 10 year inspection period. This i document was reviewed by the NRC inspectors to verify compliance with the specified testing and QA requirements. The review provided verification that the following attributes were correctly addressed: ISI program is in conformance with relevant ASME Code Section XI edition and addend Program incorporates the results of previous inserviu and preservice inspection Additional examinations are performed as required by ASME Section XI, Subsection IWF-243 Listings of partial or limited examinations are tabulate Relevant indications or conditions exceeding the allowable limits specified are evaluated in accordance with the provisions set forth in ASME Section XI, Subsection IWA-300 < . |
| | . |
| | 3 The services of an Authorized Nuclear Inservice Inspector (ANII) are procured and the ISI plan is reviewed by the ANII in accordance with Subsection IWA-2120 of the ASME Cod QA program is in place and includes methods for records retention, corrective action, and audits or surveillance of contractor ISI activitie The FCS ISI program is under contract to Ebasc The overall description of the quality program in effect for ISI activities is contained in Ebasco Inservice Inspection Quality Assurance Manual. The manual describes the organizational structure of the ISI group of the QA department and references detailed procedures that constitute the total QA program that was established to maintain quality throughout all phases of ISI activitie Implementation of the second 10-year inspection period program was assessed by reviewing the procedures utilized and test records produced during three refueling outage During March and April 1984, the first ISI of the second interval was performed to provide compliance with the ASME B&PV Code Section X , |
| | Visual, liquid penetrant, magnetic particle and ultrasonic examination ! |
| | methods were employed in this inspectio The following procedures, utilized to perform the ISI, were reviewed by the NRC inspectors: |
| | No. FC-UT-1, Revision 1, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials" No. FC-UT-2, Revision 0, " Ultrasonic Manual Examination of Class 1 |
| | & 2 Vessel Welds Excluding Reactor Pressure Welds" No. FC-VT-3, Revision 0, " Manual Ultrasonic Examination of Nozzle Liner Radius" No. FC-UT-4, Revision 0, " Ultrasonic Manual Examination of Reactor Pressure Vessel Welds" No. FC-MT-1, Revision 0, " Magnetic Particle Examination of Welds & |
| | Bolting" |
| | * No. FC-PT-1, Revision 0, " Liquid Penetrant Examination" No. FC-VT-1, Revision 0, " Visual Examination of Fit-Ups, Welds, Bolting, and Component Internals" No. FC-VT-3, Revision 0, " Visual Examination for Mechanical and Structural Condition of Components and Their Supports" |
| | |
| | _ _ - - _ |
| | <. . |
| | |
| | In November 1985, the second ISI of the second interval was performe The following procedures, utilized to perform this ISI, were reviewed by the NRC inspectors: |
| | No. FC-PT-1, Revision 0, " Liquid Penetrant Examination" No. FC-MT-1, Revision 0, " Magnetic Particle Examination of Welds & |
| | Bolting" No. FC-VT-1, Revision 0, " Visual Examination of Fit-Ups, Welds, Bolting, and Component Internals" No. FC-VT-3, Revision 0, " Visual Examination for Mechanical and Structural Condition of Components and Their Supports" No. FC-UT-1, Revision 2, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials" No. FC-UT-2, Revi. ion 1, " Manual Ultrasonic Examination of' Class 1 |
| | & 2 Vessel Welds Lxcluding Reactor Pressure Vessel Welds" No. FC-UT-3, Revision 1, " Manual Ultrasonic Examination of Nozzle Inner Radius" No. FC-UT-4, Revision 0, " Ultrasonic Manual Examination of Reactor Pressure Vessel Welds" No. FC-UT-5, Revision 0, " Manual ' Ultrasonic Examination of Flange Ligament Areas of Reactor Vessel" No. FC-UT-6, Revision 1, " Ultrasonic Examination of Reactor Pressure Vessel Studs" No. FC-UT-7, Revision 0, " Ultrasonic Examination of Class 1 & 2 Vessel Welds Less Than or Equal to 2 Inches" No. FC-UT-8, Revision 0, " Ultrasonic Examination of Bolts and Studs Exceeding 2 Inches" No. FC-UT-0 Revision 0, " Ultrasonic Manual Examination of RPV Flange-to-Shell Weld" |
| | , |
| | During the March through May 1987 refueling outage, the third ISI of the second interval was performed. The following procedures, utilized to perform this ISI, were reviewed by the NRC inspectors: Procedure No. FC-PT-1, " Liquid Penetrant Examination," Revision 1, dated November 26, 1986, defined the requirements.for. color contrast solvent removable LP of nuclear reactor system components, in j accordance with ASME B&PV Code, Section XI, 1980 including Winter Addenda for 1980. |
| | |
| | c - _ - - _ - _ _ _ _ - - _ - - _ - - -_-_- _ |
| | |
| | . . |
| | . ) |
| | l |
| | |
| | b. Procedure No. FC-MT-1, " Magnetic Particle Examination of Welds and Bolting," Revision 1, dated February 22, 1984, defined.the minimum i procedural requirements to be used in performing surface examinations of components by the MP method in accordance with ASME B&PV Code, Section V, Article c. Procedure No. FC-VT-1, " Visual Examination: VT-1," Revision 1, dated December 16, 1986, described the requirements for visual examination as stipulated by ASME B&PV Code, Section XI. The principal objective of the procedure was to detect and locate abnormal conditions of |
| | , |
| | l l parts, components, and surface ' |
| | l d. Procedure No. FC-VT-3, " Visual Examination: VT-3 and VT-4 l (Limited)," Revision 1, dated December 17, 1986, described the requirements for visual examination VT-3 and VT-4 (Limited) as 1 stipulated by ASME B&PV Code, Section XI. The principal objective was to determine the general mechanical and' structural conditions of pump casings, valve body internals, components and their supports, including verification of setting i e. Procedure No. FC-UT-CP-2, " Procedure for Inspection System Performance Checks," Revision 0, dated November 27, 1986, described the methods used to perform screen height linearity, amplitude 1 control linearity, and beam spread characteristics ASME B&PV Code, 'j Sections V and XI, including Winter 1980 Addenda are a part of this procedure. |
| | |
| | l f. Procedure No. FC-UT-1, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials," Revision 3, dated November 20, 1986, described the manual ultrasonic testing (UT) of full penetration similar and dissimilar metal Class 1 and 2 piping welds ranging in thickness from 0.2 to 6 inches in accordance with the requirements of ASME B&PV Code, Section XI. |
| | |
| | l g. Procedure No. FC-UT-2, " Ultrasonic Examination of Class 1 & 2 Vessel |
| | . |
| | Welds Greater Than 2 Inches," Revision 2, dated December 2, 1986, I described the manual UT of full penetration Class 1 and 2 vessel welds in ferritic material greater than 2 inches in thickness, excluding reactor vessel welds in accordance with ASME B&PV Code, l |
| | Section X h. Procedure No. FC-UT-3, " Manual Ultrasonic Examination of Nozzles," |
| | Revision 2, dated December 1, 1986, described UT of nozzle inner radii of Class 1 vessels and to nozzles exceeding 12-inch nominal pipe size in Class 2 vessels over inch in thickness. This procedure required that examination be conducted from the outside surface of the vessel and/or nozzle utilizing angle beam techniques. |
| | |
| | l i. Procedure No. FC-UT-4, " Ultrasonic Examination of Reactor Pressure Vessel Welds," Revision 1, dated December 2, 1986, described manual contact UT of full penetration Class 1 reactor Wssel welds greater |
| | ___ _______ _ _____-__-_-_ _ _ __ - _-_-___ - _-_ ______-_ __ .__ __ _ _ _ _ - - _ - - - - _ - - - _ _ _ _ _ _ - |
| | |
| | a .' . |
| | |
| | than 2 inches in thickness in accordance with ASME B&PV Code, i Section X Procedure No. FC-UT-5, " Manual Ultrasonic Examination of Flange ! |
| | Ligament Areas of Reactor Vessel," Revision 0, dated December 4, 1984, described the manual UT of ligament areas up to 7 inches around ; |
| | the stud holes in the reactor pressure vessel flange in accordance ' |
| | with ASME B&PV Code, Section XI, including Winter 1980 Addend Procedure No. FC-UT-6, " Ultrasonic Examination of Reactor Pressure |
| | , Vessel Studs," Revision 1, dated September 25, 1985, described the manual UT of Reactor Pressure Vessel Stud . Procedure No. FC-UT-7, " Ultrasonic Examination of Class 1 & 2 Vessel Welds Less Than or Equal to 2 Inches," Revision 1, dated November 24, i 1986, described the manual UT of full penetration Class 1 & 2 vessel J welds less than or equal to 2 inches in thickness in accordance with i ASME B&PV Code, Section X i Procedure No. FC-UT-8, " Ultrasonic Examination of Bolts and Studs Exceeding 2 Inches," Revision 0, dated December 7, 1984, described the UT of bolts and studs exceeding 2 inches in diameter in accordance with ASME B&PV Code, Section XI, including Winter 1980 Addenda, Procedure No. FC-UT-9, " Ultrasonic Manual Examination of RPV Flange-to-Shell," Revision 0, dated September 16, 1985,-described the manual UT of the reactor pressure vessel flange-to-shell weld, in accordance with ASME B&PV Code, Section XI,. including Winter 1980 Addenda, Procedure No. FC-UT-10. "UT Examination for Laminar and Planar Reflections, Material Thickness & Geometric Conditions," Revision 0, dated April 10, 1987, described straight beam U ~ |
| | i |
| | ' |
| | The review of the above listed procedures provided verification that the following attributes were correctly addressed: Requirements were specified and agreed with commitments, including specified or referenced acceptance level Qualifications of NDE personnel were specified and in accordance with the approved ISI progra Methods of recording, evaluating, and dispositioning findings were established. |
| | |
| | , Reporting requirements were in compliance with applicable code |
| | { requirements and the records identified for retention included: |
| | * |
| | examination results and data sheets l |
| | l - _ - _ - _ _ - _ _ _ _ - - - _ _ _ - _ - - _ - - _ _ _ _ _ - _ _ _ _ _ _ - - - - _ . - - _ - - - - - - - - - - - - _ - - _ - - - - - - - |
| | |
| | r |
| | . . |
| . | | . |
| U.S. NUCLEAR REGULATORY COMMISSION REGION IV !
| |
| !
| |
| -NRC Inspection Report: 50-285/87-32 Operating License: DPR-40 Docket: 50-285 Licensee: Omaha Public Power District (0 PPD)
| |
| 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station (FCS)
| |
| Inspection At: FCS, Blair, Nebraska Inspection Conducted: November 16-20, 1987 i
| |
| Inspector: J cha$ b m O Il/2MP7 J. A.'F. Kelly, Se Wo M hysica curity Date SpecialistRadiobgicalProtetionand Safeguards Branch i
| |
| Approved: lhh 12/2 R/P7 L. A. Yandell, Chief, Radiological Protection Date
| |
| ~
| |
| and Safeguards Branch ,
| |
| Inspection Summary 3 l Inspection Conducted November 16-20, 1987 (Report 50-285/87-32)
| |
| Areas Inspected: Routine, unannounced inspection including followup on previously identified items; security plan and implementing procedures; management effectiveness; security organization; records and reports; locks, keys, and combinations; physical barriers vital area; compensatory measures; lighting; access control packages and vehicles; detection aids - vital area; i
| |
| , communications; and personnel training and qualificatio '
| |
| Results: Within the areas inspected, two violations were identified (security guard suitability documentation, paragraph 7; and access authorization vehicles, paragraph 12).
| |
|
| |
|
| | film and tape records, as applicable examination equipment data records of consumable materials such as penetrant materials and-ultrasonic test couplants calibration data sheets Methods of examination, extent, and technique were adequately described and in conformance with the requirements and guidance of ASME Code, Section V, " Nondestructive Examination." |
| | |
| | The NRC inspectors reviewed the available certification records for all NDE test personnel involved in the three ISIS. All Ebasco personnel performing examinations were certified in accordance with Ebasco Procedure No. NDE-1, " Qualification and Certification of Nondestructive Examination l Personnel." This procedure meets the requirements of American Society for Nondestructive Testing (ASNT) Recommended Practice No. SNT-TC-1A, |
| | " Personnel Qualification and Certification in Nondestructive Testing." |
| | |
| | This ASNT document requires written testimony of qualification. |
| | |
| | l The documentation was available (statements, etc..) of verification of |
| ' | | ' |
| .
| | previous employment and education, however, it wasn't onsite. This is considered an unresolved item (285/8723-01) until the licensee can locate the requested documentation and make it available to the inspector for review. |
| G DR Nk5 PDR OSE CONTAINS .
| | |
| UPON SEPARATION THIS
| | l The NRC inspectors reviewed records of all examinations performed during the three ISIS. Components which were examined included the reactor pressure vessel, pressurizer, regenerative heat exchanger, main reactor coolant piping, safety injection, containment spray, feedwater, and shutdown cooling system Elements of these systems which were examined included longitudinal welds, circumferential welds, nozzle welds, safe-end welds and bolts. Included in the review of the ISI data were calibration records for UT and examination records for all NDE methods. The examination records included the following information: |
| < | | type of NDE performed materials utilized in performance of examination calibration parameters for UT examinations area of component examined i date examination performed personnel performing examination results of examination All examinations which revealed relevant indications or conditions were identified and documented on the affected examination record. Relevant indications exceeding the allowable limits specified in the NDE procedures were evaluated in accordance with the provisions set forth in ASME Section XI, Subsection IWA-3000. |
| PAGE IS DECONTROLLE _
| | |
| | l t |
| | |
| | _ _ _ _ _ _ _ - - - - - - |
| | .. . |
| | |
| | The review of the ISI data provided verification that the data covered the scope of examination required by the approved ISI progra No violations or deviations were identified during this inspectio . Exit Interview The NRC inspectors met with licensee representatives denoted in paragraph I at the conclusion of the inspection and discussed the results of the inspection. |
| | |
| | \ |
| | i I |
| | %^j rp*. .. ', |
| | I;/ , .,, |
| | r . -U |
| | , , |
| | - . . . |
| | . |
| | _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _ |
| | |
| | .. |
| | ' |
| | ! |
| | **,! |
| | ! |
| | ! |
| | ! |
| | < |
| | l |
| | ) |
| | i i |
| | i |
| | . |
| | I |
| | |
| | Y |
| | ;'g f g \~ 05 SO 4aHED |
| | , |
| }} | | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:UTILITY
MONTHYEARIR 05000285/19900421990-11-0707 November 1990 Insp Rept 50-285/90-42 on 901015-19.No Violation or Deviations Noted.Major Areas Inspected:Events Re Engineering Ongoing Design Basis Reconstitution Effort IR 05000285/19900351990-09-25025 September 1990 Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Maint,Surveillance,Security & Radiological Protection Observations IR 05000285/19900341990-08-16016 August 1990 Insp Rept 50-285/90-34 on 900730-0803.Fire Protection/ Prevention Program Satisfatory.Unresolved Item Re Proper Fire Rating Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Emergency Diesel Generator Problems IR 05000285/19900331990-08-15015 August 1990 Advises That Insp Rept 50-285/90-33 Canceled.No Rept Will Be Issued for Rept Number IR 05000285/19900301990-07-24024 July 1990 Insp Rept 50-285/90-30 on 900513-0616.No Violations Noted. Major Areas Inspected:Monthly Maint,Surveillance,Security, Complex Surveillance Observation,Review of Licensee Outage Plans & Verification of Containment Integrity IR 05000285/19900311990-07-13013 July 1990 Informs That Insp 50-285/90-31 Canceled.No Insp Rept Will Be Issued IR 05000285/19900261990-06-15015 June 1990 Insp Rept 50-285/90-26 on 900416-0512.Noncited Violations Noted.Major Areas Inspected:Operational Safety Verification, Monthly Maint,Surveillance,Security & Onsite Followup of Events & in-ofc Review of Repts IR 05000285/19900251990-06-12012 June 1990 Partially Withheld Insp Rept 50-285/90-25 on 900402-06 & 16- 19 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Physical Security Program,Including Previous Insp Findings, Security Plan,Testing & Maint,Locks,Keys & Combinations IR 05000285/19890321989-09-27027 September 1989 Insp Rept 50-285/89-32 on 890801-31.Violations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint Observations,Monthly Surveillance Observations & Security Observations ML20246F0811989-08-23023 August 1989 Insp Rept 50-285/89-30 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Implementation of Corrective Actions in Response to NRC Bulletin 87-002 Concerning Fastener Testing IR 05000285/19890281989-08-23023 August 1989 Insp Rept 50-285/89-28 on 890701-31.No Violations or Deviations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours & Monthly Maint Observations IR 05000285/19890261989-07-24024 July 1989 Insp Rept 50-285/89-26 on 890601-30.Violations & Deviations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours,Security Observations & Monthly Maint Observations IR 05000285/19890271989-07-10010 July 1989 Insp Rept 50-285/89-27 on 890622-23.Violations Noted.Major Areas Inspected:Testing of Turbine Driven Auxiliary Feedwater Pump ML20246N0751989-07-0606 July 1989 Insp Rept 50-285/89-01 on 890313-31 & 0417-21.Violations Noted.Major Areas Inspected:Exams of Work Control Procedures & Representative Records,Interviews & Observations of Work in Progress by NRC Inspectors IR 05000285/19890251989-06-26026 June 1989 Insp Rept 50-285/89-25 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000285/19890231989-06-16016 June 1989 Partially Withheld Insp Rept 50-285/89-23 on 890508-10 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Security Program Audits & Vital Area Barriers ML20245C9331989-06-15015 June 1989 Insp Rept 50-285/89-22 on 890501-31.Violations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint Observations,Monthly Surveillance Observations & Security Observations IR 05000285/19890201989-06-14014 June 1989 Assessment Rept 50-285/89-20 on 890417-21 & 0502.Concerns Noted Re Util Steps to Institutionalize Aspects of Safety Enhancement Program.Overall Improvement Demonstrated ML20244C0901989-06-0202 June 1989 Insp Rept 50-285/89-24 on 890508-12.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to Emergency Plan & Implementing Procedures & Supplies IR 05000285/19890171989-06-0101 June 1989 Insp Rept 50-285/89-17 on 890401-30.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Plant Tours,Monthly Maint & Surveillance Observations,Security Observations & Radiological Protection Observations IR 05000285/19890211989-05-23023 May 1989 Insp Rept 50-285/89-21 on 890417-21.No Violations Noted. Major Areas Inspected:Facility Mods & Training & Licensed Operator & Nonlicensed Staff Training ML20247K4771989-05-17017 May 1989 Insp Rept 50-285/89-13 on 890301-31.Violations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours, safety-related Sys Walkdown & Monthly Maint Observations IR 05000285/19890181989-05-15015 May 1989 Cancels Insp Rept 50-285/89-18 IR 05000285/19890161989-05-0404 May 1989 Partially Withheld Insp Rept 50-285/89-16 on 890327-31 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Safety Enhancement Plan,Audits & Vital Area Barriers IR 05000285/19890151989-04-14014 April 1989 Insp Rept 50-285/89-15 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing After Refueling & Followup to Previous Insp Findings IR 05000285/19890091989-03-24024 March 1989 Insp Rept 50-285/89-09 on 890201-28.Violations & Deviations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint & Surveillance Observations & Security Observations IR 05000285/19890111989-03-23023 March 1989 Insp Rept 50-285/89-11 on 890227-0303.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radwaste Mgt Programs IR 05000285/19890101989-03-21021 March 1989 Partially Withheld Insp Rept 50-285/89-10 on 890227-0303 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Physical Security Program,Including Mgt Support & Security Program Audits & Security Training & Qualifications ML20236A1751989-03-0707 March 1989 Insp Rept 50-285/89-12 on 890221-24.No Violations or Deviations Noted.Major Areas inspected:post-mod Testing & Followup on Main Steam Safety Valve Issue ML20235Y7561989-03-0303 March 1989 Insp Rept 50-285/89-05 on 890130-0203.Violation Noted.Major Areas Inspected:Previously Identified Insp Findings, Implementation of ATWS Requirements & LERs ML20235U4431989-02-27027 February 1989 Insp Rept 50-285/89-03 on 890101-31.Violation Noted.Major Areas Inspected:Previously Identified Items,Ler Followup, Operational Safety Verification,Plant Tours,Monthly Maint Observations & Monthly Surveillance Observations ML20235M5171989-02-17017 February 1989 Insp Rept 50-285/89-08 on 890206-10.Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000285/19890021989-02-15015 February 1989 Insp Rept 50-285/89-02 on 890130-0203.Violations Noted. Major Areas Inspected:Low Power Physics Testing,Complex Surveillance & Reactor Thermal Shield Sway Test Results ML20235K1421989-02-14014 February 1989 Insp Rept 50-285/89-04 on 890117-20.Four Apparent Violations Noted.Major Areas Inspected:Allegation Re High Radiation Area Incident on 890126 IR 05000285/19880431988-12-0101 December 1988 Insp Rept 50-285/88-43 on 881114-18.One Violation & Unresolved Item Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Structural Welding Activities IR 05000285/19880341988-11-14014 November 1988 Insp Rept 50-285/88-34 on 881016-21.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Current Refueling Outage & Allegations Re Conduct of Radiation Protection Program IR 05000285/19880371988-11-0303 November 1988 Insp Rept 50-285/88-37 on 881017-21.Violation Noted.Major Areas Inspected:Design Changes & Mods,Receipt,Storage & Handling of Equipment & Matls & Measuring & Test Equipment IR 05000285/19880321988-11-0303 November 1988 Insp Rept 50-285/88-32 on 880901-30.Violation Noted.Major Areas Inspected:Followup on Previously Identified Items, Operational Safety Verification,Plant Tours,Monthly Maint Observations & Security Observations ML20206B9641988-11-0303 November 1988 Insp Rept 50-285/88-37 on 881017-21.Violation Noted.Major Areas Inspected:Design Changes & Mods,Receipt,Storage & Handling of Equipment & Matls & Measuring & Test Equipment IR 05000285/19880401988-11-0202 November 1988 Insp Rept 50-285/88-40 on 881024-28.Violation Noted.Major Areas Inspected:Welding & NDE Activities IR 05000285/19880381988-10-26026 October 1988 Partially Withheld Insp Rept 50-285/88-38 on 881004-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Security Observations IR 05000285/19880311988-10-18018 October 1988 Insp Rept 50-285/88-31 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Welding,Design Changes & Mods,Procurement & Receipt,Storage & Handling of Equipment & Matls IR 05000285/19880301988-09-21021 September 1988 Insp Rept 50-285/88-30 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program for External & Internal Radiation Exposure Control Programs & Surveys IR 05000285/19880271988-09-21021 September 1988 Insp Rept 50-285/88-27 on 880801-31.No Violations or Deviations Noted.Major Areas Inspected:Ler Followup, Operational Safety Verification,Plant tours,safety-related Sys Walkdown & Monthly Maint Observations ML20154L2961988-09-19019 September 1988 Insp Rept 50-285/88-25 on 880808-19.Violation Noted.Major Areas Inspected:Followup to Previous Insp Findings,Followup to Lers,Temporary Instructions & 10CFR Part 21 Repts IR 05000285/19880281988-09-16016 September 1988 Insp Rept 50-285/88-28 Om 880822-26.Violations Noted.Major Areas Inspected:Fire Protection/Prevention Program, Triennial post-fire Safe Shutdown Capability Reverification & Followup on Previously Identified Items IR 05000285/19880261988-09-14014 September 1988 Insp Rept 50-285/88-26 on 880725-29.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Implementation of Inservice Testing Program for Valves & Pumps,Procedures,Results,Training,Witnessing & Maint IR 05000285/19880241988-09-0707 September 1988 Partially Withheld Insp Rept 50-285/88-24 on 880725-28 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Followup on Previously Identified Items,Lers,Review of Security Plan & Implementation Procedures & Compensatory Measures ML20207H7311988-08-19019 August 1988 Insp Rept 50-285/88-23 on 880701-31.Violations Noted.Major Areas Inspected:Previously Identified Items,Operational Safety Verification,Plant tours,safety-related Sys Walkdown & Monthly Maint,Surveillance & Security Observations ML20154K1311988-08-19019 August 1988 Insp Rept 50-285/88-200 on 880218,0321-25 & 0404-08. Violations Noted.Major Areas Inspected:Adequacy of Corrective Actions Initiated by Licensee in Response to 47 Design Findings Identified in Insp Rept 50-285/85-22 1990-09-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-IV-99-048, on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant1999-10-26026 October 1999 PNO-IV-99-048:on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant IR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-025, on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned1999-05-14014 May 1999 PNO-IV-99-025:on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility ML20206R1601999-01-0808 January 1999 Notice of Violation from Insp on 981005-23 & 1211.Violations noted:licensee-established Measures Failed to Assure Prompt Identification & Effective Corrective Action to Address Potential for Core Reactivity Change IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities ML20198J2051998-12-17017 December 1998 Notice of Deviation from Insp on 981131-1204.Deviation Noted:Licensee Quality Assurance Dept Conducted Biennial Audits of All Transfer,Packaging & Transport Activities Involving Radioactive Matl IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support ML20195H8021998-11-20020 November 1998 Notice of Violation from Insp on 981102-06.Violation Noted: from 4:45 to 11:45 Am on 980423,room 13 on Elevation 989 Ft of Auxiliary Building Not Posted as Airborne Radioactivity Area When Sample Results Showed Excess Radioactivity IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight ML20236W2931998-07-29029 July 1998 Notice of Violation from Insp on 980606-10.Violation Noted: Licensee Did Not Take Dry Active Samples Annually.Dry Active Waste Stream Samples Were Collected in June 1995 & Aug 1997 IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7531998-07-0808 July 1998 Notice of Violation from Insp on 980521-0605.Violation Noted:On 980520,licensee Personnel Did Not Write Maint Work Document to Document Deficiency W/Valve FP-230 Following Manipulation of Valve ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A6171998-06-15015 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980402,licensee Did Not Have Adequate Procedure for Performing Activity That Affected Quality PNO-IV-98-021A, on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized1998-05-26026 May 1998 PNO-IV-98-021A:on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized ML20249C1431998-05-24024 May 1998 Notice of Violation from Insp on 980415-24.Violation Noted: Inspectors Identified That Licensee Had Not Submitted in 1984 & 1994 Relief Requests for Code Class Welds That Did Not Receive Full Exam Coverage During 10-yr ISI Intervals IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint PNO-IV-98-021, on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 9805211998-05-21021 May 1998 PNO-IV-98-021:on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 980521 ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support ML20217N0931998-04-30030 April 1998 Notice of Violation from Insp on 980406-10.Violation Noted: on 980407,individual Working in Accordance W/Radiation Work Permit 98-0011 Entered Restricted High Radiation Area in Steam Generator Bay B W/O Radiation Protection Coverage IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217E0061998-04-22022 April 1998 Notice of Violation from Insp on 980301-0411.Violation Noted:Inspectors Identified That Licensee Did Not Have Procedure for Performing an Activity That Affected Quality ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support ML20217D4471998-03-25025 March 1998 Notice of Violation from Insp on 980209-13 W/In Ofc Insp Until 980302.Violation Noted:Since Aug 1994 QA Lead Auditor Had Not Satisfied or Completed QA Qualification Manual Requirements Prior to Conducting Lead Auditor Functions IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] |
Text
y
. .
APPENDIX ,
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-285/87-23 License: DPR-40 Docket: 50-285
{
Licensee: Omaha Public Power District (OPPD)
1623 Harney Street Omaha, Nebraska 68102 l Facility Name: Fort Calhoun Station, Unit 1 (FCS)
Inspection At: FCS, Blair, Nebraska Inspection Conducted: July 27-31, 1987 Inspectors: oh N// w w m e d (' h/24'/3 7 .
D. M. Hunnicutt, Chief, Operations Section Date
'
Reactor Safety Branch j 4n1 8 [A6 [B}
J. }< Tapia', Rebcton Inspector, Operations Dat'e
'
ShcVion, Reactor %fety Branch Approved: #I CiC ft/[i* f/Z f /f'7 p T. F. Westerman, Chief, Reactor Safety Branch Odte Inspection Summary Inspection Conducted July 27-31, 1987 (Report 50-285/87-23)
Areas Inspected: Routine, unannounced inspection of inservice inspection in i
accordance with Section XI of the ASME B&PV Cod Results: Within the area inspected, no violations or deviations were identifie '
g9010425070828 G ADOCK 05000285 PDR
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
.
. .
DETAILS Persons Contacted OPPD
- W. G, Gates, Plant Manager
- C. Bloyd, Senior Nuclear Production Engineer J. Ressler, Senior Test Engineer
- A. Richard, Quality Assurance (QA) Manager
- K. Stultz, Acting Manager, Technical Services
- D. Munderloh, Senior Engineering, Licensing
- T. J. McIvor, Plant Technical Supervisor
- R. Kellogg, Supervisor, Mechanical Technical Services
- R. Mueller, Supervisor, Maintenance Engineering
- Present at the exit intervie . Inservice Inspection (ISI)
An inspection was conducted to determine whether inservice testing of Class 1, 2, and 3 pressure retaining components was being conducted in compliance with the technical requirements described in 10 CFR Part 50.55a(g) and Section XI of the American Society of Mechanical Engineer's (ASME) Boiler and Pressure Vessel (B&PV) Code and with the QA requirements of Appendix B to 10 CFR Part 5 The OPPD " Inservice Inspection Program Plan for the 1983-1993 Interval" i defines the ISI program for the second 10 year inspection period. This i document was reviewed by the NRC inspectors to verify compliance with the specified testing and QA requirements. The review provided verification that the following attributes were correctly addressed: ISI program is in conformance with relevant ASME Code Section XI edition and addend Program incorporates the results of previous inserviu and preservice inspection Additional examinations are performed as required by ASME Section XI, Subsection IWF-243 Listings of partial or limited examinations are tabulate Relevant indications or conditions exceeding the allowable limits specified are evaluated in accordance with the provisions set forth in ASME Section XI, Subsection IWA-300 < .
.
3 The services of an Authorized Nuclear Inservice Inspector (ANII) are procured and the ISI plan is reviewed by the ANII in accordance with Subsection IWA-2120 of the ASME Cod QA program is in place and includes methods for records retention, corrective action, and audits or surveillance of contractor ISI activitie The FCS ISI program is under contract to Ebasc The overall description of the quality program in effect for ISI activities is contained in Ebasco Inservice Inspection Quality Assurance Manual. The manual describes the organizational structure of the ISI group of the QA department and references detailed procedures that constitute the total QA program that was established to maintain quality throughout all phases of ISI activitie Implementation of the second 10-year inspection period program was assessed by reviewing the procedures utilized and test records produced during three refueling outage During March and April 1984, the first ISI of the second interval was performed to provide compliance with the ASME B&PV Code Section X ,
Visual, liquid penetrant, magnetic particle and ultrasonic examination !
methods were employed in this inspectio The following procedures, utilized to perform the ISI, were reviewed by the NRC inspectors:
No. FC-UT-1, Revision 1, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials" No. FC-UT-2, Revision 0, " Ultrasonic Manual Examination of Class 1
& 2 Vessel Welds Excluding Reactor Pressure Welds" No. FC-VT-3, Revision 0, " Manual Ultrasonic Examination of Nozzle Liner Radius" No. FC-UT-4, Revision 0, " Ultrasonic Manual Examination of Reactor Pressure Vessel Welds" No. FC-MT-1, Revision 0, " Magnetic Particle Examination of Welds &
Bolting"
- No. FC-PT-1, Revision 0, " Liquid Penetrant Examination" No. FC-VT-1, Revision 0, " Visual Examination of Fit-Ups, Welds, Bolting, and Component Internals" No. FC-VT-3, Revision 0, " Visual Examination for Mechanical and Structural Condition of Components and Their Supports"
_ _ - - _
<. .
In November 1985, the second ISI of the second interval was performe The following procedures, utilized to perform this ISI, were reviewed by the NRC inspectors:
No. FC-PT-1, Revision 0, " Liquid Penetrant Examination" No. FC-MT-1, Revision 0, " Magnetic Particle Examination of Welds &
Bolting" No. FC-VT-1, Revision 0, " Visual Examination of Fit-Ups, Welds, Bolting, and Component Internals" No. FC-VT-3, Revision 0, " Visual Examination for Mechanical and Structural Condition of Components and Their Supports" No. FC-UT-1, Revision 2, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials" No. FC-UT-2, Revi. ion 1, " Manual Ultrasonic Examination of' Class 1
& 2 Vessel Welds Lxcluding Reactor Pressure Vessel Welds" No. FC-UT-3, Revision 1, " Manual Ultrasonic Examination of Nozzle Inner Radius" No. FC-UT-4, Revision 0, " Ultrasonic Manual Examination of Reactor Pressure Vessel Welds" No. FC-UT-5, Revision 0, " Manual ' Ultrasonic Examination of Flange Ligament Areas of Reactor Vessel" No. FC-UT-6, Revision 1, " Ultrasonic Examination of Reactor Pressure Vessel Studs" No. FC-UT-7, Revision 0, " Ultrasonic Examination of Class 1 & 2 Vessel Welds Less Than or Equal to 2 Inches" No. FC-UT-8, Revision 0, " Ultrasonic Examination of Bolts and Studs Exceeding 2 Inches" No. FC-UT-0 Revision 0, " Ultrasonic Manual Examination of RPV Flange-to-Shell Weld"
,
During the March through May 1987 refueling outage, the third ISI of the second interval was performed. The following procedures, utilized to perform this ISI, were reviewed by the NRC inspectors: Procedure No. FC-PT-1, " Liquid Penetrant Examination," Revision 1, dated November 26, 1986, defined the requirements.for. color contrast solvent removable LP of nuclear reactor system components, in j accordance with ASME B&PV Code,Section XI, 1980 including Winter Addenda for 1980.
c - _ - - _ - _ _ _ _ - - _ - - _ - - -_-_- _
. .
. )
l
b. Procedure No. FC-MT-1, " Magnetic Particle Examination of Welds and Bolting," Revision 1, dated February 22, 1984, defined.the minimum i procedural requirements to be used in performing surface examinations of components by the MP method in accordance with ASME B&PV Code,Section V, Article c. Procedure No. FC-VT-1, " Visual Examination: VT-1," Revision 1, dated December 16, 1986, described the requirements for visual examination as stipulated by ASME B&PV Code,Section XI. The principal objective of the procedure was to detect and locate abnormal conditions of
,
l l parts, components, and surface '
l d. Procedure No. FC-VT-3, " Visual Examination: VT-3 and VT-4 l (Limited)," Revision 1, dated December 17, 1986, described the requirements for visual examination VT-3 and VT-4 (Limited) as 1 stipulated by ASME B&PV Code,Section XI. The principal objective was to determine the general mechanical and' structural conditions of pump casings, valve body internals, components and their supports, including verification of setting i e. Procedure No. FC-UT-CP-2, " Procedure for Inspection System Performance Checks," Revision 0, dated November 27, 1986, described the methods used to perform screen height linearity, amplitude 1 control linearity, and beam spread characteristics ASME B&PV Code, 'j Sections V and XI, including Winter 1980 Addenda are a part of this procedure.
l f. Procedure No. FC-UT-1, " Ultrasonic Examination of Class 1 & 2 Piping Welds Joining Similar & Dissimilar Materials," Revision 3, dated November 20, 1986, described the manual ultrasonic testing (UT) of full penetration similar and dissimilar metal Class 1 and 2 piping welds ranging in thickness from 0.2 to 6 inches in accordance with the requirements of ASME B&PV Code,Section XI.
l g. Procedure No. FC-UT-2, " Ultrasonic Examination of Class 1 & 2 Vessel
.
Welds Greater Than 2 Inches," Revision 2, dated December 2, 1986, I described the manual UT of full penetration Class 1 and 2 vessel welds in ferritic material greater than 2 inches in thickness, excluding reactor vessel welds in accordance with ASME B&PV Code, l
Section X h. Procedure No. FC-UT-3, " Manual Ultrasonic Examination of Nozzles,"
Revision 2, dated December 1, 1986, described UT of nozzle inner radii of Class 1 vessels and to nozzles exceeding 12-inch nominal pipe size in Class 2 vessels over inch in thickness. This procedure required that examination be conducted from the outside surface of the vessel and/or nozzle utilizing angle beam techniques.
l i. Procedure No. FC-UT-4, " Ultrasonic Examination of Reactor Pressure Vessel Welds," Revision 1, dated December 2, 1986, described manual contact UT of full penetration Class 1 reactor Wssel welds greater
___ _______ _ _____-__-_-_ _ _ __ - _-_-___ - _-_ ______-_ __ .__ __ _ _ _ _ - - _ - - - - _ - - - _ _ _ _ _ _ -
a .' .
than 2 inches in thickness in accordance with ASME B&PV Code, i Section X Procedure No. FC-UT-5, " Manual Ultrasonic Examination of Flange !
Ligament Areas of Reactor Vessel," Revision 0, dated December 4, 1984, described the manual UT of ligament areas up to 7 inches around ;
the stud holes in the reactor pressure vessel flange in accordance '
with ASME B&PV Code,Section XI, including Winter 1980 Addend Procedure No. FC-UT-6, " Ultrasonic Examination of Reactor Pressure
, Vessel Studs," Revision 1, dated September 25, 1985, described the manual UT of Reactor Pressure Vessel Stud . Procedure No. FC-UT-7, " Ultrasonic Examination of Class 1 & 2 Vessel Welds Less Than or Equal to 2 Inches," Revision 1, dated November 24, i 1986, described the manual UT of full penetration Class 1 & 2 vessel J welds less than or equal to 2 inches in thickness in accordance with i ASME B&PV Code,Section X i Procedure No. FC-UT-8, " Ultrasonic Examination of Bolts and Studs Exceeding 2 Inches," Revision 0, dated December 7, 1984, described the UT of bolts and studs exceeding 2 inches in diameter in accordance with ASME B&PV Code,Section XI, including Winter 1980 Addenda, Procedure No. FC-UT-9, " Ultrasonic Manual Examination of RPV Flange-to-Shell," Revision 0, dated September 16, 1985,-described the manual UT of the reactor pressure vessel flange-to-shell weld, in accordance with ASME B&PV Code,Section XI,. including Winter 1980 Addenda, Procedure No. FC-UT-10. "UT Examination for Laminar and Planar Reflections, Material Thickness & Geometric Conditions," Revision 0, dated April 10, 1987, described straight beam U ~
i
'
The review of the above listed procedures provided verification that the following attributes were correctly addressed: Requirements were specified and agreed with commitments, including specified or referenced acceptance level Qualifications of NDE personnel were specified and in accordance with the approved ISI progra Methods of recording, evaluating, and dispositioning findings were established.
, Reporting requirements were in compliance with applicable code
{ requirements and the records identified for retention included:
examination results and data sheets l
l - _ - _ - _ _ - _ _ _ _ - - - _ _ _ - _ - - _ - - _ _ _ _ _ - _ _ _ _ _ _ - - - - _ . - - _ - - - - - - - - - - - - _ - - _ - - - - - - -
r
. .
.
film and tape records, as applicable examination equipment data records of consumable materials such as penetrant materials and-ultrasonic test couplants calibration data sheets Methods of examination, extent, and technique were adequately described and in conformance with the requirements and guidance of ASME Code,Section V, " Nondestructive Examination."
The NRC inspectors reviewed the available certification records for all NDE test personnel involved in the three ISIS. All Ebasco personnel performing examinations were certified in accordance with Ebasco Procedure No. NDE-1, " Qualification and Certification of Nondestructive Examination l Personnel." This procedure meets the requirements of American Society for Nondestructive Testing (ASNT) Recommended Practice No. SNT-TC-1A,
" Personnel Qualification and Certification in Nondestructive Testing."
This ASNT document requires written testimony of qualification.
l The documentation was available (statements, etc..) of verification of
'
previous employment and education, however, it wasn't onsite. This is considered an unresolved item (285/8723-01) until the licensee can locate the requested documentation and make it available to the inspector for review.
l The NRC inspectors reviewed records of all examinations performed during the three ISIS. Components which were examined included the reactor pressure vessel, pressurizer, regenerative heat exchanger, main reactor coolant piping, safety injection, containment spray, feedwater, and shutdown cooling system Elements of these systems which were examined included longitudinal welds, circumferential welds, nozzle welds, safe-end welds and bolts. Included in the review of the ISI data were calibration records for UT and examination records for all NDE methods. The examination records included the following information:
type of NDE performed materials utilized in performance of examination calibration parameters for UT examinations area of component examined i date examination performed personnel performing examination results of examination All examinations which revealed relevant indications or conditions were identified and documented on the affected examination record. Relevant indications exceeding the allowable limits specified in the NDE procedures were evaluated in accordance with the provisions set forth in ASME Section XI, Subsection IWA-3000.
l t
_ _ _ _ _ _ _ - - - - - -
.. .
The review of the ISI data provided verification that the data covered the scope of examination required by the approved ISI progra No violations or deviations were identified during this inspectio . Exit Interview The NRC inspectors met with licensee representatives denoted in paragraph I at the conclusion of the inspection and discussed the results of the inspection.
\
i I
%^j rp*. .. ',
I;/ , .,,
r . -U
, ,
- . . .
.
_ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _
..
'
!
!
!
!
<
l
)
i i
i
.
I
Y
- 'g f g \~ 05 SO 4aHED
,