|
|
Line 27: |
Line 27: |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Participants | | : 1. List of Participants |
| : 2. List of Requests for Additional Information cc w/enc!s Ustserv | | : 2. List of Requests for Additional Information cc w/enc!s Ustserv |
|
| |
|
Line 49: |
Line 49: |
| With the relatively limited operating experience and the limited number of data points, the ability to reasonably predict the life of the coolers appears to have a large degree of uncertainty. | | With the relatively limited operating experience and the limited number of data points, the ability to reasonably predict the life of the coolers appears to have a large degree of uncertainty. |
| In addition, as noted in RAI 2.3.3.18-2, previous LRAs for other sites have attributed the fatigue cracking problem in these letdown coolers to be associated with specific operational transients, and, if a similar phenomenon is occurring at Davis-Besse, then a predicted life may need to consider transients in addition to operational time. Request: 1) Provide a summary of Davis-Besse's operating experience associated with the letdown coolers, including occurrences of tube leakage and past replacements for each cooler. Consider including the circumstances how the associated leakage from the reactor coolant system into the component cooling water system was detected, and the approximate magnitude(s) of the leakage. 2) Provide a summary of any past evaluations of the cause(s) for previous tube leakage, including how leakage was determined to be from fatigue cracks due to flow-induced vibration, and the degree and extent of the cracking identified. | | In addition, as noted in RAI 2.3.3.18-2, previous LRAs for other sites have attributed the fatigue cracking problem in these letdown coolers to be associated with specific operational transients, and, if a similar phenomenon is occurring at Davis-Besse, then a predicted life may need to consider transients in addition to operational time. Request: 1) Provide a summary of Davis-Besse's operating experience associated with the letdown coolers, including occurrences of tube leakage and past replacements for each cooler. Consider including the circumstances how the associated leakage from the reactor coolant system into the component cooling water system was detected, and the approximate magnitude(s) of the leakage. 2) Provide a summary of any past evaluations of the cause(s) for previous tube leakage, including how leakage was determined to be from fatigue cracks due to flow-induced vibration, and the degree and extent of the cracking identified. |
| Include information regarding the role any operational transients may have played in causing previous tube leakage or how it was concluded that operational transients need not be considered. | | Include information regarding the role any operational transients may have played in causing previous tube leakage or how it was concluded that operational transients need not be considered. |
| : 3) Provide the information that determined the cooler's intended function is being maintained consistent with CLB, at the point in time immediately prior to replacement. | | : 3) Provide the information that determined the cooler's intended function is being maintained consistent with CLB, at the point in time immediately prior to replacement. |
| Discussion: | | Discussion: |
Line 83: |
Line 83: |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Participants | | : 1. List of Participants |
| : 2. List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION: | | : 2. List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION: |
| See next page ADAMS Accession No .. ML 12031a183 OFFICE LARPB1 :DLR PM:RPB1 :DLR BC:RPB1:DLR NAME Y Edmonds S Cuadrado de Jesus D Morey DATE 02/28/12 02/29/12 03/02/12 OFFICIAL RECORD}} | | See next page ADAMS Accession No .. ML 12031a183 OFFICE LARPB1 :DLR PM:RPB1 :DLR BC:RPB1:DLR NAME Y Edmonds S Cuadrado de Jesus D Morey DATE 02/28/12 02/29/12 03/02/12 OFFICIAL RECORD}} |
Letter Sequence RAI |
---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems., L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits., ML102450565, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems.2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System. Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System. Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection. Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1. Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2. Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems. Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System. Project stage: Other ML1024505652010-08-27027 August 2010 License Renewal Application and Ohio Coastal Management Program Consistency Certification Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic. Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power S Project stage: RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application...2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application... Project stage: Response to RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI ML11126A0362011-04-29029 April 2011 Drawing No. LR-M017D, Revision 1 Piping & Instrument Diagram, Steam Blackout Diesel Generator. Project stage: Other ML11126A0352011-04-29029 April 2011 Drawing No. LR-M017C, Revision 2, Piping & Instrument Diagram, Fuel Oil. Project stage: Other ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start. Project stage: Other ML11126A0332011-04-29029 April 2011 Drawing No. LR-M016B, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0322011-04-29029 April 2011 Drawing No. LR-M016A, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0262011-04-29029 April 2011 Drawing No. LR-M010C, Revision 1, Piping & Instrument Diagram Make-up Water Treatment System Project stage: Other ML11126A0252011-04-29029 April 2011 Drawing No. LR-M010A, Revision 1, Piping & Instrument Diagram Make-Up Water Treatment System Project stage: Other ML11126A0242011-04-29029 April 2011 Drawing No. LR-M009B, Revision 1, Piping & Instrument Diagram Cooling Water System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0452011-04-29029 April 2011 Drawing No. LR-M024H, Revision 1, Piping & Instrument Diagram, No. 2 Main and Auxiliary Turbine Driven Feed Pumps. Project stage: Other 2011-02-25
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks ML12237A0432012-08-24024 August 2012 August 15, 2012 - Summary of Public Meeting to Discuss the Davis-Besse Nuclear Power Station, Unit 1, End-Of-Cycle Plant Performance Assessment ML12165A3502012-07-16016 July 2012 Summary of Conference Call for Stream Generator Tube Inservice Inspections for Spring 2012 Refueling Outage ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12061A2582012-04-0202 April 2012 Summary of Telephone Conference Call Held on July 12,2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML12059A0782012-04-0202 April 2012 Summary of Telephone Conference Call Held on February 9, 2012, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Pow 2024-09-05
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555"()001 March 2, 2012 FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 13, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME4640) The U S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on July 13, 2011, to discuss and clarify the applicant's responses to the staffs requests for additional information (RAls) and new RAls concerning the Davis-Besse license renewal application.
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant.
A brief description on the status of the items is also included.
The applicant had an opportunity to comment on this summary. U I cu(l Manager rojects Branch 1 Division of License Renewal Office of Nucfear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/enc!s Ustserv
SUMMARY
OF TELEPHONE CONFERENCE LICENSE RENEWAL LIST OF July 13, PARTICIPANTS Samuel Cuadrado de Jesus Seung Min James Gavula Todd Mintz Cliff Custer Steve Dort Allen McAllister Larry Hinkle Kathy Nesser Don Kosloff Jim Marley U.S. Nuclear Regulatory Commission (NRC) NRC NRC Center for Nuclear Waste Regulatory Analyses FirstEnergy Nuclear Operating Company (FENOC) FENOC FENOC FENOC FENOC FENOC FENOC ENCLOSURE
SUMMARY
OF TELEPHONE CONFERENCE LICENSE RENEWAL JtJly 13, The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on July 13, 2011, to discuss and clarify the following response to requests for additional information (RAls) and new RAls concerning the Davis-Besse license renewal application (lRA). Response to RAI2.3.3.18-2 After reviewing the applicant's response to RAI 2.3.3.18-2 and previous to the telephone conference call the staff provided the applicant with Draft RAI 2.3.3.18-3 in order to discuss the staff's concerns with the applicant's response.
Draft RAI 2.3.3.18-3 stated the following:
RAI 2.3.3.18-3
Background:
lRA Section 2.3.3.18, "Makeup and Purification System," states that the letdown coolers, designated as DB-E25-1 and -2, are not subject to aging management review (AMR) because these components are periodically replaced and evaluated as short-lived components.
Since these are normally long-lived passive components subject to AMR, the staff issued RAI 2.3.3.18-2 requesting the basis for the replacement frequency and the circumstances surrounding the need to replace these heat exchangers.
In its response dated June 3, 2011, the applicant stated that the cooler replacement frequency is based on a qualified life from plant-specific operating experience, and is scheduled approximately every 14-years.
The applicant also stated that the cooler design "has a tendency to develop leaks" after 14 to 16 years. The applicant further stated that the need to replace the coolers was attributed to fatigue cracking due to flow-induced vibration, and that an extent of condition review determined that the design of these coolers is unique and no other similar heat exchangers are installed at Davis-Besse.
Issue: As previously noted in RAI 2.3.3.18-2, if the frequency is based on qualified life, then information should be provided to demonstrate that the cooler's intended function is being maintained consistent with the current licensing basis (ClB), at the point in time immediately prior to replacement.
The staff notes that in accordance with SRP-lR Section A.1.2.3.4, an aging management approach based solely on detecting component failures is not considered an effective program. The staff also notes that in accordance with updated safety analysis report (USAR) Section 3.9.2, and Table 3.9-2, the letdown coolers are safety-related components constructed to the ASME Code,Section III, Class 3. ENCLOSURE 2
-In addition, the staff notes that, if the design of the cooler results in "a tendency to develop leaks after ... 14 to 16 years," then each heat exchanger would have only been replaced twice, so far, at Davis-Besse.
With the relatively limited operating experience and the limited number of data points, the ability to reasonably predict the life of the coolers appears to have a large degree of uncertainty.
In addition, as noted in RAI 2.3.3.18-2, previous LRAs for other sites have attributed the fatigue cracking problem in these letdown coolers to be associated with specific operational transients, and, if a similar phenomenon is occurring at Davis-Besse, then a predicted life may need to consider transients in addition to operational time. Request: 1) Provide a summary of Davis-Besse's operating experience associated with the letdown coolers, including occurrences of tube leakage and past replacements for each cooler. Consider including the circumstances how the associated leakage from the reactor coolant system into the component cooling water system was detected, and the approximate magnitude(s) of the leakage. 2) Provide a summary of any past evaluations of the cause(s) for previous tube leakage, including how leakage was determined to be from fatigue cracks due to flow-induced vibration, and the degree and extent of the cracking identified.
Include information regarding the role any operational transients may have played in causing previous tube leakage or how it was concluded that operational transients need not be considered.
- 3) Provide the information that determined the cooler's intended function is being maintained consistent with CLB, at the point in time immediately prior to replacement.
Discussion:
The applicant asked for clarification on one issue with the above RAI. Regarding item 1 above, the applicant asked whether the leakage needed to be quantified, since no measurements were taken. The staff stated that the applicant should describe how the leakage was identified and include a bounding estimate of the amount of leakage. It was mutually agreed that a final RAI will be issued on this topic. ACTION: The staff will issue RAI 2.3.3.18-3 New Draft RAI3.1.2.2.16-1 The staff needed clarification as to how the applicant manages cracking due to primary water stress corrosion cracking (PWSCC) of steam generator (SG) tUbe-to-tubesheet welds in comparison with the GALL Report and SRP-LR. In order to discuss the staff's concerns, the staff provided the applicant with Draft RAI 3.1.2.2.16-1 previous to the telephone conference call. Draft RAI 3.1.2.2.16-1 stated the following:
-3
Background:
GALL Report, Revision 2, item IY.D2.RP-185 recommends using GALL Report AMP XI.M2, "Water Chemistry" and a plant-specific program to manage cracking due to PWSCC of SG tube-to-tubesheet welds made of nickel alloy. GALL Report, Revision 2, item IV.D2.RP-185 also recommends that a plant-specific program should be evaluated to confirm the effectiveness of the water chemistry program and to ensure cracking is not occurring.
Consistently, SRP-LR, Revision 2, Section 3.1.2.2.11, item 2 states that cracking due to PWSCC could occur in SG nickel alloy tube-to-tubesheet welds exposed to reactor coolant. The SRP-LR, Revision 2 also states that unless the staff has approved a redefinition of the pressure boundary in which the tube-to-tubesheet weld is no longer included, the effectiveness of the primary water chemistry program should be verified to ensure cracking is not occurring.
By contrast, the applicant's AMR items for the SG components, which are described in LRA Table 3.1.2-4, do not clearly address how the applicant manages the cracking due to PWSCC of SG tube-to-tubesheet welds exposed to reactor coolant. Issue: The staff found a need to clarify how the applicant manages cracking due to PWSCC of SG tube-to-tubesheet welds in comparison with the GALL Report and SRP-LR. Request: If the applicant plans to replace the SGs prior to the period of extended operation, provide the following information. (a) Describe the materials to be used for the fabrication of the new SG tubes, tubesheet cladding and tube-to-tubesheet welds. If any of the tubes, tubesheet cladding, and weld filler metal (if applicable) is Alloy 600 or one of its associated weld metals such that the material is susceptible to PWSCC, discuss how cracking due to PWSCC of the tube-to-tubesheet welds will be managed for the period of extended operation.
If the materials are determined not to be susceptible to PWSCC, confirm whether or not the applicant will continue to evaluate the plant-specific and industry operating experience related to PWSCC of the tube-to-tubesheet welds so that necessary corrective actions will be identified and performed to adequately manage the aging effect of the components. (b) In addition, if the operating experience indicates that the tube-to-tubesheet welds of the SGs have experienced PWSCC and the applicant proposes a one-time inspection to manage the aging effect of the replacement tube-to-tubesheet welds, justify why the one-time inspection is adequate to manage the aging effect of the replacement components in view that the existing components to be replaced have experienced cracking due to PWSCC under the given water chemistry conditions.
-Provide the following information regarding the aging management method that the applicant will use if the steam generators are not replaced prior to the period of extended operation. Describe the aging management method that the applicant will use to manage cracking due to PWSCC of the tube-to-tubesheet welds if the SGs are not replaced prior to the period of extended operation.
As part of the applicant's response, describe the materials of the current SG tubes, tubesheet cladding and tube-to-tubesheet welds, and determine whether or not any of the tubes, tubesheet cladding, and weld filler metals (if applicable) is susceptible to PWSCC. If the materials are determined not to be susceptible to PWSCC, confirm whether or not the applicant will continue to evaluate the plant-specific and industry operating experience related to PWSCC of the tube-to-tubesheet welds so that necessary corrective actions will be identified and performed to adequately manage the aging effect of the components. In addition, if the operating experience indicates that the tube-to-tubesheet welds have experienced PWSCC and the applicant proposes a one-time inspection to manage the aging effect of the. tube-to-tubesheet welds, justify why the one-time inspection is adequate to manage the aging effect of the components that have already experienced cracking due to PWSCC under the given water chemistry conditions.
Discussion:
After the staff summarized the above RAI the applicant responded by suggesting that a supplement to LRA Table 3.1.2-4 will be submitted to add AMR items to address management of cracking due to PWSCC for SG tube-to-tubesheet welds exposed to reactor coolant. This action will align the Davis-Besse LRA with GALL Report Revision 2. The staff stated that it had no Significant concerns with the approach; however, the staff wanted to separate this issue from discussion on proposed new SGs. The staff stated that they would get back to the applicant for any followup teleconferences or RAI guidance related to proposed new SGs.
Memorandum to FirstEnergy Nuclear Operating Company from Samuel Cuardrado de Jesus dated March 2, 2012.
SUBJECT:
Summary of Telephone Conference Call conducted on July 13,2011 DISTRIBUTION:
HARD COPY: DLR RF E-MAIL: PUBLIC [or NON-PUBLIC, if applicable]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney DMclntyre, OPA TRiley,OCA BHarris, OGC LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 13, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on July 13, 2011, to discuss and clarify the applicant's responses to the staff's requests for additional information (RAls) and new RAls concerning the Davis-Besse license renewal application.
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant.
A brief description on the status of the items is also included.
The applicant had an opportunity to comment on this summary. IRAJ Samuel Cuadrado de Jesus, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION:
See next page ADAMS Accession No .. ML 12031a183 OFFICE LARPB1 :DLR PM:RPB1 :DLR BC:RPB1:DLR NAME Y Edmonds S Cuadrado de Jesus D Morey DATE 02/28/12 02/29/12 03/02/12 OFFICIAL RECORD