to Ol'EltAlING DATA Ill.PoltT DOCKl.T NO.

5 0 h 6 DAll 8/3/79 COM11Eil D !!y C,

conne11 TELLPilONE (914 ) 7i"-0200 OPI:lt ATING STAT US Notes

1. Unit Name: 3" H m Po i n+- Mo. 3 Mucim Power Plant Julv 1979
2. !!cporting I'eriod:
3. Licensed 1 hennal Power (MWt): _ 3025
4. Nameplate Itatin;;(Gross MWe): _ 1013
5. Design ElectricalItatin;; tNet MWel:

ICOO

6. Maximum Dependable Capaci.y (Gross MWe): -

"< 5

7. blasimum Dependable Capacity (Net MWeJ:
8. If Changs Occur in Capacity Ratin;;s (Items Number 3 Throu;;h 7) Since Last Iteport. Gise Reasons:

None

9. Power Lese! To Which Restricted. lf Any (Net MWel:

N/A

10. I!casons for !!estrictions. If Any:

'lhis Month Yr..t o.Da t e Cumulatise 744 5087 25,584

11. !!ours In Rcrortm3 Period 744 4907.1 20,568
12. Number Of Hours Reactor Was Critical 0

0 0

13. Itcactor Pesene Shutdown llours 744 4878.5 20,086.2
14. I!aurs Generatcr On-Line 0

0 0

15. Unit !!cscne Shutdown flours
16. Grow The mal l nergy Gen; : d (MWil) 1,601,186 13,520,678 53,921,647 477,460 4,353,410 17,736,181
17. Gross Electric.il Energy Generaicd (MWill 454,669 4,196,640 17,045,450
18. Net Electrical Energy Generated (MWil) lon 95.9 78.5
19. Unit Senice I actor 100 95.9 78.5
20. Unit As.n!.ibility F.ictor 63.T 85.5 69.0
21. Unit Cap.icity Factor (Using MDC Net) 61.3 85.5 69.0
22. Unit Capiuty Factor (Using DER Net) 0

.6 3.9

23. Unit I orecil Outage R.cre
24. Shutdowns S-hednicd Oscr Nest 6 Monti:s (Type. Date.and Duration of f.ich t:

Refuelinu Outage Sep teric 1979 2.>. If Shul Dow n At Fud Of !!cport Period !Niiinatcil Date of Startup:

26. Umts In l est St.itus (l'aior to Cunnnercr il Operationi:

1:urceast Achicscil INill Al. Cilll! cal tl Y INill \\l. I'I.I'Clllit t rY COMMI !!CI A l. Ol'1 !! A 1 ION 79081405m 63 3 I,'

eml

AVI.IC AGE I) AILY UNil POWI 1( !.l VLL DOCKET NO.

Ch2"6 liio i an Po i n t.

UNIT No 3 DATE COMPLETED g;y C. Connell TELEPIl0NE 914-739-3200 MONT!!

July 1979 DAY AVERAGE D A!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe NetJ (MWe Net) 618 610 y

37 615 614 2

18 617 3

39 612 615 603 4

20 5

615 21 6"4 616 593 615 589 7

3 g

614 2.g 594 613 586 9

25 612 597 10 26 C '

27 All 610 636 g

608 635 33 29 593 638 g

30 15 604 31 631 16 Fo' INS 1 RUCTIONS On this fornut. hst the nerage daily unit power levelin MWe. Net for each day in the repostnig anonth.Coinpute to the riestest w hole niegawatt.

(9/77) n\\ O L

,. n j

)\\

t.i

50-286 UNITS!!UTDOWNS AND POWER REDUCTIONS DOC}:ET NO.

UNil N etE Indian Point

,,o. 3 DATE 9 'l REPORT MONTl! July 1979 COMPLETED DY

- r-nM1 o

TELEril0NE 914 73o a2O E

E

.5 ?

3 4 Yl Licensee

,Eg,

{%

Cause & Corrective No.

Date g

3g g

,g g 5 Esent gg o-3 Action to

$E cf Igg Report #

to O

[U Present Recurrentt g

O C

29 790729 P

.7 A

1 N/A IIII VALVEX F Load reduction caused by decreasing condenser vacuum due to low level in boiler feed pump seal collecting tack.

Corrective Action:

Serviced level control valve T'* g l

-eg i

s1 1

2 3

4 F: Forced Ressen:

Method:

Exhibit F Instructions ya S: Schedu!ed A Equ:pment Faiture(Explain) 1 Manual for Preparation of Data B-Maintenance ci Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram Esent Report ILER) File (NUREG-D-Regulatory Restriction 4-Ot her (E xplain )

0161) 1 -Operator Training 1 License Examination F AJnanistr:tbe 5

G-Operational Error (Explain)

Exhibi.B Same Sourec (9/77)

Il 04her (Explain)

'MO!;THLY MAINTE!!A!!CE REPCRT July 1979 Month DATE W.R.

4 EQUIPME!;T MALFUNCTION CORRECTIVE ACTIO!J 7-5-79 I-569-1B Charging Pump Press. Gauge Weld leak Removed pipe to tubing adapter, stop Valve #229 welded in new one.

7-13-79 I-576-2

  1. 31 Charging Pump Seals leak Replaced seals in all 5 cylinders 7-15-79 I-578-1A
  1. 32 Boric Acid Transfer Mechanical seal leaks Replaced nochanical seal

'N 2

"W.

MO:THLY I & C CATEGORY I REPORT July 1979 Month Date I

W.R.

Equ ipr.c nt Malfunction Corrective Action 7/23/79 IC-1-432-2 R-ll Containment APD Filter paper does not advanca Corrected misalignment between gear housing and paper drive motor.

T =g Qjd

.a a

SU.UARY OF CP3RATII;G EXPERIEt;CE July, 1979 Indian Point Unit 3 vas synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross gencration of 477,46] mwh for this re-porting period.

The unit operated at 70% power for the major part of the month and experienced one scheduled power ascension and one load reduction.

Until July 27, 1979, the urit was operating at 70% power in order to extend the operating cycle. At 14:32 that date, the unit load was increased to 75% power in order to meet with sche duling for a September 15, 1979 Refueling Outage start date.

The unit rema; ed at 75% power for the rest of the month.

The load reduction occurred on July 29, 1979 at approximately 19:30.

At that time, the unit experienced a condenser vacuum transient due tc a failure in level control of Boiler Fced Pump seal collecting tank.

Gen-erator output was reduced to 460 mw for approximately one hour.

, j /