ML20196A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.-                                JUN 2 3 MB
$ '.
        In Reply Refer To:                                                DOCUMENT CONTAINS
        Docket: '50-298/88-15                                          SAFEGUARDS INFORMATION
        Nebraska Public Power District
        ATTN:  George A. Trevors
                Division Manager - Nuclear Support
        P.O. Box 499
        Columbus, NE 68601
        Gentlemen:
        This refers to the inspection conducted by Mr. J. A. F. Kelly of this office
        during the period April 25-29, 1988, of activities authorized by NRC Operating
        License DRP-46 for the Cooper Nuclear Station, and to the discussion of our
        findings with members of your staff at the conclusion of the inspection.
        The NRC inspector reviewed certain areas.of your physical security program.
        Within these areas, the inspection consisted of selective examination of
                                                                                  ,
        procedures and representative records, interviews with personnel, and
        observations by the NRC inspector. The areas inspected and the inspection
        findings are documented in the enclosed inspection report.
        We have also examined actions you have taken with regc i to a previously
        identified inspection finding.    The status of this iten, is identified in
        paragraph 2 of the enclosed report.
        Within the scope of the inspection, no violations cr deviations were
        identified.
        The material enclosed herewith contains Safeguards Information as defined by
        10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
        by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
        material, with the exception of the report cover page which is an inspection
        summary, will not be placed in the Public Document Room.
        Should you have any questions concerning this inspection, we will be pleesed to
        discuss them with you.
                                                  Sincerely,
                                                  Original Signed fly
                                                      L J. Callan
                                                  L. J. Callan, Director
                                                  Division of Reactor Projects
        Enclos e:      (see next page)                                                          ,gt
        RI    S: WPSB      C:PSSdSB      C:RPSB        'DI: DRSS      C:DRP/C        D:DRP
        JAFKelly;1w        RJEvehtt      BMurray        REHall      EJHoller        I,JCallan
      gt#/88                (p/(p/88    Q//88          f/g/88        6,/pp/88        6/4M88
                                              i                                                  \
              DOCUMENT CONTAINS
                                                            ENCLGSURE CONTAINS
                                                            SAFEGUARDS INFORMATION
                                                                                                \\
            SAFEGUARDS INFORMATION
                                                            UPON SEPARATION THIS                    Ok
                                                                                                  E
    hD                  06 90                              PAGE IS DECONTROLLED              [y
    Q                    DCD
 
                                                  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .                          _
      :
    ..
            ,
  ,      .
        ,
            Nebraska Public Power District                    -2-
            Enclosure:
            Appendix --NRC Inspection Report
              50-298/88-15
            cc w/suminary page only:
            Cooper Nuclear Station
            ATTN: Guy Horn, Division Manager
                      of Nuclear Operations
            P.O. Box 98
p;          Brownville, Nebraska 68321
            Kansas Radiation Control Program Director
            Nebraska Radiation Control Program Director
            bec:  Copy of entire report:
                  RIV Security File
                  P. A Starcher, RSGB/NRR
                  Resident Inspector
                  R. D. Martin, RA
                  R. L. Bangart, DRSS
                  Security Inspector
                  Cnief, RPB
                  SEPS:RPB File
                  G. F. Sanborn
            bec:  RIV - Letter and Inspection Suamary only w/766:
            DRP                              Lisa Shea, RM/ALF
            Section Chief, DRP/C            RIV File
            MIS                              RSTS Operator
            R. E. Hall, DRSS                ProjectEngineer,DRP/C
            bcc: RIV - Letter and Inspection Summary only w/out 766:
          A MB ZE-04
            DRS
            W. Long, NRR Project Manager
!
                                            ENCLOSURE CONTAINS
                                            SAFEGUARDS INFORMATION
                                            UPON SEPARATION THIS
                                            PAGE IS DEC0'irrr' LED
                                                                                                                                                                                  ENCLDSultE CONTAINS
                                                                                                                                                                                  SAFEGUAllDS INRlltilATION
                                                                                                                                                                                  UPON SEPAltA110N THIS
                                                                                                                                                                                  PAGE IS DECONTROLLED
}}
}}

Latest revision as of 12:15, 13 November 2020

Forwards Insp Rept 50-298/88-15 on 880425-29.No Violations or Deviations Noted
ML20196A134
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20196A137 List:
References
NUDOCS 8806290459
Download: ML20196A134 (2)


See also: IR 05000298/1988015

Text

.- JUN 2 3 MB

$ '.

In Reply Refer To: DOCUMENT CONTAINS

Docket: '50-298/88-15 SAFEGUARDS INFORMATION

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Mr. J. A. F. Kelly of this office

during the period April 25-29, 1988, of activities authorized by NRC Operating

License DRP-46 for the Cooper Nuclear Station, and to the discussion of our

findings with members of your staff at the conclusion of the inspection.

The NRC inspector reviewed certain areas.of your physical security program.

Within these areas, the inspection consisted of selective examination of

,

procedures and representative records, interviews with personnel, and

observations by the NRC inspector. The areas inspected and the inspection

findings are documented in the enclosed inspection report.

We have also examined actions you have taken with regc i to a previously

identified inspection finding. The status of this iten, is identified in

paragraph 2 of the enclosed report.

Within the scope of the inspection, no violations cr deviations were

identified.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleesed to

discuss them with you.

Sincerely,

Original Signed fly

L J. Callan

L. J. Callan, Director

Division of Reactor Projects

Enclos e: (see next page) ,gt

RI S: WPSB C:PSSdSB C:RPSB 'DI: DRSS C:DRP/C D:DRP

JAFKelly;1w RJEvehtt BMurray REHall EJHoller I,JCallan

gt#/88 (p/(p/88 Q//88 f/g/88 6,/pp/88 6/4M88

i \

DOCUMENT CONTAINS

ENCLGSURE CONTAINS

SAFEGUARDS INFORMATION

\\

SAFEGUARDS INFORMATION

UPON SEPARATION THIS Ok

E

hD 06 90 PAGE IS DECONTROLLED [y

Q DCD

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _

..

,

, .

,

Nebraska Public Power District -2-

Enclosure:

Appendix --NRC Inspection Report

50-298/88-15

cc w/suminary page only:

Cooper Nuclear Station

ATTN: Guy Horn, Division Manager

of Nuclear Operations

P.O. Box 98

p; Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec: Copy of entire report:

RIV Security File

P. A Starcher, RSGB/NRR

Resident Inspector

R. D. Martin, RA

R. L. Bangart, DRSS

Security Inspector

Cnief, RPB

SEPS:RPB File

G. F. Sanborn

bec: RIV - Letter and Inspection Suamary only w/766:

DRP Lisa Shea, RM/ALF

Section Chief, DRP/C RIV File

MIS RSTS Operator

R. E. Hall, DRSS ProjectEngineer,DRP/C

bcc: RIV - Letter and Inspection Summary only w/out 766:

A MB ZE-04

DRS

W. Long, NRR Project Manager

!

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DEC0'irrr' LED

ENCLDSultE CONTAINS

SAFEGUAllDS INRlltilATION

UPON SEPAltA110N THIS

PAGE IS DECONTROLLED