REPORT MOTH . July, 1991 ~tt 96-6999 Method of Shutting Ucensee Cause &Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Code4 Codes Prevent Recurrence Reports 22 901212 S 744 N/A EE ENGINE Unit 3 was shutdown for a scheduled Upgrades Outage 2 | REPORT MOTH . July, 1991 ~tt 96-6999 Method of Shutting Ucensee Cause &Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Code4 Codes Prevent Recurrence Reports 22 901212 S 744 N/A EE ENGINE Unit 3 was shutdown for a scheduled Upgrades Outage 2 | ||
F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) Rle D - Regulatory Restriction 4 - Continued (NUBEG4161) | F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) Rle D - Regulatory Restriction 4 - Continued (NUBEG4161) | ||
E - Operator Training &Ucense Examination 5 - Load Reduction | E - Operator Training &Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Exphln) | ||
F - Administrative 9 - Other(Exphln) | |||
- Operational Error (Explain) Exhibit1-Same Source H - Other (Exphin) | - Operational Error (Explain) Exhibit1-Same Source H - Other (Exphin) | ||
Line 101: | Line 99: | ||
~l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKH NO. 50-.251 UNn NAME Turkey Point in 4 DATE AUgust;-7.";, 19911 COMPLETED BY R. A. Tierney REPORT MpNTH July 1991 TELEPHONE (805) 246-6970 Method of Shutting Licensee Causea Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report At Code 4 Codes Prevent Recurrence 901124 744 0/H N/A RC/EE EUELLXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outages 2 | ~l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKH NO. 50-.251 UNn NAME Turkey Point in 4 DATE AUgust;-7.";, 19911 COMPLETED BY R. A. Tierney REPORT MpNTH July 1991 TELEPHONE (805) 246-6970 Method of Shutting Licensee Causea Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report At Code 4 Codes Prevent Recurrence 901124 744 0/H N/A RC/EE EUELLXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outages 2 | ||
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment FaHure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Everit Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161) | F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment FaHure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Everit Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161) | ||
E - Operator Training & Ucense Examination 5 - Load Reduction F Administrative | E - Operator Training & Ucense Examination 5 - Load Reduction F Administrative 9 - Other(Exphln) | ||
9 - Other(Exphln) | |||
G - Operational Error(Explain) Exhibit1-Same Source H - Other(Exphln) | G - Operational Error(Explain) Exhibit1-Same Source H - Other(Exphln) | ||
Latest revision as of 21:47, 3 February 2020
ML17348B037 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 07/31/1991 |
From: | Plunkett T, Tierney R FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RTR-NUREG-0020, RTR-NUREG-20 L-91-219, NUDOCS 9108160150 | |
Download: ML17348B037 (15) | |
Text
ACCELERATED DI 783BUTION DEMONST 'KTION SYSTEM
~
'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME'ECIPIENT AFFILIATION
SUBJECT:
Monthl g repts for Jul 1991 for Turkey Point Units 3 & .W/910812 r. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/3)LP- &2EB10 1 1 NRR/DOEA/OEAB 1 1 E FILE 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
P.O. Box 029100, Miami, Fl 33102-9100 AU8 12 981 L-91-219 3.'0 CFR 50-36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the July 1991 Operating Status and Summary of Operating. Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i08i60i50 91073i PDR ADOCK 05000250 R PDR ng~>y an FPL Group company
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-250 UNIT Turke Point 3 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Jul 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/0 1/9 1 07/02/91 07/03/91 07/04/9 1 07/05/9 1 07/06/91 07/07/91 07/08/9 1 07/09/9 1 07/10/9 1 07/11/9 1 07/12/9 1 07/13/9 1 07/14/9 1 07/15/9 1 07/16/9 1 07/17/9 1 07/18/91 07/19/91 07/20/9 1 07/2 1/9 1 07/22/9 1 07/23/9 1 07/24/9 1 07/25/9 1 07/2 6/9 1 07/27/91 07/28/9 1 07/29/9 1 07/30/91 07/3 1/9 1
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 8/ 7/91 COMPLETED BY R. A. TIERNEY TELEPHONE 305/246/6970 OPERATING STATUS
- 1. UNI1 NAME: TURKEY POINT UNIT 3
- 2. REPORT ING PERIOD: JULY, 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE 11 HOURS IN REPORT PERIOD: 744 5087 163520.6 12 NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 104473.2 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14 HOURS GENERATOR ON-LINE 0.0 0.0 103055.7 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8 16 GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991 18 NET ELECTRICAL ENERGY GENERATED (MWH) -1267 -7204 64871314 19 UNIT SERVICE FACTOR 0.0 0.0 63.0 20 UNIT AVAILABILITYFACTOR 0.0 0.0 63. 1 21 CAPACITY FACTOR (USING MDC NET)' 0.0 0.0 60.7 22 CAPACI'TY FACTOR (USING DER NET) 0.0 0.0 57.2 23 UNIT FORCED OUTAGE RATE 0.0 0.0 12.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/03/91
41 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 COMPLETED BY
~t.
Turkey Point Unit R. A. Tierney 99 3
REPORT MOTH . July, 1991 ~tt 96-6999 Method of Shutting Ucensee Cause &Corrective Down Event System Component Action to No. Date Type'uration (Hours) Reason~ Reactor Code4 Codes Prevent Recurrence Reports 22 901212 S 744 N/A EE ENGINE Unit 3 was shutdown for a scheduled Upgrades Outage 2
F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) Rle D - Regulatory Restriction 4 - Continued (NUBEG4161)
E - Operator Training &Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Exphln)
- Operational Error (Explain) Exhibit1-Same Source H - Other (Exphin)
Ol
~ '
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Jul 1991 Unit 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO' 50-251 UNIT Turke Point 4 DATE Au ust 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Zul 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/0 1/9 1 07/02/91
-07/03/91 07/04/91 07/05/9 1 07/0 6/9 1 07/07/91 07/08/9 1 07/09/9 1 07/10/9 1 07/11/9 1 07/12/9 1 07/13/91 07/14/9 1 07/15/91 07/16/9 1 07/17/9 1 07/18/9 1 07/19/9 1 07/20/9 1 07/2 1/9 1 07/22/91 07/23/9 1 07/24/91 07/25/91 07/2 6/9 1 07/27/91 07/28/91 07/2 9/9 1 07/30/9 1 07/3 1/9 1
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 8/ 7/91 COMPLETED BY R. A. TIERNEY TELEPHONE 305/246/6970 OPERATING STATUS
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: JULY, 1991
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 5087 157252.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 0.0 0.0 97567.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) -'1398 -6188 62047440
- 19. UNIT SERVICE FACTOR 0.0 0.0 62.0
- 20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.1 2'I. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.4
- 22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.9
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91
~l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKH NO. 50-.251 UNn NAME Turkey Point in 4 DATE AUgust;-7.";, 19911 COMPLETED BY R. A. Tierney REPORT MpNTH July 1991 TELEPHONE (805) 246-6970 Method of Shutting Licensee Causea Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report At Code 4 Codes Prevent Recurrence 901124 744 0/H N/A RC/EE EUELLXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outages 2
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment FaHure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Everit Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F Administrative 9 - Other(Exphln)
G - Operational Error(Explain) Exhibit1-Same Source H - Other(Exphln)
SUMMARY
OF OPERATING EXPERIENCE'OCKET NO'. 50-251 DATE Au st 7 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH. Jul 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.
~~
p i li U