Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/87-32, Specifically Compensatory Measures
ML20148J278
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/18/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8803300222
Download: ML20148J278 (2)


Text

i

.

MAR I 81988

'

Docamont Contains In Reply Refer To:

Docket:

50-285/87-32 Omaha Public Power District ATTN:

R. L. Andrews, Division Manager Nuclear Production 1623 Harney Dmaha, Nebraska 68102 Gentlemen:

Thank you for your letter of February 26, 1988, in response to our letter and Notice of Violation dated January 15, 1988. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation and the area of concern about compensatory measures. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, Original Signed By A.B. Beach L. J. Callan, Director Division of Reactor Projects cc:

Fort Calhoun Station ATTN:

W. G. Gates, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washingten, D. C.

20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director RI M SS:RPSB C:P < PSB C:RPSB C:DRP/B I D:

JAFKelly cd RJEv_ e t LAYanddfI TFWesterman LJ 1an

{/88

) /jd/88

$(y/88 3/I7/88 3 /q /88 ENCLOSURE CONTAINS Document Contains. 8803300222 880310 UPON SEPARATION THIS ADOCK 0500

PAGE IS DECONTROLLED.

$DR fh l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

o

<

.

Omaha Public Power District-2-bec w/ copy of licensee's response w/ safeguards:

RIV Security File P. A. Starcher, RSGB/NRR Resident Inspector R. D. Martin, RA R. L. Bangart, DRSS Security Inspector Chief, RPSB RPSB Security File bgc w/ copy of licensee's response w/o safeguards:

A kB IE-04 DRP Lisa Shea, RM/ALF Section Chief, DRP/B RIV File MIS RSTS Operator RPSB DRS M. Emerson R. E. Hall, DRSS Project Engineer, DRP/B T. Bournia, NRR Project Inspector ENCLOSURE CONTAINS.

UPON SEPARATION THIS PAGE IS DECONTROLLED,

..

..,

...... -.,.. <, _

. <.

,

,,,.

._

$N$0h hf0R&yyy

!

.

= *=m m n bre w E374 LTfE M f Q gg y %T& g g y Omaha Public Power District 2@30W2 >

1623 Harney Omaha, Nebraska 68102 402/536 4000 FEB 2 9 :. 3

'

February 26, 1988 LIC-88-099

,.

ENCLO$URE(S) CONTAIN(S).

DECONTROL 11D WHEN U. S. Nuclear Regulatory Commission SEPARATED FROM ATTACHMU4T(S)

ATTN: Document Control Desk Washington, DC 20555 Reference:

1. Docket No. 50-285 2. Letter from the NRC (L. J. Callan) to OPPD (R. L. Andrews)

dated January 15, 1988 Gentlemen:

SUBJECT: Response to inspection 50-285/87-32 Please find attached Omaha Public Power District's response to Reference 2.

Attachment A contains the response to violations A and B, and Attachment B contains a response to open item 8732-03 concerning Compensatory Measures as requested by Reference 2.

Per a telephone conversation between Jerry EvertTof Region IV and J. J.

Fisicaro of my staff on February 16, 1988, a 10-day extension was granted for submittal of OPPD's response to the subject inspection.

This document contains safeguards information and is not for public disclosure.

Its distribution should be restricted on a "need to know" basis.

Sincerely,

& Mr_'

R. L. Andrews Division Manager Nuclear Production l

l RLA/me

'

ccfiI.ID7 Martin, NRC Regional Administrator P. H. Harrell, NRC Senior Resident Inspector A. Bournia, NRC Project Manager w/o Enclosure LeBoeuf, Lamb, Leiby & MacRae w/o Enclosure SAFEGMRDS WORNDON gsQ Av3<Am;=p-asm