{{#Wiki_filter:}} | {{#Wiki_filter:to Ol'EltAlING DATA Ill.PoltT DOCKl.T NO. 5 0 '' h 6 DAll 8/3/79 COM11Eil D !!y C, conne11 TELLPilONE (914 ) 7i"-0200 OPI:lt ATING STAT US Notes | ||
: 1. Unit Name: 3" H m Po i n+- | |||
Mo. 3 Mucim Power Plant | |||
: 2. !!cporting I'eriod: Julv 1979 | |||
: 3. Licensed 1 hennal Power (MWt): _ 3025 | |||
: 4. Nameplate Itatin;;(Gross MWe): _ 1013 | |||
"- | |||
: 5. Design ElectricalItatin;; tNet MWel: | |||
: 6. Maximum Dependable Capaci.y (Gross MWe): - ICOO | |||
"< 5 | |||
: 7. blasimum Dependable Capacity (Net MWeJ: | |||
: 8. If Changs Occur in Capacity Ratin;;s (Items Number 3 Throu;;h 7) Since Last Iteport. Gise Reasons: | |||
None | |||
: 9. Power Lese! To Which Restricted. lf Any (Net MWel: | |||
: 10. I!casons for !!estrictions. If Any: N/A | |||
'lhis Month Yr..t o.Da t e Cumulatise 744 5087 25,584 | |||
. . | |||
: 11. !!ours In Rcrortm3 Period 4907.1 20,568 744 | |||
: 12. Number Of Hours Reactor Was Critical . | |||
0 0 0 | |||
: 13. Itcactor Pesene Shutdown llours 4878.5 20,086.2 744 | |||
: 14. I!aurs Generatcr On-Line 0 0 0 | |||
: 15. Unit !!cscne Shutdown flours 53,921,647 1,601,186 13,520,678 | |||
: 16. Grow The mal l nergy Gen; : d (MWil) 17,736,181 477,460 4,353,410 | |||
: 17. Gross Electric.il Energy Generaicd (MWill 454,669 4,196,640 17,045,450 | |||
: 18. Net Electrical Energy Generated (MWil) lon 95.9 78.5 | |||
: 19. Unit Senice I actor 78.5 100 95.9 | |||
: 20. Unit As.n!.ibility F.ictor 63.T 85.5 69.0 | |||
: 21. Unit Cap.icity Factor (Using MDC Net) 61.3 85.5 69.0 | |||
: 22. Unit Capiuty Factor (Using DER Net) 3.9 0 .6 | |||
: 23. Unit I orecil Outage R.cre | |||
: 24. Shutdowns S-hednicd Oscr Nest 6 Monti:s (Type. Date.and Duration of f.ich t: | |||
Refuelinu Outage Sep teric 1979 2.>. If Shul Dow n At Fud Of !!cport Period !Niiinatcil Date of Startup: | |||
: 26. Umts In l est St.itus (l'aior to Cunnnercr il Operationi: 1:urceast Achicscil | |||
, | |||
INill Al. Cilll! cal tl Y % __ | |||
% | |||
INill \l. I'I.I'Clllit t rY , | |||
COMMI !!CI A l. Ol'1 !! A 1 ION , | |||
. | |||
3 I ,' | |||
79081405m 63 eml | |||
AVI.IC AGE I) AILY UNil POWI 1( !.l VLL DOCKET NO. Ch2"6 liio i an Po i n t. | |||
UNIT No 3 DATE | |||
!! | |||
COMPLETED g;y C . Connell TELEPIl0NE 914-739-3200 MONT!! July 1979 DAY AVERAGE D A!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe NetJ (MWe Net) y 618 37 610 615 614 2 18 . | |||
3 617 39 612 615 20 603 4 | |||
5 615 21 6"4 616 593 615 589 7 3 g 614 2.g 594 613 586 9 25 612 26 597 10 | |||
!! C ' '' | |||
27 All 610 636 g | |||
33 608 29 635 g 593 638 30 15 604 31 631 16 - | |||
Fo' | |||
. | |||
INS 1 RUCTIONS On this fornut. hst the nerage daily unit power levelin MWe. Net for each day in the repostnig anonth.Coinpute to the riestest w hole niegawatt. - | |||
- | |||
(9/77) | |||
,. n j n\ OL | |||
' | |||
, | |||
t .i | |||
)\ | |||
- - - - | |||
_ _ | |||
50-286 UNITS!!UTDOWNS AND POWER REDUCTIONS DOC}:ET NO. . | |||
UNil N etE Indian Point ,,o . 3 | |||
.. | |||
DATE 9 'l COMPLETED DY o - r-nM1 REPORT MONTl! July 1979 TELEril0NE 914 73o a2''O | |||
- | |||
. | |||
- E E No. Date | |||
, | |||
g | |||
.5 ? 3 4 Yl Licensee ,Eg, {% Cause & Corrective 3g g ,g g 5 Esent gg o-3 Action to | |||
* | |||
$E cf Igg | |||
< g Report # to O [U O | |||
Present Recurrentt C | |||
29 790729 P .7 A 1 N/A IIII VALVEX F Load reduction caused by decreasing condenser vacuum due to low level in boiler feed pump seal collecting tack. | |||
Corrective Action: | |||
Serviced level control valve | |||
. | |||
T'* g | |||
% l | |||
-eg i | |||
s1 1 2 3 | |||
- F: Forced 4 Ressen: Method: | |||
ya S: Schedu!ed A Equ:pment Faiture(Explain) Exhibit F Instructions 1 Manual for Preparation of Data B-Maintenance ci Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram D-Regulatory Restriction Esent Report ILER) File (NUREG-4-Ot her (E xplain ) 0161) 1 -Operator Training 1 License Examination F AJnanistr:tbe 5 G-Operational Error (Explain) | |||
(9/77) Il 04her (Explain) Exhibi.B Same Sourec | |||
'MO!;THLY MAINTE!!A!!CE REPCRT | |||
, | |||
July 1979 Month DATE W.R. 4 EQUIPME!;T MALFUNCTION CORRECTIVE ACTIO!J 7-5-79 I-569-1B Charging Pump Press. Gauge Weld leak Removed pipe to tubing adapter, stop Valve #229 welded in new one. | |||
7-13-79 I-576-2 #31 Charging Pump Seals leak Replaced seals in all 5 cylinders 7-15-79 I-578-1A #32 Boric Acid Transfer Mechanical seal leaks Replaced nochanical seal | |||
. | |||
'N | |||
, 2 "W. | |||
. | |||
.% | |||
MO:THLY I & C CATEGORY I REPORT | |||
. | |||
July 1979 Month Date I W.R. # Equ ipr.c nt | |||
* Malfunction Corrective Action 7/23/79 IC-1-432-2 R-ll Containment APD Filter paper does not advanca Corrected misalignment between gear housing and paper drive motor. | |||
. | |||
T =g | |||
. | |||
>% | |||
Qjd | |||
.a a | |||
* | |||
. | |||
. | |||
SU.UARY OF CP3RATII;G EXPERIEt;CE July, 1979 Indian Point Unit 3 vas synchronized to the bus for a total of 744 hours, producing a gross gencration of 477,46] mwh for this re-porting period. | |||
The unit operated at 70% power for the major part of the month and experienced one scheduled power ascension and one load reduction. | |||
Until July 27, 1979, the urit was operating at 70% power in order to extend the operating cycle. At 14:32 that date, the unit load was increased to 75% power in order to meet with sche duling for a September 15, 1979 Refueling Outage start date. The unit rema; ed at 75% power for the rest of the month. | |||
The load reduction occurred on July 29, 1979 at approximately 19:30. | |||
At that time, the unit experienced a condenser vacuum transient due tc a failure in level control of Boiler Fced Pump seal collecting tank. Gen-erator output was reduced to 460 mw for approximately one hour. | |||
- ,- , j / | |||
- | |||
t j i 0 | |||
..}} |
Revision as of 00:53, 27 October 2019
ML19242D115 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 08/03/1979 |
From: | Connell C POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML19242D109 | List: |
References | |
NUDOCS 7908140516 | |
Download: ML19242D115 (6) | |
Text
to Ol'EltAlING DATA Ill.PoltT DOCKl.T NO. 5 0 h 6 DAll 8/3/79 COM11Eil D !!y C, conne11 TELLPilONE (914 ) 7i"-0200 OPI:lt ATING STAT US Notes
- 1. Unit Name: 3" H m Po i n+-
Mo. 3 Mucim Power Plant
- 2. !!cporting I'eriod: Julv 1979
- 3. Licensed 1 hennal Power (MWt): _ 3025
- 4. Nameplate Itatin;;(Gross MWe): _ 1013
"-
- 5. Design ElectricalItatin;; tNet MWel:
- 6. Maximum Dependable Capaci.y (Gross MWe): - ICOO
"< 5
- 7. blasimum Dependable Capacity (Net MWeJ:
- 8. If Changs Occur in Capacity Ratin;;s (Items Number 3 Throu;;h 7) Since Last Iteport. Gise Reasons:
None
- 9. Power Lese! To Which Restricted. lf Any (Net MWel:
- 10. I!casons for !!estrictions. If Any: N/A
'lhis Month Yr..t o.Da t e Cumulatise 744 5087 25,584
. .
- 11. !!ours In Rcrortm3 Period 4907.1 20,568 744
- 12. Number Of Hours Reactor Was Critical .
0 0 0
- 13. Itcactor Pesene Shutdown llours 4878.5 20,086.2 744
- 14. I!aurs Generatcr On-Line 0 0 0
- 15. Unit !!cscne Shutdown flours 53,921,647 1,601,186 13,520,678
- 16. Grow The mal l nergy Gen; : d (MWil) 17,736,181 477,460 4,353,410
- 17. Gross Electric.il Energy Generaicd (MWill 454,669 4,196,640 17,045,450
- 18. Net Electrical Energy Generated (MWil) lon 95.9 78.5
- 19. Unit Senice I actor 78.5 100 95.9
- 20. Unit As.n!.ibility F.ictor 63.T 85.5 69.0
- 21. Unit Cap.icity Factor (Using MDC Net) 61.3 85.5 69.0
- 22. Unit Capiuty Factor (Using DER Net) 3.9 0 .6
- 23. Unit I orecil Outage R.cre
- 24. Shutdowns S-hednicd Oscr Nest 6 Monti:s (Type. Date.and Duration of f.ich t:
Refuelinu Outage Sep teric 1979 2.>. If Shul Dow n At Fud Of !!cport Period !Niiinatcil Date of Startup:
- 26. Umts In l est St.itus (l'aior to Cunnnercr il Operationi: 1:urceast Achicscil
,
INill Al. Cilll! cal tl Y % __
%
INill \l. I'I.I'Clllit t rY ,
COMMI !!CI A l. Ol'1 !! A 1 ION ,
.
3 I ,'
79081405m 63 eml
AVI.IC AGE I) AILY UNil POWI 1( !.l VLL DOCKET NO. Ch2"6 liio i an Po i n t.
UNIT No 3 DATE
!!
COMPLETED g;y C . Connell TELEPIl0NE 914-739-3200 MONT!! July 1979 DAY AVERAGE D A!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe NetJ (MWe Net) y 618 37 610 615 614 2 18 .
3 617 39 612 615 20 603 4
5 615 21 6"4 616 593 615 589 7 3 g 614 2.g 594 613 586 9 25 612 26 597 10
!! C '
27 All 610 636 g
33 608 29 635 g 593 638 30 15 604 31 631 16 -
Fo'
.
INS 1 RUCTIONS On this fornut. hst the nerage daily unit power levelin MWe. Net for each day in the repostnig anonth.Coinpute to the riestest w hole niegawatt. -
-
(9/77)
,. n j n\ OL
'
,
t .i
)\
- - - -
_ _
50-286 UNITS!!UTDOWNS AND POWER REDUCTIONS DOC}:ET NO. .
UNil N etE Indian Point ,,o . 3
..
DATE 9 'l COMPLETED DY o - r-nM1 REPORT MONTl! July 1979 TELEril0NE 914 73o a2O
-
.
- E E No. Date
,
g
.5 ? 3 4 Yl Licensee ,Eg, {% Cause & Corrective 3g g ,g g 5 Esent gg o-3 Action to
$E cf Igg
< g Report # to O [U O
Present Recurrentt C
29 790729 P .7 A 1 N/A IIII VALVEX F Load reduction caused by decreasing condenser vacuum due to low level in boiler feed pump seal collecting tack.
Corrective Action:
Serviced level control valve
.
T'* g
% l
-eg i
s1 1 2 3
- F: Forced 4 Ressen: Method:
ya S: Schedu!ed A Equ:pment Faiture(Explain) Exhibit F Instructions 1 Manual for Preparation of Data B-Maintenance ci Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram D-Regulatory Restriction Esent Report ILER) File (NUREG-4-Ot her (E xplain ) 0161) 1 -Operator Training 1 License Examination F AJnanistr:tbe 5 G-Operational Error (Explain)
(9/77) Il 04her (Explain) Exhibi.B Same Sourec
'MO!;THLY MAINTE!!A!!CE REPCRT
,
July 1979 Month DATE W.R. 4 EQUIPME!;T MALFUNCTION CORRECTIVE ACTIO!J 7-5-79 I-569-1B Charging Pump Press. Gauge Weld leak Removed pipe to tubing adapter, stop Valve #229 welded in new one.
7-13-79 I-576-2 #31 Charging Pump Seals leak Replaced seals in all 5 cylinders 7-15-79 I-578-1A #32 Boric Acid Transfer Mechanical seal leaks Replaced nochanical seal
.
'N
, 2 "W.
.
.%
MO:THLY I & C CATEGORY I REPORT
.
July 1979 Month Date I W.R. # Equ ipr.c nt
- Malfunction Corrective Action 7/23/79 IC-1-432-2 R-ll Containment APD Filter paper does not advanca Corrected misalignment between gear housing and paper drive motor.
.
T =g
.
>%
Qjd
.a a
.
.
SU.UARY OF CP3RATII;G EXPERIEt;CE July, 1979 Indian Point Unit 3 vas synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross gencration of 477,46] mwh for this re-porting period.
The unit operated at 70% power for the major part of the month and experienced one scheduled power ascension and one load reduction.
Until July 27, 1979, the urit was operating at 70% power in order to extend the operating cycle. At 14:32 that date, the unit load was increased to 75% power in order to meet with sche duling for a September 15, 1979 Refueling Outage start date. The unit rema; ed at 75% power for the rest of the month.
The load reduction occurred on July 29, 1979 at approximately 19:30.
At that time, the unit experienced a condenser vacuum transient due tc a failure in level control of Boiler Fced Pump seal collecting tank. Gen-erator output was reduced to 460 mw for approximately one hour.
- ,- , j /
-
t j i 0
..