IR 05000285/1987007
| ML20215H233 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/09/1987 |
| From: | Baer R, Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20215H224 | List: |
| References | |
| 50-285-87-07, 50-285-87-7, NUDOCS 8704200220 | |
| Download: ML20215H233 (3) | |
Text
1
.
. -
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-285/87-07 License: DPR-40 Docket:
50-285 Licensee: Omaha Public Power District (0 PPD)
1623 Harney Street Omaha, Nebraska 68102 Facility Name:
Fort Calhoun Station (FCS)
Inspection At:
FCS Site, Blair, Nebraska Inspection Conducted: March 23-27, 1987
[/8/8[
Inspector:
R.'E. Baer, Radiation Specialist, Facilities Date Radiological Protection Section Approved:
(Nfu b lf[t[au hQ/$7 B.Murray, Chief,Facil/tiesRadiological Date Protection Section Inspection Sungnary Inspection Conducted March 23-27, 1987 (Report 50-285/87-07)
Areas inspected:
Routine, unannounced inspection of occupational exposures during the 1987 refueling outage.
Results: Within the area inspected, no violations or deviations were identified.
8704200220 870415 PDR ADOCK 05000285 G
-.
..
.. -
.
. so
.
Details t
1.
Persons Contacted
,
- W. G. Gates, FCS Plant Manager-A. Bilau, Radwaste Coordinator
- C. J. Brunnert, Supervisor, Operations Quality Assurance (QA)
R._ A. Cords, Chemistry / Radiation Protection (C/RP) Senior Technician
'
C. R. Crawford, ALARA Coordinator
- J. P. Gasper, Manager, Administrative and Training Services
.
- M. Hendrickson, Manager, Generating Station Engineering D. A. Jacobson, Training Instructor
- R. L. Jaworski, Section Manager, Technical Services
- J. M. Mattice, Plant Health Physicist
- T. J. McIvor, Supervisor, Technical
- K. J. Morris, Division Manager, QA and Regulatory Affairs
- D.- J. Munderloh, Senior Engineer, Nuclear Regulatory and i
_ Industry Affairs
- A. W. Richards,-Manager, QA
- G. L. Roach, Supervisor, C/RP M. E. Schutt, Instructor, Pressure Equipment
,
- F. K. Smith, Plant Chemist
Others
R. Gries, Acting Alternate ALARA Coordinator, IRM M. D. Struhar,-Training Instructor, NUS
- P. H. Harrell, Senior Resident Inspector, USNRC
- L. D. Gilbert, Regional Inspector, USNRC
'
- K. H. Oh, Observer, Korea Advanced Energy Research Institute
,
The NRC inspector also interviewed other licensee and contractor employees,
!
including C/RP, administrative, and training personnel.
!
- Denotes those individuals present during the exit. interview on March 27, 1987, 2.
The NRC inspector discussed the following observations with the licensee during the exit interview. These observations are neither violations nor unresolved items. They were identified for licensee consideration for program improvement, but they have no specific regulatory requirement.
'
The licensee indicated that these items would be considered.
Personnel / Clothing Contamination Reports - The reports do not include sufficient detail to determine root cause of incident, the extent of initial contamination on clothing, and the chronological detail of events.
,
,
_
-.
-
. _,,
_ _ _..
-,
...,
.
- - _ -, - _ - _
_ - _.
_ _ _ _-___ - _-_- - _.
.
.
i ALARA Waiting Area Signs - The purpose of the ALARA waiting area I
signs is not discussed during general employee radiation protection training.
3.
Program Areas Inspected The following program areas were inspected. Unless otherwise noted, the inspection was completed and no violations, deviations, unresolved items, or open items were identified. Notations after a specific inspection item
,
I are used to identify the following:
I = item not inspected or only partially inspected; Y = violation; D = deviation; U = unresolved item, and 0 = open item.
Inspection Procedure Inspection Requirements 83729 Occupational Exposure During Extended Outages 02.01 - Audits and Appraisals 02.02 - Changes 02.03 - Planning and Preparation 02.04 - Training and Qualification of New Personnel 02.05 - External Exposure Control 02.06'- Internal Exposure Control I
02.07 - Control of Radioactive l
Materials and
}
Contamination, Surveys, and Monitoring
.
02.08 - Maintaining Occupational Exposure ALARA
!
4.
Exit Interview The NRC inspector met with personnel denoted in paragraph 1 on March 27, 1987, and summarized the scope and findings of the inspection.
!