IR 05000285/1987035

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-285/87-35 on 870901-30 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Program
ML20196H889
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/03/1988
From: Harrell P, Hunter D, Reis T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20196H886 List:
References
50-285-87-35, EA-88-056, EA-88-56, NUDOCS 8803140093
Download: ML20196H889 (1)


Text

. -

-

+ .3

. g ,

[

. _ .

,

~

,

n  !

'

APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION' f REGION IV i NRC Inspection Report: 50-285/87-35 Operating License: OPR-40 Docket: 50-285 EA: 88-56 l

Licensee: Omaha Public Power District (0 PPD)  ;

1623 Harney Street +

Omaha, Nebraska 68102 -

Facility Name: Fort Calhoun Station (FCS)

Inspection At: Fort Calhoun Station, Blair, Nebraska Inspection Conducted: September 1-30, 1987 ,

.

s

,

Inspector: -

J /

P. H. Harrell, 5enior Resiaent Reactor Date Inspector ,

i

.

-

T. Reis, Resident Reactor Inspector

'

]

Date l f l

!

'

l Approved:

D. R. Hunter, Chief, Technical Support Staf f k

Date M r l

'

Division of Reactor Projects

.

.

.

Inspection Summary ,

i-

[

Inspection Conducted September 1-30, 1987 (Report 50-285/87-35)  :

f i Areas Inspected: Routine, unannounced inspection of the security progra !

!

Results: Within the area inspected, two violations (failure to maintain the i protected area isolation zone free of all objects, paragraph 2; and failure to I exercise positive control over a. vehicle inside the protected area,  !

paragraph 2) were identifie ;

f I

ENCLO"Uni CNIT AINS St' ~ * ~ ' " "C CRMATIO [

,

UFON u. - %ATION THic  ;

" O O  !

8803140093 880304  !

PDR ADOCK 050002S5 O DCD l