to Ol'EltAlING DATA Ill.PoltT DOCKl.T NO.
5 0 h 6 DAll 8/3/79 COM11Eil D !!y C,
conne11 TELLPilONE (914 ) 7i"-0200 OPI:lt ATING STAT US Notes
- 1. Unit Name: 3" H m Po i n+- Mo. 3 Mucim Power Plant Julv 1979
- 2. !!cporting I'eriod:
- 3. Licensed 1 hennal Power (MWt): _ 3025
- 4. Nameplate Itatin;;(Gross MWe): _ 1013
- 5. Design ElectricalItatin;; tNet MWel:
ICOO
- 6. Maximum Dependable Capaci.y (Gross MWe): -
"< 5
- 7. blasimum Dependable Capacity (Net MWeJ:
- 8. If Changs Occur in Capacity Ratin;;s (Items Number 3 Throu;;h 7) Since Last Iteport. Gise Reasons:
None
- 9. Power Lese! To Which Restricted. lf Any (Net MWel:
N/A
- 10. I!casons for !!estrictions. If Any:
'lhis Month Yr..t o.Da t e Cumulatise 744 5087 25,584
- 11. !!ours In Rcrortm3 Period 744 4907.1 20,568
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Itcactor Pesene Shutdown llours 744 4878.5 20,086.2
- 14. I!aurs Generatcr On-Line 0
0 0
- 15. Unit !!cscne Shutdown flours
- 16. Grow The mal l nergy Gen; : d (MWil) 1,601,186 13,520,678 53,921,647 477,460 4,353,410 17,736,181
- 17. Gross Electric.il Energy Generaicd (MWill 454,669 4,196,640 17,045,450
- 18. Net Electrical Energy Generated (MWil) lon 95.9 78.5
- 19. Unit Senice I actor 100 95.9 78.5
- 20. Unit As.n!.ibility F.ictor 63.T 85.5 69.0
- 21. Unit Cap.icity Factor (Using MDC Net) 61.3 85.5 69.0
- 22. Unit Capiuty Factor (Using DER Net) 0
.6 3.9
- 23. Unit I orecil Outage R.cre
- 24. Shutdowns S-hednicd Oscr Nest 6 Monti:s (Type. Date.and Duration of f.ich t:
Refuelinu Outage Sep teric 1979 2.>. If Shul Dow n At Fud Of !!cport Period !Niiinatcil Date of Startup:
- 26. Umts In l est St.itus (l'aior to Cunnnercr il Operationi:
1:urceast Achicscil INill Al. Cilll! cal tl Y INill \\l. I'I.I'Clllit t rY COMMI !!CI A l. Ol'1 !! A 1 ION 79081405m 63 3 I,'
eml
AVI.IC AGE I) AILY UNil POWI 1( !.l VLL DOCKET NO.
Ch2"6 liio i an Po i n t.
UNIT No 3 DATE COMPLETED g;y C. Connell TELEPIl0NE 914-739-3200 MONT!!
July 1979 DAY AVERAGE D A!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe NetJ (MWe Net) 618 610 y
37 615 614 2
18 617 3
39 612 615 603 4
20 5
615 21 6"4 616 593 615 589 7
3 g
614 2.g 594 613 586 9
25 612 597 10 26 C '
27 All 610 636 g
608 635 33 29 593 638 g
30 15 604 31 631 16 Fo' INS 1 RUCTIONS On this fornut. hst the nerage daily unit power levelin MWe. Net for each day in the repostnig anonth.Coinpute to the riestest w hole niegawatt.
(9/77) n\\ O L
,. n j
)\\
t.i
50-286 UNITS!!UTDOWNS AND POWER REDUCTIONS DOC}:ET NO.
UNil N etE Indian Point
,,o. 3 DATE 9 'l REPORT MONTl! July 1979 COMPLETED DY
- r-nM1 o
TELEril0NE 914 73o a2O E
E
.5 ?
3 4 Yl Licensee
,Eg,
{%
Cause & Corrective No.
Date g
3g g
,g g 5 Esent gg o-3 Action to
$E cf Igg Report #
to O
[U Present Recurrentt g
O C
29 790729 P
.7 A
1 N/A IIII VALVEX F Load reduction caused by decreasing condenser vacuum due to low level in boiler feed pump seal collecting tack.
Corrective Action:
Serviced level control valve T'* g l
-eg i
s1 1
2 3
4 F: Forced Ressen:
Method:
Exhibit F Instructions ya S: Schedu!ed A Equ:pment Faiture(Explain) 1 Manual for Preparation of Data B-Maintenance ci Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram Esent Report ILER) File (NUREG-D-Regulatory Restriction 4-Ot her (E xplain )
0161) 1 -Operator Training 1 License Examination F AJnanistr:tbe 5
G-Operational Error (Explain)
Exhibi.B Same Sourec (9/77)
Il 04her (Explain)
'MO!;THLY MAINTE!!A!!CE REPCRT July 1979 Month DATE W.R.
4 EQUIPME!;T MALFUNCTION CORRECTIVE ACTIO!J 7-5-79 I-569-1B Charging Pump Press. Gauge Weld leak Removed pipe to tubing adapter, stop Valve #229 welded in new one.
7-13-79 I-576-2
- 31 Charging Pump Seals leak Replaced seals in all 5 cylinders 7-15-79 I-578-1A
- 32 Boric Acid Transfer Mechanical seal leaks Replaced nochanical seal
'N 2
"W.
MO:THLY I & C CATEGORY I REPORT July 1979 Month Date I
W.R.
Equ ipr.c nt Malfunction Corrective Action 7/23/79 IC-1-432-2 R-ll Containment APD Filter paper does not advanca Corrected misalignment between gear housing and paper drive motor.
T =g Qjd
.a a
SU.UARY OF CP3RATII;G EXPERIEt;CE July, 1979 Indian Point Unit 3 vas synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross gencration of 477,46] mwh for this re-porting period.
The unit operated at 70% power for the major part of the month and experienced one scheduled power ascension and one load reduction.
Until July 27, 1979, the urit was operating at 70% power in order to extend the operating cycle. At 14:32 that date, the unit load was increased to 75% power in order to meet with sche duling for a September 15, 1979 Refueling Outage start date.
The unit rema; ed at 75% power for the rest of the month.
The load reduction occurred on July 29, 1979 at approximately 19:30.
At that time, the unit experienced a condenser vacuum transient due tc a failure in level control of Boiler Fced Pump seal collecting tank.
Gen-erator output was reduced to 460 mw for approximately one hour.