Text
$ '.
JUN 2 3 MB
.-
In Reply Refer To:
DOCUMENT CONTAINS
Docket: '50-298/88-15
SAFEGUARDS INFORMATION
Nebraska Public Power District
ATTN:
George A. Trevors
Division Manager - Nuclear Support
P.O. Box 499
Columbus, NE 68601
Gentlemen:
This refers to the inspection conducted by Mr. J. A. F. Kelly of this office
during the period April 25-29, 1988, of activities authorized by NRC Operating
License DRP-46 for the Cooper Nuclear Station, and to the discussion of our
findings with members of your staff at the conclusion of the inspection.
The NRC inspector reviewed certain areas.of your physical security program.
Within these areas, the inspection consisted of selective examination of
,
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The areas inspected and the inspection
findings are documented in the enclosed inspection report.
We have also examined actions you have taken with regc i to a previously
identified inspection finding.
The status of this iten, is identified in
paragraph 2 of the enclosed report.
Within the scope of the inspection, no violations cr deviations were
identified.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleesed to
discuss them with you.
Sincerely,
Original Signed fly
L J. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclos e:
(see next page)
,gt
RI
S: WPSB
C:PSSdSB
C:RPSB
'DI: DRSS
C:DRP/C
D:DRP
JAFKelly;1w
RJEvehtt
BMurray
REHall
EJHoller
I,JCallan
gt#/88
(p/(p/88
Q//88
f/g/88
6,/pp/88
6/4M88
i
\\
ENCLGSURE CONTAINS
\\ \\
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
Ok
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
E
hD
06 90
PAGE IS DECONTROLLED
[y
Q
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
_
..
,
.
,
,
Nebraska Public Power District
-2-
Enclosure:
Appendix --NRC Inspection Report
50-298/88-15
cc w/suminary page only:
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P.O. Box 98
p;
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec:
Copy of entire report:
RIV Security File
P. A Starcher, RSGB/NRR
Resident Inspector
R. D. Martin, RA
R. L. Bangart, DRSS
Security Inspector
Cnief, RPB
SEPS:RPB File
G. F. Sanborn
bec:
RIV - Letter and Inspection Suamary only w/766:
Lisa Shea, RM/ALF
Section Chief, DRP/C
RIV File
MIS
RSTS Operator
R. E. Hall, DRSS
ProjectEngineer,DRP/C
bcc:
RIV - Letter and Inspection Summary only w/out 766:
A MB ZE-04
W. Long, NRR Project Manager
!
ENCLOSURE CONTAINS