ML17352A531: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t t~REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)ACCESSXON NBR:9404180387 DOC.DATE: 94/03/31 NOTARXZED:
{{#Wiki_filter:t ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t
NO FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATXON MOWREY,C.L.
                ~
Florida Power&Light Co.PLUNKETT,T.F.
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
Florida Power&Light.Co.RECIP.NAME RECIPIENT AFFILXATION DOCKET g 05000250 05000251 gR I  
ACCESSXON NBR:9404180387                         DOC.DATE: 94/03/31   NOTARXZED: NO         DOCKET g FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light                           C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                           C 05000251 AUTH. NAME           AUTHOR AFFILIATXON MOWREY,C.L.           Florida                   Power & Light Co.
PLUNKETT,T.F.
RECIP.NAME Florida RECIPIENT AFFILXATION Power & Light. Co.                                   gR I


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Mar 1994 for Turkey Point Units 3&4.W/940413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D A RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA N~RJJ30 S OEAB E~IM 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R AEOD/DS P/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPXES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 D D
Monthly operating repts                       for Mar 1994 for Turkey Point Units         D 3   & 4.W/940413                   ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                               ENCL     SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:                                                                                                 A RECIPIENT                           COPIES          RECIPIENT        COPXES ID  CODE/NAME                        LTTR ENCL      ID CODE/NAME     LTTR ENCL          D PD2-2 PD                                 1    1    CROTEAU,R            1    1 D
INTERNAL: AEOD/DOA                                   1     1     AEOD/DS P/TPAB       1    1 NRR/DRIL/RPEB E~IMS OEAB01 N~RJJ30                                  1 1
1 1    RGN2 1
1 1
1 EXTERNAL: EG&G BRYCE,J.H                            1     1     NRC PDR              1   1 NSIC                                      1     1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                           11   ENCL   11


FPL',pp i 8"i934 L-94-086 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
FPL',pp                                                         i8 L-94-086 "i934 10 CFR 50.36 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S.D..Ebneter, Regional Administrator, Region II, USNRC T~P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant g~OQ QQ5 9404180387 940331 I.I PDR ADOCK 05000250 R , PDR an Fpt Group company I(
Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and           4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 Turke Point 3 A ril 11 1994 C.L.Mowre 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 691 692 695 700 698 693 687 682 680 677 681 690 691 687 687 687 684 684 682 677 663 663 660 665 667 666 665 667 668 673 677 UNIT SHUTDOWNS:
Very   truly     yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S. D..Ebneter, Regional Administrator, Region II, USNRC T P. Johnson,
AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
        ~                  Senior Resident Inspector, USNRC, Turkey Point Plant g ~OQ QQ5 9404180387 940331             I.
50-250 Turke Point$3 A ril 11 1994 C.L.Mowre 305 246-6204 REPORT MONTH MARCH 1994 No.N/A Date N/A Type'/A Duration (Hours)N/A Reason2 N/A Method of Shutting Down Reactor N/A Licensee Event Reports N/A System Code N/A Component code N/A N/A Cause S Corrective Action to Prevent Recurrence F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training S License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
PDR R
Exhibit 1-Same Source
ADOCK 05000250
                  ,   PDR I
I(
an Fpt Group company


OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 4/1 1/94 COMPLETED BY C.L.MOWREY TELEPHONE 305/246/6204 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: MARCH 1994 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 744 744.0 0.0 744.0 1637553 529680 505949 100.0 100.0 102.1 98.1 0.0 1994 2160 2160.0 0.0 2112.2 4612879 1507515 1437959 97.8 97.8 100.0 96.1 2.2 186897.6 123420.2 844.4 121645.5 121.8 252752717 81089331 76707464 65.1 65.2 62.6 59.2 11.7 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:  
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT          Turke Point  3 DATE COMPLETED BY A ril 11 1994 C. L. Mowre TELEPHONE      305-246-6204 MONTH MARCH  1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94  691 3/02/94  692 3/03/94  695 3/04/94  700 3/05/94  698 3/06/94  693 3/07/94  687 3/08/94  682 3/09/94  680 3/10/94  677 3/11/94  681 3/12/94  690 3/13/94  691 3/14/94  687 3/15/94  687 3/16/94  687 3/17/94  684 3/18/94  684 3/19/94  682 3/20/94  677 3/21/94  663 3/22/94  663 3/23/94  660 3/24/94  665 3/25/94  667 3/26/94  666 3/27/94  665 3/28/94  667 3/29/94  668 3/30/94  673 3/31/94  677
 
UNIT SHUTDOWNS: AND            POWER REDUCTIONS DOCKET NO.              50-250 UNIT NAME:              Turke Point            $ 3 DATE:
COMPLETED BY:
A  ril C. L. Mowre 11    1994 TELEPHONE:                305      246-6204 REPORT MONTH MARCH 1994 No. Date          Duration    Reason2    Method  of  Licensee System Component                Cause  S Corrective Action to Type'/A (Hours)                Shutting      Event    Code      code                        Prevent Recurrence Down    Reports Reactor N/A      N/A            N/A        N/A        N/A        N/A        N/A      N/A        N/A F - Forced                  Reason                          Method                        Exhibit G - instructions        Exhibit  -  Same Source S - Scheduled              A  Equipment  Failure        1 - Manual                    for Preparation of Data 1
B -  Maintenance or Test Refueling 2 - Manual Scram              Entry Sheets Licensee C                              3  Automatic Scram          Event Report (LER)  File D - Regulatory restriction      4  Continued                (NUREG-0161)
E - Operator Training    S      5 - Load Reduction License Examination        9 - Other (Explain)
F -  Administrative G -  Operational Error (Explain)
H - Other  (Explain)
 
OPERATING DATA REPORT DOCKET NO         50 250 DATE                 4/1 1/94 COMPLETED BY C. L. MOWREY TELEPHONE     305/246/6204 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 3
: 2. REPORTING PERIOD:     MARCH 1994
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                     760
: 5. DESIGN ELECTRICAL RATING (NET MWE):               693
: 6. MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE           699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS   NUMBER 3 THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          744      2160        186897.6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             744.0    2160.0      123420.2
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0        844.4
: 14. HOURS GENERATOR ON-LINE                         744.0    2112.2      121645.5
: 15. UNIT RESERVE SHUTDOWN HOURS                                               121.8
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1637553    4612879    252752717
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       529680    1507515      81089331
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         505949    1437959      76707464
: 19. UNIT SERVICE FACTOR                             100.0      97.8          65. 1
: 20. UNIT AVAILABILITYFACTOR                          100.0      97.8          65.2
: 21. CAPACITY FACTOR (USING MDC NET)                 102. 1    100.0            62.6
: 22. CAPACITY FACTOR (USING DER NET)                   98. 1    96. 1          59.2
: 23. UNIT FORCED OUTAGE RATE                           0.0        2.2          11.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 1994
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE: COMPLETED BY TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT          Turke Point     3 DATE:
50-250 Turke Point 3 A ril 11 1994 C.L.Mowre 305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially 100%and maintained that level throughout the month.  
COMPLETED BY A
C.
ril 11 L. Mowre 1994 TELEPHONE:      305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially   100% and maintained that level throughout the month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT          Turke Point DATE COMPLETED BY A ril 11 1994 C. L. Mowre 4
TELEPHONE      305-246-6204 MONTH MARCH  1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94  696 3/02/94  696 3/03/94  698 3/04/94  703 3/05/94  701 3/06/94  698 3/07/94  692 3/08/94  688 3/09/94  686 3/10/94  257 3/11/94      0 3/12/94      0 3/13/94      0 3/14/94      0 3/15/94      0 3/16/94      0 3/17/94      0 3/18/94  351 3/19/94  619 3/20/94  676 3/21/94  672 3/22/94  671 3/23/94  671 3/24/94  670 3/25/94  672 3/26/94  673 3/27/94  673 3/28/94  674 3/29/94  675 3/30/94  682 3/31/94  685
 
                                                                                                                                                  ~ ~
UNIT    SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.              50-251 UNIT NAME:
DATE COMPLETED BY: C. L. Mowre A  ril    11 1994 TELEPHONE                  305 246-6204 REPORT MONTH MARCH 1994 No.      Date Type Duration    Reason    Yethod of    Licensee    System                        Cause  4  Corrective Action to (Hours)                Shutting      Event      Code  Component Code                        Prevent Recurrence Down        Reportf Reactor 02      031094      184.77                            251-94-002            PIPEXX      Shutdown  to repair Yovable Incore Detector Flux Yapper Guide Tube 03      031894        0.0                                  N/A        CC    PIPEXX      Steam Generator Chemistry    Hold-point at  30%
F -  Forced                Reason                          Yethod                      Exhibit  0  Instructions        Exhibit  - Same  Source S  Scheduled              A -  Equipment Failure          1 - Yanual                  for Preparation of    Data 1
B  Haintenance  or Test      2 - Yanual Scram            Entry Sheets Licensee C  Refueling                  3  Automatic Scram        Event Report (LER)    File D  Regulatory  restriction    4 - Continued                (NUREG-0161)
E -  Operator Training 4        5  Load Reduction License Examination        9  Other (Explain)
F  Administrative G  Operational Error (Explain)
H  Other (Explain)
 
                                                                                      ~ ~
OPERATING DATA REPORT DOCKET NO          50  -  251 DATE                  4/11/94 COMPLETED BY C. L. MOWREY TELEPHONE      305/246/6204 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT    UNIT 4
: 2. REPORTING PERIOD:      MARCH 1994
: 3. LICENSED THERMAL POWER (MWT):                  2200
: 4. NAMEPLATE RATING (GROSS MWE):                    760
: 5. DESIGN ELECTRICAL RATING (NET MWE):              693
: 6. MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE:        699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER    3 THROUGH  7)
SINCE LAST REPORT,  GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS  FOR RESTRICTIONS> IF ANY:
MONTHLY    -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        744      2160        180629.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL            568.9    1984. 9      119265.2
: 13. REACTOR RESERVE SHUTDOWN HOURS                    0.0        0.0          166.6
: 14. HOURS GFNERATOR ON-LINE                        559.2    1975. 2      115300.2
: 15. UNIT RESERVE SHUTDOWN HOURS                                                577.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)          1210387    4279371    243339326
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)        392485    1396955      77750925
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)          372330    1330585      73565817
: 19. UNIT SERVICE FACTOR                              75.2  =
91.4            63.8
: 20. UNIT AVAILABILITYFACTOR                          75.2      91.4            64.2
: 21. CAPACITY FACTOR (USING MOC NET)                  75.1      92.5            62. 1
: 22. CAPACITY FACTOR M(USING DER NET)                72.2      88.9            58.8
: 23. UNIT FORCED OUTAGE RATE                          24.8        8.5          12.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
: 25. IF  SHUT DOWN AT END OF REPORT PERIOD,  ESTIMATED DATE OF STARTUP:


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 Turke Point 4 A ril 11 1994 C.L.Mowre 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 696 696 698 703 701 698 692 688 686 257 0 0 0 0 0 0 0 351 619 676 672 671 671 670 672 673 673 674 675 682 685
~ ~
~~UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE COMPLETED BY: TELEPHONE 50-251 A ril 11 1994 C.L.Mowre 305 246-6204 REPORT MONTH MARCH 1994 No.02 03 Date 031094 031894 Type Duration (Hours)184.77 0.0 Reason Yethod of Shutting Down Reactor Licensee Event Reportf 251-94-002 N/A System Code CC Component Code PIPEXX PIPEXX Cause 4 Corrective Action to Prevent Recurrence Shutdown to repair Yovable Incore Detector Flux Yapper Guide Tube Steam Generator Chemistry Hold-point at 30%F-Forced S-Scheduled Reason A-Equipment Failure B-Haintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Yethod 1-Yanual 2-Yanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit 0-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
          ~
Exhibit 1-Same Source OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 4/11/94 COMPLETED BY C.L.MOWREY TELEPHONE 305/246/6204
            'UMMARY           OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT:         Turke Point DATE COMPLETE BY:
~~1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: MARCH 1994 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE: 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS>
A ril 11 1994 C. L. Mowre 4
IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MOC NET)22.CAPACITY FACTOR M(USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE 744 568.9 0.0 559.2 1210387 392485 372330 75.2=75.2 75.1 72.2 24.8 2160 1984.9 0.0 1975.2 4279371 1396955 1330585 91.4 91.4 92.5 88.9 8.5 180629.0 119265.2 166.6 115300.2 577.3 243339326 77750925 73565817 63.8 64.2 62.1 58.8 12.7 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
TELEPHONE:      305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100% power. On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system.
~~~'UMMARY OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE:
Following completion of the repair, the unit had a hold-point at 30% for steam generator chemistry. The unit was returned to essentially 100% power on March 19, and remained at that level through the end of the month.}}
50-251 Turke Point 4 A ril 11 1994 C.L.Mowre 305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100%power.On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system.Following completion of the repair, the unit had a hold-point at 30%for steam generator chemistry.
The unit was returned to essentially 100%power on March 19, and remained at that level through the end of the month.}}

Latest revision as of 07:36, 22 October 2019

Monthly Operating Repts for Mar 1994 for Turkey Point Units 3 & 4.W/940413 Ltr
ML17352A531
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1994
From: Mowrey C, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-086, L-94-86, NUDOCS 9404180387
Download: ML17352A531 (14)


Text

t ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t

~

REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSXON NBR:9404180387 DOC.DATE: 94/03/31 NOTARXZED: NO DOCKET g FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON MOWREY,C.L. Florida Power & Light Co.

PLUNKETT,T.F.

RECIP.NAME Florida RECIPIENT AFFILXATION Power & Light. Co. gR I

SUBJECT:

Monthly operating repts for Mar 1994 for Turkey Point Units D 3 & 4.W/940413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: A RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DRIL/RPEB E~IMS OEAB01 N~RJJ30 1 1

1 1 RGN2 1

1 1

1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

FPL',pp i8 L-94-086 "i934 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S. D..Ebneter, Regional Administrator, Region II, USNRC T P. Johnson,

~ Senior Resident Inspector, USNRC, Turkey Point Plant g ~OQ QQ5 9404180387 940331 I.

PDR R

ADOCK 05000250

, PDR I

I(

an Fpt Group company

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE COMPLETED BY A ril 11 1994 C. L. Mowre TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 691 3/02/94 692 3/03/94 695 3/04/94 700 3/05/94 698 3/06/94 693 3/07/94 687 3/08/94 682 3/09/94 680 3/10/94 677 3/11/94 681 3/12/94 690 3/13/94 691 3/14/94 687 3/15/94 687 3/16/94 687 3/17/94 684 3/18/94 684 3/19/94 682 3/20/94 677 3/21/94 663 3/22/94 663 3/23/94 660 3/24/94 665 3/25/94 667 3/26/94 666 3/27/94 665 3/28/94 667 3/29/94 668 3/30/94 673 3/31/94 677

UNIT SHUTDOWNS: AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point $ 3 DATE:

COMPLETED BY:

A ril C. L. Mowre 11 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 No. Date Duration Reason2 Method of Licensee System Component Cause S Corrective Action to Type'/A (Hours) Shutting Event Code code Prevent Recurrence Down Reports Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit G - instructions Exhibit - Same Source S - Scheduled A Equipment Failure 1 - Manual for Preparation of Data 1

B - Maintenance or Test Refueling 2 - Manual Scram Entry Sheets Licensee C 3 Automatic Scram Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training S 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/1 1/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 186897.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160.0 123420.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 2112.2 121645.5
15. UNIT RESERVE SHUTDOWN HOURS 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1637553 4612879 252752717
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 529680 1507515 81089331
18. NET ELECTRICAL ENERGY GENERATED (MWH) 505949 1437959 76707464
19. UNIT SERVICE FACTOR 100.0 97.8 65. 1
20. UNIT AVAILABILITYFACTOR 100.0 97.8 65.2
21. CAPACITY FACTOR (USING MDC NET) 102. 1 100.0 62.6
22. CAPACITY FACTOR (USING DER NET) 98. 1 96. 1 59.2
23. UNIT FORCED OUTAGE RATE 0.0 2.2 11.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 1994
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE:

COMPLETED BY A

C.

ril 11 L. Mowre 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially 100% and maintained that level throughout the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point DATE COMPLETED BY A ril 11 1994 C. L. Mowre 4

TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 696 3/02/94 696 3/03/94 698 3/04/94 703 3/05/94 701 3/06/94 698 3/07/94 692 3/08/94 688 3/09/94 686 3/10/94 257 3/11/94 0 3/12/94 0 3/13/94 0 3/14/94 0 3/15/94 0 3/16/94 0 3/17/94 0 3/18/94 351 3/19/94 619 3/20/94 676 3/21/94 672 3/22/94 671 3/23/94 671 3/24/94 670 3/25/94 672 3/26/94 673 3/27/94 673 3/28/94 674 3/29/94 675 3/30/94 682 3/31/94 685

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME:

DATE COMPLETED BY: C. L. Mowre A ril 11 1994 TELEPHONE 305 246-6204 REPORT MONTH MARCH 1994 No. Date Type Duration Reason Yethod of Licensee System Cause 4 Corrective Action to (Hours) Shutting Event Code Component Code Prevent Recurrence Down Reportf Reactor 02 031094 184.77 251-94-002 PIPEXX Shutdown to repair Yovable Incore Detector Flux Yapper Guide Tube 03 031894 0.0 N/A CC PIPEXX Steam Generator Chemistry Hold-point at 30%

F - Forced Reason Yethod Exhibit 0 Instructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 - Yanual for Preparation of Data 1

B Haintenance or Test 2 - Yanual Scram Entry Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 Load Reduction License Examination 9 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

~ ~

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/11/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS> IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 180629.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 568.9 1984. 9 119265.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GFNERATOR ON-LINE 559.2 1975. 2 115300.2
15. UNIT RESERVE SHUTDOWN HOURS 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1210387 4279371 243339326
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392485 1396955 77750925
18. NET ELECTRICAL ENERGY GENERATED (MWH) 372330 1330585 73565817
19. UNIT SERVICE FACTOR 75.2 =

91.4 63.8

20. UNIT AVAILABILITYFACTOR 75.2 91.4 64.2
21. CAPACITY FACTOR (USING MOC NET) 75.1 92.5 62. 1
22. CAPACITY FACTOR M(USING DER NET) 72.2 88.9 58.8
23. UNIT FORCED OUTAGE RATE 24.8 8.5 12.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~ ~

~

'UMMARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point DATE COMPLETE BY:

A ril 11 1994 C. L. Mowre 4

TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100% power. On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system.

Following completion of the repair, the unit had a hold-point at 30% for steam generator chemistry. The unit was returned to essentially 100% power on March 19, and remained at that level through the end of the month.