{{#Wiki_filter:
{{#Wiki_filter:iV  .
                                              JAN 2 91986
        In Reply Refer To:
        Docket:    50-298/85-33
        Nebraska Public Power District
        ATTN:    J. M. Pflant, Manager, Technical
                    Staff-Nuclear Power Group
        P. O. Box 499
        Columbus, Nebraska        68601
        Gentlemen:
        This refers to the inspection conducted by Mr. D. DuBois of this office during
        the period December 1-31, 1985, of activities authorized by NRC Operating
        License DPR-46 for Cooper Nuclear Station, and to the discussion of our
        findings with Mr. Paul Thomason and other members of your staff at the
        conclusion of the inspection.
        Areas examined during the inspection included notification of an unusual event,
        operational safety verification, and monthly surveillance and maintenance
        observations. Within these areas, the inspection consisted of selective
        examination of procedures and representative records, interviews with
        personnel, and observations by the inspector. These findings are documented in
        the enclosed report.
        Within the scope of the inspection, no violations or deviations were
        identified.
        An enforcement conference was held with the licensee during this period.  The
        conference is discussed in paragraph 2 of the enclosed report.
  .
        Should you have any questions concerning this inspection, we will be pleased to
        discuss them with you.
                                                                                            .
                                                    Sincerely,
,
              Dod$hhoh$9g                                1    a ard
                          PDR                      J. E. Gagliardo, Chief
'
                                                    Reactor Projects Branch
        Enclosure:
        Appendix - NRC Inspection Report
          -50-298/85-33
        cc  <  !nclosure: (Se i t page)
            A                    G
l    0    I iR'I          RP  f        RPB    b/
        DLDo_8oj's/sn      P  adon            lIrdo
    g ( 6V86                  /$86      JEGagf8
                                          //M
                                                                                      \ .y
i
 
a %
    ,
    Nebraska Public Power District          -2-
    Guy R. Horn, Division Manager
      of Nuclear Operations
    Cooper Nuclear Station
    P. O. Box 98
    Brownville, Nebraska 68321
    Kansas Radiation Control Program Director
    Nebraska Radiation Control Program Director
    bec to DMB (IE01)
    bcc distrib. by RIV:
                                      DRSP
    *RPB                              R. D. Martin, RA
    * Resident Inspector            *D. Weiss, LFMB (AR-2015)
    *Section Chief (RPB/A)            *RSB
    *EP&RPB                            P. V. Thomason (NPPD)
    MIS System
    *RIV File
    *RSTS Operator
    *w/766
}}
}}

Latest revision as of 05:12, 22 July 2020

Forwards Insp Rept 50-298/85-33 on 851201-31.No Violations or Deviations Noted.Enforcement Conference Held to Discuss Violations
ML20140D661
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/29/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20140D666 List:
References
NUDOCS 8602030091
Download: ML20140D661 (2)


See also: IR 05000298/1985033

Text

iV .

JAN 2 91986

In Reply Refer To:

Docket: 50-298/85-33

Nebraska Public Power District

ATTN: J. M. Pflant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Mr. D. DuBois of this office during

the period December 1-31, 1985, of activities authorized by NRC Operating

License DPR-46 for Cooper Nuclear Station, and to the discussion of our

findings with Mr. Paul Thomason and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included notification of an unusual event,

operational safety verification, and monthly surveillance and maintenance

observations. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspector. These findings are documented in

the enclosed report.

Within the scope of the inspection, no violations or deviations were

identified.

An enforcement conference was held with the licensee during this period. The

conference is discussed in paragraph 2 of the enclosed report.

.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

.

Sincerely,

,

Dod$hhoh$9g 1 a ard

PDR J. E. Gagliardo, Chief

'

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

-50-298/85-33

cc < !nclosure: (Se i t page)

A G

l 0 I iR'I RP f RPB b/

DLDo_8oj's/sn P adon lIrdo

g ( 6V86 /$86 JEGagf8

//M

\ .y

i

a %

,

Nebraska Public Power District -2-

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

DRSP

  • RPB R. D. Martin, RA
  • Resident Inspector *D. Weiss, LFMB (AR-2015)
  • Section Chief (RPB/A) *RSB
  • EP&RPB P. V. Thomason (NPPD)

MIS System