IR 05000285/1989016
| ML20246Q123 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/04/1989 |
| From: | Caldwell R, Everett R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20246Q114 | List: |
| References | |
| 50-285-89-16, NUDOCS 8905220378 | |
| Download: ML20246Q123 (1) | |
Text
__-_-__
_ _ _ _ _ - _ _ _ _ -. - _ - -
. _ _
. _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ -
_ _ _ _ _
_
g;
!
j
!
,
l
., k.
l
.;
APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
l
'
!
NRC Inspection Report: 50-285/89-16 Operating License:.DPR-40 Docket:
50-285 Licensee: Omaha Public Power District
{
1623 Harney Street-
.i Omaha, Nebraska 68102
{
Facility.Name:
Fort Calhoun Station (FCS)
Inspection At:
FCS, Blair, Nebraska Inspection Conducted:. March 27-31, 1989
'
Inspector:
[-J
'
.
L.3 A. Caldwell,. Physical Security Specialist Date Security and Emergency Preparedness Section j
i
!
Approved:
b.
de//fif R. J. Everett, Chief, Security and Emergency Date
Preparedness Section
!
!
Inspection Summary i
'
Inspecticn Conducted March 27-31, 1989 (Report 50-285/89-16)
Areas Inspected:
Routine, unannounced inspection of the licensee's physical
!
security program,- The areas inspected within the physical security program
!
included management support, Safety Enhancement Plan, and audits; vital area i
physical barriers, and detection aids; protected area access control of
!
vehicles; security system power supply; compensatory measures; and. security
)
training and qualifications.
i
~!
Results: Within the areas inspected, no violations or deviations were
!
identified. The NRC inspector noted that progress is being made in all areas l-of the licensee's security upgrade program, except security management
staffing. The licensee has experienced difficulty in filling three key staff l
positions in the security organization.
The licensee's Safety Enhancement Plan
.j appears to be meeting schedule commitments with final aspects of the security l
. upgrade due to be completed by September 30, 1989.
Compensatory measures are j
still in operation on the perimeter to compensate for non-operational security j
systems.
j ENCLOSURE CONTAINS l 8905220378 890510 PDR ADOCK 05000285 UPON SEPARATION THIS
!
l Q
PDC PAGE IS DECONTROLLED
,
_ _ _ _ _ _ _ _ _. _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _. _ _
_. _ _ _. _ _ ___