ML20085H236: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:!
!            = ENTERGY                                                              ET"s        "''" "'""*
Killorg LA 70066 Tel 504 739 6774 R. F. Burski            j on1x.
Naar Sa'etf V&erford 3
!-                                                                                  W3F1-95-0094 A4.05 PR June 14, 1995 U.S. Nuclear Regulatory Commission l
ATTN: Document Control Desk i
Washington, D.C. 20555
 
==Subject:==
Waterford 3 SES Docket No. 50-382
;                                  License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating-statistics for the month of May, 1995.      This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment                                                                                4 cc:              L.'J. Callan (NRC Region IV)
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelo'kc (INP0 Records Center)
                                                                                                    /f NRC Resident Inspectors Office                                    \g\
_7C[(gr,                                                                        /      \
9506210062 950531 PDR    ADOCK 05000302 R                    PDR
 
e-  -.
NRC MONTHLY OPERATING REPORT
 
==SUMMARY==
OF OPERATIONS WATERFORD 3 for May, 1995 The unit operated at an average reactor power level of 99.86% and experienced'no.
shutdowns or significant power reductions during the period.
l I
I l
I l
l Page: I of 6
 
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for May, 1995 i              There were no pressurizer safety valve failures or challenges experienced during the month.
7 I
4 4/695                                                                                      Page: 2 of 4 -
 
    .z      l    ,
OPERATING DATA REPORT.
DOCKET NUMBER :    50 382 UNIT NAME :  WATERFORD 3' DATE OF REPORT :    June.6, 1995.
COMPLETED BY :  D. S. Freeman            i TELEPHONE :  (504) 464 3352          l l
0PERATING STATUS                                                                                      l I
: 1. Reporting Period                        :  May, 1995 Gross Hours in Reporting Period        :      744-
: 2. Currently Authorized Power Level (MWt) :    3,390 Maximum Dependable Capacity (Net MWe) :      1,075
                                                                      ~
Design Electrical Rating    (Net MWe) :    1,104
: 3. Power Level to which Restricted (if any) (Net MWe) :          'N/A                            .)
: 4. Reason for Restriction (if any)        :      N/A THIS          YEAR TO MONTH-          DATE      CUMULATIVE
: 5. Number of Hours Reactor was Critical        744.0          3.623.0      72,345.8
: 6. Reactor Reserve Shutdown Hours                0.0              0.0            0.0
: 7. Hours Generator was On-line                  744.0          3,623.0      71,467.3
: 8. Unit Reserve Shutdown Hours                    0.0              0.0            0.0
: 9. Gross Thermal Energy Generated      (MWH)  2,518,637      12,263,197    236,592,806
: 10. Gross Electrical Energy Generated (MWH)      842,880        4,098,300      78,832,760
: 11. Net Electrical energy Generated (MWH)        808,168        3,931,206      75,173,572
: 12. Reactor Service Factor                        100.0          100.0          85.2
: 13. Reactor Availability Factor                    100.0          100.0          85.2
: 14. Unit Service Factor                            100.0            100.0          84.2
: 15. Unit Availability Factor                      100.0          100.0          84.2
: 16. Unit Capacity Factor (using MDC)              101.0            100.9          82.4-
: 17. Unit Capacity Factor (Using DER)              98.4            98.3          80.2
: 18. Unit Forced Outage Rate                        0.0              0.0            3.0
        ' WW95                                                                                    Pese: 3 of 6 .
 
OPERATING DATA REPORT DOCKET NUMBER . 50-382 UNIT NAME :  WATERFORD 3 DATE OF REPORT :  June 8. 1995 COMPLETED BY :  D. S. Freeman TELEPHONE :  (504) 464 3352 OPERATING STATUS (Cont.)
: 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL  -
September 8, 1995    -
60 Days
: 20. If Shutdown at end of report period, estimated date of startup:      N/A-
: 21. Unit is in Commercial Operation.
THIS        YEAR TO MONTH          DATE      CUMULATIVE
: 22. Hours in Reporting Period                    744        + 3,623          84,888
: 23. Unit Forced Outage Hours                      0.0            0.0          2,210.2
: 24. Nameplate Rating            (Gross MWe) :    1,200 Max. Dependable Capacity (Gross MWe) :      1,120 3
: 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons .
N/A v
W695                                                                                Page : 4 of 6
 
        }; ,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :          50 382 UNIT NAME.:          WATERFORD 3-DATE OF REPORT :          June 6.-1995 COMPLETED BY :          D. S. Freeman TELEPHONE :          (504) 464 3352 Reporting Period :      May, 1995                                                ( NET MWe )
DAY    Avg. Power Level                  DAY      Avg. Power Level i
1          1.089                              16              -l'088 2          1,091                              17              1,090 3          1,090                              18              1,089 4          1,089                              19              1.090
;                                    5          1,089                            20                1,056 6          1,080                            21                1,089-7          1.080                            22                1,089 8          1,080-                            23                1.089 9          1.082                            24                1.089 10        1,082                            25                1,088 11        1.082                            26                1,089 12        1.089                            27                1.088 13        1.089                              28              1.087 14        1,089                              29              1,088 15        1.089                              30              1,089 31                1.089 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
]
        &&95                                                                                                Page: $ of 6
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :    50 382 UNIT NAME :    WATERFORD 3 DATE OF REPORT :    June 6, 1995' COMPLETED BY.:    D. S.. Freeman TELEPHONE :    (504) 464 3352-REPORTING PERIOD :      May, 1995 Date
* Duration      ** Shutdown Cause, Comments and Number  (yymmdd)    Type  (Hours)  Reason    Method    Corrective Actions NONE TYPE                              REASON F - Forced                          A - Equipment Failure (explain)
S - Scheduled                        B - Maintenance or Test C - Refueling D - Regulatory Restriction
                          ***                                    E - Operator Training and METHOD                                        License Examination 1 - Manual                          F - Administrative 2 - Manual Scram                    G - Operational Error (explain) 3 - Automatic Scram                  H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
          &695                                                                              Pass: 6 of 4}}

Revision as of 14:56, 13 May 2020

Monthly Operating Rept for May 1995 for Waterford 3 Ses.W/ 950614 Ltr
ML20085H236
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/31/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0094, W3F1-95-94, NUDOCS 9506210062
Download: ML20085H236 (7)


Text

!

! = ENTERGY ET"s "" "'""*

Killorg LA 70066 Tel 504 739 6774 R. F. Burski j on1x.

Naar Sa'etf V&erford 3

!- W3F1-95-0094 A4.05 PR June 14, 1995 U.S. Nuclear Regulatory Commission l

ATTN: Document Control Desk i

Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382

License No. NPF-38 Monthly Operating Report Gentlemen

Attached is the subject monthly report which covers the operating-statistics for the month of May, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment 4 cc: L.'J. Callan (NRC Region IV)

C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelo'kc (INP0 Records Center)

/f NRC Resident Inspectors Office \g\

_7C[(gr, / \

9506210062 950531 PDR ADOCK 05000302 R PDR

e- -.

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for May, 1995 The unit operated at an average reactor power level of 99.86% and experienced'no.

shutdowns or significant power reductions during the period.

l I

I l

I l

l Page: I of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for May, 1995 i There were no pressurizer safety valve failures or challenges experienced during the month.

7 I

4 4/695 Page: 2 of 4 -

.z l ,

OPERATING DATA REPORT.

DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3' DATE OF REPORT : June.6, 1995.

COMPLETED BY : D. S. Freeman i TELEPHONE : (504) 464 3352 l l

0PERATING STATUS l I

1. Reporting Period  : May, 1995 Gross Hours in Reporting Period  : 744-
2. Currently Authorized Power Level (MWt) : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075

~

Design Electrical Rating (Net MWe) : 1,104

3. Power Level to which Restricted (if any) (Net MWe) : 'N/A .)
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH- DATE CUMULATIVE
5. Number of Hours Reactor was Critical 744.0 3.623.0 72,345.8
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 3,623.0 71,467.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,518,637 12,263,197 236,592,806
10. Gross Electrical Energy Generated (MWH) 842,880 4,098,300 78,832,760
11. Net Electrical energy Generated (MWH) 808,168 3,931,206 75,173,572
12. Reactor Service Factor 100.0 100.0 85.2
13. Reactor Availability Factor 100.0 100.0 85.2
14. Unit Service Factor 100.0 100.0 84.2
15. Unit Availability Factor 100.0 100.0 84.2
16. Unit Capacity Factor (using MDC) 101.0 100.9 82.4-
17. Unit Capacity Factor (Using DER) 98.4 98.3 80.2
18. Unit Forced Outage Rate 0.0 0.0 3.0

' WW95 Pese: 3 of 6 .

OPERATING DATA REPORT DOCKET NUMBER . 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8. 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464 3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

REFUEL -

September 8, 1995 -

60 Days

20. If Shutdown at end of report period, estimated date of startup: N/A-
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 + 3,623 84,888
23. Unit Forced Outage Hours 0.0 0.0 2,210.2
24. Nameplate Rating (Gross MWe) : 1,200 Max. Dependable Capacity (Gross MWe) : 1,120 3
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons .

N/A v

W695 Page : 4 of 6

}; ,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50 382 UNIT NAME.: WATERFORD 3-DATE OF REPORT : June 6.-1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464 3352 Reporting Period : May, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level i

1 1.089 16 -l'088 2 1,091 17 1,090 3 1,090 18 1,089 4 1,089 19 1.090

5 1,089 20 1,056 6 1,080 21 1,089-7 1.080 22 1,089 8 1,080- 23 1.089 9 1.082 24 1.089 10 1,082 25 1,088 11 1.082 26 1,089 12 1.089 27 1.088 13 1.089 28 1.087 14 1,089 29 1,088 15 1.089 30 1,089 31 1.089 INSTRUCTIONS

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

]

&&95 Page: $ of 6

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 6, 1995' COMPLETED BY.: D. S.. Freeman TELEPHONE : (504) 464 3352-REPORTING PERIOD : May, 1995 Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction

      • E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

&695 Pass: 6 of 4