.' .                                                    AUG 131986
                                          .
        Docket No. 50-440
        The Cleveland Electric Illuminating
          Company
        ATTN: Mr. Murray R. Edelman
                Vice President
                Nuclear Group
        Post Office Box 5000
        Cleveland, OH 44101
        Gentlemen:
        This refers to the special Operational Readiness inspection conducted by
        Messrs. R. C. Knop, J. H. Neisler, A. D. Morrongfello, K. A. Connaughton,
        J. W. McCormick-Barger, L. H. Jones, and D. L. Summers of this office,on
        July 7 through July 25, 1986, of activities at the Perry Nuclear Power Plant,
        Unit 1, authorized by NRC Facility Operating License No, MPF-45 and to the
        discussion of our findings with Messrs. M. Lyster, E. Riley, and other
        members of your staff at the conclusion of the inspection.
        The enclosed copy of our inspection report identifies areas examined during
        the inspection. Within these areas, the inspection consisted of a selective
        examination of procedures and representative records, observations, and
        interviews with personnel.
        No violations of NRC requirements were identified during the course of this
        inspection.                                                '
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
        this letter and the enclosed inspection report will be placed in the NRC
        Public Document Room.
        We will gladly discuss any questions you have concerning this inspection.
                                                    Sincerely,
                                                s' Original signed by William L. Forney "
                                                    R. F. Warnick, Chief
                                                    Division of Reactor Projects
        Enclosure:    Inspection Report ~
          No. 50-440/86021(DRP)
        See Attached Distribution
        RIII                            RIII                  RIII          RIII
                    '[Y
        McCorm ek-Barger/rr              Neisle{rTTO 4)Knop    dcd          &
                                                                          ,WErnick
            'd[/.2/fC ,                      /#b b                        D
      in*188#n88%          PDR
                                                                                      flf
 
                                                _ _ _ _ _
              *
      .
'
.  ,
  ' '
        The Cleveland Electric          '
                                            2
          Illuminating Company
        Distribution
        cc w/ enclosure:
        F. R. Stead, Manager, Perry
          Plant Technical Department
        M. D. Lyster, Manager, Perry Plant
          Operations Department                          ,
        E. M. Buzzelli, General Supervising              '
          Engineer, Nuclear Licensing and                l
          Compliance Section
        DCS/RSB (RIDS)
        Licensing Fee Management Branch
        Resident Inspector, RIII
        Harold W. Kohn, Ohio EPA
        Terry J. Lodge, Esq.
        James W. Harris, State of Ohio
        Robert H. Quillin, Ohio
          Department of Health
                                              .
}}
}}

Latest revision as of 19:42, 29 December 2020

Forwards Operational Readiness Insp Rept 50-440/86-21 on 860707-25.No Violations Noted
ML20205F864
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20205F869 List:
References
NUDOCS 8608190344
Download: ML20205F864 (2)


See also: IR 05000440/1986021

Text

e .

-

p ,,i 6

~

.' . AUG 131986

.

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the special Operational Readiness inspection conducted by

Messrs. R. C. Knop, J. H. Neisler, A. D. Morrongfello, K. A. Connaughton,

J. W. McCormick-Barger, L. H. Jones, and D. L. Summers of this office,on

July 7 through July 25, 1986, of activities at the Perry Nuclear Power Plant,

Unit 1, authorized by NRC Facility Operating License No, MPF-45 and to the

discussion of our findings with Messrs. M. Lyster, E. Riley, and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection. '

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

s' Original signed by William L. Forney "

R. F. Warnick, Chief

Division of Reactor Projects

Enclosure: Inspection Report ~

No. 50-440/86021(DRP)

See Attached Distribution

RIII RIII RIII RIII

'[Y

McCorm ek-Barger/rr Neisle{rTTO 4)Knop dcd &

,WErnick

'd[/.2/fC , /#b b D

in*188#n88% PDR

flf

_ _ _ _ _

.

'

. ,

' '

The Cleveland Electric '

2

Illuminating Company

Distribution

cc w/ enclosure:

F. R. Stead, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department ,

E. M. Buzzelli, General Supervising '

Engineer, Nuclear Licensing and l

Compliance Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

.