| RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | | RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. |
| Very truly yours, gp-P/u~ ve> h T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR R | | Very truly yours, gp-P/u~ ve> h T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR R |
| '
| |
| .
| |
| "'-'DR ADOCK 05000250 an FPL Group company | | "'-'DR ADOCK 05000250 an FPL Group company |
|
| |
|
Line 76: |
Line 74: |
| E - Operator Training & Ucense Examination 5.- Load Reduction F - Administrative 9 - Other (Exphin) | | E - Operator Training & Ucense Examination 5.- Load Reduction F - Administrative 9 - Other (Exphin) |
| G - OperationaIError (Explain) Exhibit1-Same Source H - Other(ExpiaIn) | | G - OperationaIError (Explain) Exhibit1-Same Source H - Other(ExpiaIn) |
|
| |
| '
| |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED DI UTION DEMONS TION SYSTEM U ~, ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light, Co.
PLUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating epts for Mar 1991 for Turkey Point Units 3 & . /910412 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 1@EjQ3LBQb EB10 1 1 NRR/DOEA/OEAB 1 1 G FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14
P.O. Box 029100, Miami, FI33102-9100 APR 1. 21991 L-91-113 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, gp-P/u~ ve> h T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR R
"'-'DR ADOCK 05000250 an FPL Group company
It
~I
')Qi f--
4 g>>
\ a
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke Point 3 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1 0 03/02/91 0 03/03/91 0 03/04/91 0 03/05/9 1 0 03/0 6/9 1 0 03/07/91 0 03/08/91 0 03/09/91 0 03/10/91 0 03/11/9 1 0 03/12/91 0 03/13/9 1 0 03/14/91 0' 03/15/9 1 03/16/9 1 0 03/17/9 1 0 03/18/9 1 0 03/19/91 0 03/20/91 0 03/2 1/9 1 0 03/22/91 0 03/23/91 0 03/24/91 0 03/25/91 0 03/26/91 0 03/27/91 0 03/28/91 0 03/29/91 0 03/3 0/9 1 0 03/31/91 0
OPERATING DATA REPORT DOCKET HO 50 - 250 DATE 4/18/91 COMPLETED'BY R. Ai TIERNEY TELEPHONE 385/246/6970 OPERATING STATUS li UNIT HA)IEI TURKEY POINT UNIT 3 2i REPORTING PERIODS HARCH 1991 3i LICENSED THERHAL POHER (lQT)1 2280 4 HANEPLATE RAlIHG (GROSS SK) l 760 5, DESIGN ELECTRIGtL RATlHG (NET SK) l 693 bi HAXI)m)I DEPENDABLE CAPACITY (GROSS SK) I 699 7i HAXIHUH DEPENDABLE CAPACITY (HH lNE) l 666 Bo IF CHANGES OCCUR IH CAPACITY RATINGS (ITEHS NJHBER 3 THROUGH 7)
SINCE LAST REPORT) GIVE REASONSI
'9. PONER LEVEL TO WHICH RESTRICTED'F AHY (HET H)IE) 10i REASONS FOR RESTRICTIONSt IF ANY)
HOHTHLY -YTD- Cm(ULATIVE iii HOURS IH REPORT PERIOD) 744 2160 160593ib 12i HUINER OF HOURS REACTOR WAS CRITICAL Go0 Go0 104473>2 13< REACTOR RESERVE SHUTINNH HOURS e,e 0.0 844i4 14< HOURS GENERATOR OH-LINE Go0 Go0 103055i7 15'NIT RESERVE SHUTDOHH HOURS GiG 0.0 121.8 ibo GROSS THEINAL EHERGY GENERATED (SN) 0 0 214231642 17< GROSS ELECTRICAL ENERGY GENERATED (NH) 0 0 68615991 18( HET ELECTRICAL ENERGY GENERATED (M) -566 -3825 64874693 19'NIT SERVICE- FACTOR Gi0 Gi0 64i2 20e UNIT AVAILABILITYFACTOR Gi0 Ge0 64>2 2li CAPACITY FACTOR (USING HDC HET) GiG Gi0 bli8 22'APACITY FACTOR (USING DER HET) Go0 Go0 58e3 23'NIT FORCED OUTAGE RATE 0,0 0.0 12>5 24> SHUTDO!5S SCHEDULED OVER NEXT 6 HONTHS t 25 IF SHUT DOmI AT EHD OF REPORT PERIOOt ESTIHATED DATE OF STARTUPl ie/03/91
~ .
UNlT SHUTDOWNS AND POWER REDUCTlQNS DOCKET NO. 50-250 Turkey Point k'3 DATE April 11, 1991.
COMPLETED BY R. A. Tierney REPORT MONTH March 1991 - 970 Method of Shutting Ucensee Cause 4 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason2 Reactor Report¹ Code4 Codes PreventRecurrence 22 901212 S 744 H/A EE Engine Unit 3 was shutdown for a scheduled Upgrades Outage.
2 F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment FaHure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Re D - Reguhtory Restriction 4 - Continued (NUREG4161)
E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Exphin)
G - Operational Error (Exphin) Exhibit 1-Same Source H - Other(Exphin)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO' 50-250 UNIT Turke Point 3 DATE' ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH March 1991 Unit. 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/91 03/06/91 03/07/91 03/08/91 03/09/91 03/10/9 1 03/11/9 1 03/12/9 1
1'3/13/9 03/14/9 1 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/9 1 03/2 0/9 1 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/2 6/9 1 03/27/91 03/28/91 03/29/91 03/30/91 03/31/91
OPERATING DATA REPORT DOCKET HO 59 - 251 DATE 4/10/91 COMPLETED BY R>> A>> TIERNEY TELEPHONE 395/246/6970 OPERATING STATUS 1 UNIT HAMEl TURKEY POINT UNIT 4 2>> REPORTIHG PERIODS MARCH 1991
- 3. LICENSED THERMAL PmKR (NIT) f 2290 4>> INIEPLATE RATING (GROSS MHE)t 760 5>> DESIGH ELECTRICAL RATING (HET NK) t 693 6>> MAXINN DEPENDABLE CAPACITY (GROSS ISE) t 699 7>> MAXIMUM DEPEHDABLE CAPACITY (NET SK)>> 666 8>> IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS HSIBER 3 THROUGH 7)
SIHCE LAST REPORTS GIVE REASONSt 9>> POHER LEVEL TO HHICH RESTRICTEDt IF NY (NET ISK).
10>> REASONS FOR RESTRKTIOHSt IF ANY'i>>
HOURS IH REPORT PERIOD>> 744 2160 154325>>0 12>> NUMBER OF HOURS REACTOR HAS CRITICAL 0>>8 e,e 101186>>4 13>> REACTOR RESERVE SHUTDOMH HOURS 0>>0 0,0 166>>6 14>> HOURS GENERATOR OH-LINE 0.0 0.0 97567>>i 15>> UHIT RESERVE SHUTDINH HOURS 0.0 0>>0 32>>l 16>> GROSS THERMA! EHERGY GENERATED (NN) 0 0 205630060 17>> GROSS ELECTRICAL ENERGY GEHERATED (MMH) 0 0 65612889 18>> HET ELECTRICAL ENERGY GENERATED (MtIH) <89 -2687 62050941 19>> UNIT SERVICE FACTOR 0>>8 0.0 63>>2 20>> UNIT AVAILABILITYFACTOR 0.0 e,e 63>>2 21>> CAPACITY FACTOR (USING MDC HET) 0>>0 0>>0 61.5 22>> CAPACITY FACTOR (USING DER NET) 0.0 0,0 58>>0 23>> INIT FORCED OUTAGE RATE 0>>0 0.0 11>>9 24>> SHUTINNHS'SCHEDULED OVER NEXT 6 MONTHS>>
25>> IF SHUT INNH AT EIS OF REPORT PERIODr ESTIMATED'ATE OF STARTUP>> li/94/91
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. - 5 UNIT NAME Turkey Point ¹4 DATE Apri1 11, 1991 COMPLETED BY R. A. Tierney REPORT MONTH March, 1991 TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Duration Down Event System Component Actionto Date Type (Hours) Reasons Reactor Report¹ Code4 Co'des Prevent Recurrence 901124 , S 744 C/H N/A RC/EE FUELXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refue1ing 0utage.
2 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training & Ucense Examination 5.- Load Reduction F - Administrative 9 - Other (Exphin)
G - OperationaIError (Explain) Exhibit1-Same Source H - Other(ExpiaIn)
SUMMARY
OF OPERATING EXPERIENCE DOCKET, NO ~ 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970
,REPORT MONTH March 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 26, 1990.
0 , ~
'