ML17354A385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 92: Line 92:
H - Other (Explain)
H - Other (Explain)


          *
             ~
             ~
OP    ING DATA REPORT DOCKET NO                      50 -251 DATE                          01/08/97 PAEPAAED BY                  J. E. Knorr TELEPHONE                (305) 246-6757
OP    ING DATA REPORT DOCKET NO                      50 -251 DATE                          01/08/97 PAEPAAED BY                  J. E. Knorr TELEPHONE                (305) 246-6757

Latest revision as of 21:17, 3 February 2020

Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr
ML17354A385
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-11, NUDOCS 9701170309
Download: ML17354A385 (11)


Text

CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE) 1

! ACCESSION NBR:9701170309 DOC'.DATE: 96/12/31 NOTARIZED: NO DOCKET I FACIL:50<250. Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

'PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL , '10

L-97-11 APL 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

>'7005y 970ii7030'F 9b1231 PDR ADQCK 05000250 R PDR an FPL Group company

AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-250 uNIT Turkey Point k3 DATE Jan 08. 1997 COMPLETED 8Y J. E. Knorr TELEPHONE (305) 246-6757 MONIH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/96 724 12/02/96 719 12/03/96 715 12/04/96 714 12/05/96 715 12/06/96 712 12/07/96 710 12/08/96 712 12/09/96 725 12/10/96 731 12/11/96 728 12/12/96 720 12/13/96 717 12/14/96 715 12/15/96 719 12/16/96 723 12/17/96 721 12/18/96 720 12/19/96 720 12/20/96 730 12/21/96 735 12/22/96 731 12/23/96 727 12/24/96 724 12/25/96 720 12/26/96 717

'2/27/96 711 12/28/96 710 12/29/96 708 12/30/96 721 12/31/96 709

OP ING DATA REPORT DOCKET NO 50 - 250 DATE 01/08/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: December, 1996
3. UCENSED THERMALPOWER (MWD: 2300
4. NAMEPlATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 720
6. MAXIMUMDfPENDABLE CAPACllY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACllY (NET MWE): 693
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.

GIVE REASONS:

9. POWER LEVEL TO WHICH RESIICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMUlATIVE

11. HOURS IN REPORT PERIOD: 7449 87849 211041')
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8545.6 1454515
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844A
14. HOURS GENEPATOR ON-LINE 744.0 8491A 143387.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 12'I.S
16. GROSS THERMAL ENERGY GENEPATED (MWH) 1704245 18542301 299573320 f
17. GROSS ELECTRICAL NERGY GENERATED (MWH) 559737 6031012 96267997
18. NET ELECTRICAL ENERGY GENERATED (MWH) 535188 5746810 91160206
19. UNIT SERVICE FACTOR 100.0 96.7 67.9
20. UNIT AVAILABIUlY FACTOR 100.0 96.7 689
21. CAPACflYFACTOR ( USING MDC NET) 1033 973 62A
22. CAPACllY FACTOR ( USING DER NET ) 99.9 93.6 60.1
23. UNIT FORCED OUTAGE RATE 0.0 33 103
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

RefueRng outage scheduled March 1997

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Duration Reason Method of Licensee System nent Cause C Corrective Action to (Hours) Shutting Event. code< Codes Prevent Recurrence Down Reports Reactora N/A 1 2 3 4 5 F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training S 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point $ 3 DATE: Januar 8 1997 COMPLETED BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100% reactor power through the month of December, 1996.

AVERAGE DAIL'I IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point k4 DATE Jan 08. 1997 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/Ol/96 724 12/02/96 721 12/03/96 716 12/04/96 716 12/05/96 718 12/06/96 714 12/07/96 710 12/08/96 711 12/09/96 724 12/10/96 730 12/11/96 726 12/12/96 722 12/13/96 718 12/14/96 715 12/15/96 716 12/16/96 720 12/17/96 720 12/18/96 721 12/19/96 722 12/20/96 733 12/21/96 737 12/22/96 733 12/23/96 729 12/24/96 726 12/25/96 723 12/26/96 719 12/27/96 714 12/28/96 714 12/29/96 713 12/30/96 726 12/31/96 713

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~

UNIT Turke Point $ 4 Januar 8, 1997 NAME'ATE:

TELEPHONE'0-251 COMPLETED BY J. E. Knorr (305) 246-6757 REPORT MONTH No. Date Duzation Reason Method of Licensee System Co~nant cause a Corrective Action to (Hours) Shutt,ing Event Code< Code> Prevent Recuzzence Down Repoztt Reactor>

N/A 1 2 3 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 Manual Scram Entry Sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training 6 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~

OP ING DATA REPORT DOCKET NO 50 -251 DATE 01/08/97 PAEPAAED BY J. E. Knorr TELEPHONE (305) 246-6757

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: December, 1996
3. UCENSED THERMALPOWER (MW): 2300
4. NAMEPLATE PATING (GROSS MWE): 760
5. DESIGN ELECTRICAL PATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE)
10. AESONS FOP RESTRICTION. IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOUAS IN REPORT PERIOD: 7440 87840 2047738)
12. NUMBER OF HOURS REACTOR WAS CRITICAL 7440 79672 1414530
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-UNE 744.0 7772.8 137166.0
15. UNIT AESERVE SHUTDOWN HOURS 0.0 0.0 5772
16. GROSS THERMAL ENERGY GENERATED (MWH) 1708644 16869311 290542568
17. GROSS fLECTRICAL ENERGY GfNERATED (MWH) 560873 5425732 92964873
18. NET ELECTRICAL ENERGY GENERATED (MWH) 536230 5164163 88053578
19. UNIT SERVICE FACTOR 100.0 885 67.0
20. UNIT AVAILABILIIY FACTOR 100.0 885 673
21. CAPACIIY FACTOR ( USING MDC NET) 104.0 87.7 62.1
22. CAPACIIY FACTOR ( USING DER NET) 100.1 843 59.8
23. UNIT FORCED OUTAGE RATE 0.0 03 9.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~,.

K

~ 0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:

Turke Point $ 4 Januar 8, 1997 COMPLETE BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 4 operated at approximately 100% reactor power through the month of December 1996.

~ ~ I