IR 05000285/1987035
| ML20196H889 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/03/1988 |
| From: | Harrell P, Hunter D, Reis T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20196H886 | List: |
| References | |
| 50-285-87-35, EA-88-056, EA-88-56, NUDOCS 8803140093 | |
| Download: ML20196H889 (1) | |
Text
.
-
-
+.3 g
.
,
[
~
,
. _.
,
n
!
'
APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION'
f
REGION IV
i NRC Inspection Report:
50-285/87-35 Operating License:
OPR-40 Docket:
50-285 l
EA:
88-56
Licensee:
Omaha Public Power District (0 PPD)
1623 Harney Street
+
Omaha, Nebraska 68102
-
Facility Name:
Fort Calhoun Station (FCS)
Inspection At:
Fort Calhoun Station, Blair, Nebraska Inspection Conducted:
September 1-30, 1987
,
.
s
,
J
/
Inspector:
-
P. H. Harrell, 5enior Resiaent Reactor Date Inspector
,
i
]
l f
'
-
.
T. Reis, Resident Reactor Inspector Date l
!
'
l k
M Approved:
r D. R. Hunter, Chief, Technical Support Staf f Date l
'
Division of Reactor Projects
.
.
.
Inspection Summary
,
[
i-Inspection Conducted September 1-30, 1987 (Report 50-285/87-35)
f i
Areas Inspected:
Routine, unannounced inspection of the security program.
!
!
Results: Within the area inspected, two violations (failure to maintain the i
protected area isolation zone free of all objects, paragraph 2; and failure to I
exercise positive control over a. vehicle inside the protected area,
!
paragraph 2) were identified.
f I
ENCLO"Uni CNIT AINS
"C CRMATION.
[
St' ~ * ~ ' "
UFON u. - %ATION THic
O O
!
,
"
8803140093 880304
!
PDR ADOCK 050002S5 l
O DCD
-
--
-
-
-