Line 3: Line 3:
| issue date = 02/29/1996
| issue date = 02/29/1996
| title = Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr
| title = Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr
| author name = HOVEY R J, KNORR J E
| author name = Hovey R, Knorr J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATCiO INFORMATION DISTR ECTION%STEM (RIDE)C''.''>>>>>>.:~il'i FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C".J'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C AU'AH.NAME
{{#Wiki_filter:AU'AH.NAME KNORR,J.E.
'U'AR AFFILIATION KNORR,J.E.
HOVEY,R.J.              Flor)da AFFILIATION Florpda Power Power
Florpda Power&Tight Co.HOVEY,R.J.
                                                  ~
Flor)da Power&Light Co.RECIP.NAME RE)IPIENT AFFILIATION
CATEGORY 1 REGULATCiO INFORMATION DISTR ECTION %STEM (RIDE)
'J DOCKET¹05000250 05000251 SUBJECT.: Month}y 3&4 960313 DISTRjBUTION CODE: IE24D TITLE: Monthly Operating NOTES: repts for Feb 1996 for Turkey Point Units COPIES RECEIVED:LTR I ENCL I SIZE:!Q Report (per Tech Specs)RECIPL'ENT ID CODE/NAME PD2-1.PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB FRATERNAL LITCO BRYCE F J H NRC PDR COPIES LTTR ENCL 1 1'1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R FILE CENTER 01 R NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
C''.''>>>>>>
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUl'RED:
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light
LTTR 9'ENCL E I'L FPL NAR13 1996 L-96-067 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
                  'U'AR                      Tight Light Co.
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, Robert J.Hovey Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant yBOO54 e~OS1~0S71 Vao~ae PDR ADOCK 05000250 R PDR an FPL Group company 1 i P OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 3/7/96 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: FEBRUARY 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHE~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LZNE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHj 18.NET ELECTRZCAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NONE 696 550.3 0.0 526.6 0.0 3%$768 323526 306886 75.7 75.7 66.2 63.6 24.3 1440 1294.3 0.0 1270.6 0.0 2rSV227 862310 821685 88.2 88.2 85.7 82.3 11.8 203697.6 138200.2 844.4 136166.2 121.8 2FK61246 91099295 86235081 66.8 66.9 64.5 61.1 11'25.ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Co.
IP 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.-ZL25Q.TELEPHONE:
il'i
REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Reports System code'caponent code'ause 4 Corrective Action to Prevent Recurrence 01 960201 0.0 N/A FILTERS GRASS fOULING Of INTAKE SCREENS/STRAI HERS 02 960201 0.0 N/A HH HTEXCH WATER BOX CLEANING 03 960201 0.0 N/A HB VALVEX TURBINE VALVE TEST 04 960209 53.5 LER 96-002 CC HTEXCH AUTO TRIP DUE TO HIGH S/G WATER LEVEL 05 960212 0.0 N/A CH VALVEX FAILURE Of MAIN FEEDWATER PUMP CHECK VALVE 06 960216 83.5 N/A f I LTERS GRASS FOULING Of INTAKE SCREENS/STRAINERS 07 960219 32.4 NA RB INSTRU ROD CONTROL PROBLEMS F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination F-Administrative C-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9 Other (Explain)Exhibit 0-Instructions for preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
          ".J'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C
Exhibit 1-same Source AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 317 371 685 699 709 707 702 686 604 0 0 246 379 384 371 58 0 0 0 0 383 683 686 687 687 686 686 686 686 DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
C DOCKET 05000250 05000251
REPORT MONTH Unit 3 began operation for the month at 60%reactor power.Power was reduced to 40%for a turbine valve test on February 2.Power was returned to 60%power for waterbox and heat exchanger cleaning on February 2 and taken to 100%power on February 3.The unit remained at essentially 100%power until February 9.On February 9 power was reduced to 60%power for waterbox cleaning and testing of a main feed water pump discharge check valve.During this testing an automatic reactor trip occurred on February 9 due to hi-hi steam generator water level, which is discussed in LER 96-002.The unit was restarted on February 11 and operated at approximately 60%during repair of the main feed water pump discharge check valve.On February 16 the unit was taken to Mode 3 due to a grass influx into the intake and remained off line until February 19.The unit was taken to Mode 2 on February 19 however returned to Mode 3 due to rod control problems.The unit was returned to power on February 21 and remained at essentially 100%power through the end of the month.
                                                                                              ¹ RECIP.NAME             RE)IPIENT AFFILIATION
                                'J SUBJECT.:   Month}y                 repts for  Feb 1996    for Turkey Point Units 3 & 4     960313 DISTRjBUTION CODE: IE24D           COPIES RECEIVED:LTR       I ENCL   I SIZE:   !Q TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPL'ENT         COPIES            RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME      LTTR ENCL PD2-1. PD                 1    1      CROTEAU,R              1    1 INTERNAL: AEOD/SPD/RRAB               '1    1      FILE  CENTER    01    1    1 NRR/DRPM/PECB             1    1      R                      1    1 FRATERNAL     LITCO BRYCE F J H         1   1       NOAC                   1   1 NRC PDR                    1   1 NOTE TO   ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN   5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUl'RED:           LTTR     9   'ENCL


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)02/01/96 02/02/96 02/03/96 02/04/96 02/05/96 02/06/96 02/07/96 02/08/96 02/09/96 02/10/96 02/11/96 02/12/96 02/13/96 02/14/96 02/15/96 02/16/96 02/17/96 02/18/96 02/19/96 02/20/96 02/21/96 02/22/96 02/23/96 02/24/96 02/25/96 02/26/96 02/27/96 02/28/96 02/29/96 689 688 689 698 709 709 707 704 700 693 692 697 701 700 697 695 703 705 700 695 690 681 675 681 681 678 678 670 664 C
E I
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 3/7/96 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: FEBRUARY 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 696 12.NUMBER OF HOURS REACTOR 696.0 13.REACTOR RESERVE SHUTDOWN HOURS 0.0 14.HOURS GENERATOR ON-LINE 696.0 15.UNIT RESERVE SHUTDOWN HO 0.0 17.GROSS ELECTRICAL ENERGY GENERATED (MWH7 504313 18.NET ELECTRICAL ENERGY GENERATED (MWH)481644 19.UNIT SERVICE FACTOR 100.0 20.UNIT AVAILABILITY FA 100.0 21.CAPACITY FACTOR (USING MD 103.9 22.CAPACITY FACTOR (USING DER NET)99.9 23.UNIT FORCED OUTAGE RATE 0.0 24.SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR MARCH 1996 1440 1440.0 0.0 1440.0 0.0 ST59845 1046564 999512 100.0 100.0 104.2 100.2 0.0 197429.0 134925.8 166.6 130833.2 577.2 YKE33102 88585705 83884427 66.3 66.6 64.7 61.3 10.2 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
'L
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
 
REPORT MONTH No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor'icensee Event Reports Systen Code Conponent Code'ause 4 Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Exan (nation F-Adninistratlve C-Operational Error (Explain)H-Othor (Explain)Method 1-Manual 2-Manual Scran 3-Autonatic Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit 0-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG 0161)Exhibit 1-Sane Sourco
FPL                                                      NAR13 1996 L-96-067 10 CFR  550.36 U. S. Nuclear Regulatory Commission Attn:      Document Control Desk Washington, D. C. 20555 Gentlemen:
)J~~DOCKET NO.UNIT'ATE'EPORT MONTH Unit 4 operated at essentially 100%reactor power for the month.A T,, coast down, due to fuel depletion, was begun at the end of the month in anticipation of the scheduled refueling shutdown on March 4.  
Re:    Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and              4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
.0 lt 1}}
Very truly yours, Robert J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S.      D. Ebneter,      Regional Administrator, Region II, USNRC T. P. Johnson,          Senior Resident Inspector, USNRC, Turkey Point Plant yBOO54 e~OS1~0S71        Vao~ae PDR    ADOCK      05000250 R                          PDR an FPL Group company
 
1 iP
 
OPERATING DATA REPORT DOCKET NO          50 - 250 DATE                3/ 7/96 PREPARED BY    J. E. KNORR TELEPHONE      305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT    UNIT 3
: 2. REPORTING PERIOD: FEBRUARY 1996
: 3. LICENSED THERMAL POWER (MWT):                  2200
: 4. NAMEPLATE RATING (GROSS MWE):                  760
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE~        699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS  NUMBER 3 THROUGH    7)
SINCE LAST REPORT, GIVE REASONS:
: 9.                                  I
: 10. REASONS FOR RESTRICTIONS,  IF ANY:
MONTHLY    -YTD-  CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        696      1440        203697.6
: 12. NUMBER OF HOURS REACTOR                        550.3    1294.3      138200.2
: 13. REACTOR RESERVE SHUTDOWN  HOURS                  0.0      0.0        844.4
: 14. HOURS GENERATOR ON-LZNE                        526.6    1270.6      136166.2
: 15. UNIT RESERVE SHUTDOWN HO                          0.0      0.0        121.8 3%$ 768  2rSV227      2FK61246
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWHj      323526    862310      91099295
: 18. NET ELECTRZCAL ENERGY GENERATED (MWH)        306886    821685      86235081
: 19. UNIT SERVICE FACTOR                            75.7      88.2          66.8
: 20. UNIT AVAILABILITYFA                            75.7      88.2          66.9
: 21. CAPACITY FACTOR (USING MD                      66.2      85.7          64.5
: 22. CAPACITY FACTOR (USING DER NET)                63.6      82.3          61.1
: 23. UNIT FORCED OUTAGE RATE                        24.3      11.8          11 '
: 24. SHUTDOWNS SCHEDULED OVER NONE
: 25. ZF  SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
IP 1
 
UNIT  SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
ZL25Q.
TELEPHONE:
REPORT MONTH No. Date  Type Duration (Hours)
Reason'ethod of      Event              code'ause code'caponent System                        4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 01  960201        0.0                            N/A              FILTERS  GRASS fOULING Of INTAKE SCREENS/STRAI HERS 02  960201        0.0                            N/A    HH        HTEXCH  WATER BOX CLEANING 03  960201        0.0                            N/A    HB        VALVEX  TURBINE VALVE TEST 04  960209        53.5                          LER 96-  CC        HTEXCH  AUTO TRIP DUE TO HIGH S/G WATER 002                      LEVEL 05 960212        0.0                            N/A    CH        VALVEX  FAILURE Of MAIN  FEEDWATER PUMP CHECK VALVE 06 960216        83.5                            N/A              fI LTERS GRASS FOULING  Of INTAKE SCREENS/STRAINERS 07 960219        32.4                            NA    RB        INSTRU  ROD CONTROL PROBLEMS
 
F - Forced    Reason                      Method              Exhibit 0 - Instructions Exhibit 1 - same Source S - Scheduled  A -  Equipment Failure      1 - Manual          for preparation of Data B - Maintenance or Test    2 - Manual Scram    Entry Sheets Licensee C -  Refueling              3 - Automatic Scram Event Report (LER) File D -  Regulatory restriction 4 - Continued      (NUREG-0161)
E -  Operator Training 4    5 - Load Reduction License Examination    9  Other (Explain)
F C - Administrative Operational Error (Explain)
H    Other (Explain)
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96   317 02/02/96   371 02/03/96   685 02/04/96   699 02/05/96   709 02/06/96   707 02/07/96   702 02/08/96   686 02/09/96   604 02/10/96       0 02/11/96       0 02/12/96   246 02/13/96   379 02/14/96   384 02/15/96   371 02/16/96     58 02/17/96       0 02/18/96       0 02/19/96       0 02/20/96       0 02/21/96   383 02/22/96   683 02/23/96   686 02/24/96   687 02/25/96   687 02/26/96   686 02/27/96   686 02/28/96   686 02/29/96   686
 
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit  3  began  operation for the month at 60% reactor power. Power was reduced    to  40% for a turbine valve test on February 2. Power was  returned  to  60% power  for waterbox  and heat exchanger cleaning on February 2 and taken to 100% power on February 3.
The unit remained at essentially 100% power until February 9. On February 9 power was reduced to 60% power for waterbox cleaning and testing of a main feed water pump discharge check valve.
During this testing an automatic reactor trip occurred on February 9 due to hi-hi steam generator water level, which is discussed in LER 96-002. The unit was restarted on February 11 and operated at approximately 60% during repair of the main feed water pump discharge check valve. On February 16 the unit was taken to Mode 3 due to a grass influx into the intake and remained off line until February 19. The unit was taken to Mode 2 on February 19 however returned to Mode 3 due to rod control problems. The unit was returned to power on February 21 and remained at essentially 100% power through the end of the month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96  689 02/02/96  688 02/03/96  689 02/04/96  698 02/05/96  709 02/06/96  709 02/07/96  707 02/08/96  704 02/09/96  700 02/10/96  693 02/11/96  692 02/12/96  697 02/13/96  701 02/14/96  700 02/15/96  697 02/16/96  695 02/17/96  703 02/18/96  705 02/19/96  700 02/20/96  695 02/21/96  690 02/22/96  681 02/23/96  675 02/24/96  681 02/25/96  681 02/26/96  678 02/27/96  678 02/28/96  670 02/29/96  664
 
C OPERATING DATA REPORT DOCKET NO           50 - 251 DATE                 3/ 7/96 PREPARED BY     J. E. KNORR TELEPHONE     305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 4
: 2. REPORTING PERIOD: FEBRUARY 1996
: 3. LICENSED THERMAL POWER (MWT):                   2200 4 . NAMEPLATE RATING (GROSS MWE):                   760
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER       3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9.                                   I
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                         696       1440        197429.0
: 12. NUMBER OF HOURS REACTOR                         696.0     1440.0      134925.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0       0.0        166.6
: 14. HOURS GENERATOR ON-LINE                         696.0     1440.0      130833.2
: 15. UNIT RESERVE SHUTDOWN HO                         0.0       0.0        577.2 ST59845    YKE33102
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH7       504313   1046564      88585705
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         481644     999512      83884427
: 19. UNIT SERVICE FACTOR                             100.0     100.0          66.3
: 20. UNIT AVAILABILITYFA                            100.0      100.0         66.6
: 21. CAPACITY FACTOR (USING MD                       103.9     104.2          64.7
: 22. CAPACITY FACTOR (USING DER NET)                 99.9     100.2          61.3
: 23. UNIT FORCED OUTAGE RATE                           0.0       0.0          10.2
: 24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR MARCH 1996
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.         Date Type Duration (Hours)
Reason       Method of           Event Systen Code Code'ause Conponent              4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports N/A F - Forced           Reason                        Method                  Exhibit 0 - Instructions Exhibit  1 - Sane Sourco S - Scheduled       A - Equipment Failure         1 - Manual              for Preparation of Data B - Maintenance or Test       2 - Manual Scran        Entry Sheets Licensee C - Refueling                 3 - Autonatic Scran    Event Report (LER) File D - Regulatory restriction     4 - Continued          (NUREG 0161)
E - Operator Training 4       5 - Load Reduction License Exan (nation     9 - Other (Explain)
F - Adninistratlve C - Operational Error (Explain)
H - Othor (Explain)
 
)
J
    ~ ~
DOCKET NO.
UNIT'ATE'EPORT MONTH Unit 4 operated at essentially 100% reactor power for the month.
A T,, coast down, due to fuel depletion, was begun at the end of the month in anticipation of the scheduled refueling shutdown on March 4.
 
.0 1 lt}}

Latest revision as of 21:24, 3 February 2020

Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr
ML17353A597
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/29/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-067, L-96-67, NUDOCS 9603190371
Download: ML17353A597 (17)


Text

AU'AH.NAME KNORR,J.E.

HOVEY,R.J. Flor)da AFFILIATION Florpda Power Power

~

CATEGORY 1 REGULATCiO INFORMATION DISTR ECTION %STEM (RIDE)

C.>>>>>>

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light

'U'AR Tight Light Co.

Co.

il'i

".J'0-251 Turkey Point Plant, Unit 4, Florida Power and Light C

C DOCKET 05000250 05000251

¹ RECIP.NAME RE)IPIENT AFFILIATION

'J SUBJECT.: Month}y repts for Feb 1996 for Turkey Point Units 3 & 4 960313 DISTRjBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL I SIZE: !Q TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPL'ENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1. PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB '1 1 FILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 R 1 1 FRATERNAL LITCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUl'RED: LTTR 9 'ENCL

E I

'L

FPL NAR13 1996 L-96-067 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the February 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Robert J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant yBOO54 e~OS1~0S71 Vao~ae PDR ADOCK 05000250 R PDR an FPL Group company

1 iP

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 3/ 7/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 696 1440 203697.6
12. NUMBER OF HOURS REACTOR 550.3 1294.3 138200.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LZNE 526.6 1270.6 136166.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 3%$ 768 2rSV227 2FK61246
17. GROSS ELECTRICAL ENERGY GENERATED (MWHj 323526 862310 91099295
18. NET ELECTRZCAL ENERGY GENERATED (MWH) 306886 821685 86235081
19. UNIT SERVICE FACTOR 75.7 88.2 66.8
20. UNIT AVAILABILITYFA 75.7 88.2 66.9
21. CAPACITY FACTOR (USING MD 66.2 85.7 64.5
22. CAPACITY FACTOR (USING DER NET) 63.6 82.3 61.1
23. UNIT FORCED OUTAGE RATE 24.3 11.8 11 '
24. SHUTDOWNS SCHEDULED OVER NONE
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

IP 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

ZL25Q.

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason'ethod of Event code'ause code'caponent System 4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 01 960201 0.0 N/A FILTERS GRASS fOULING Of INTAKE SCREENS/STRAI HERS 02 960201 0.0 N/A HH HTEXCH WATER BOX CLEANING 03 960201 0.0 N/A HB VALVEX TURBINE VALVE TEST 04 960209 53.5 LER 96- CC HTEXCH AUTO TRIP DUE TO HIGH S/G WATER 002 LEVEL 05 960212 0.0 N/A CH VALVEX FAILURE Of MAIN FEEDWATER PUMP CHECK VALVE 06 960216 83.5 N/A fI LTERS GRASS FOULING Of INTAKE SCREENS/STRAINERS 07 960219 32.4 NA RB INSTRU ROD CONTROL PROBLEMS

F - Forced Reason Method Exhibit 0 - Instructions Exhibit 1 - same Source S - Scheduled A - Equipment Failure 1 - Manual for preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 - Load Reduction License Examination 9 Other (Explain)

F C - Administrative Operational Error (Explain)

H Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96 317 02/02/96 371 02/03/96 685 02/04/96 699 02/05/96 709 02/06/96 707 02/07/96 702 02/08/96 686 02/09/96 604 02/10/96 0 02/11/96 0 02/12/96 246 02/13/96 379 02/14/96 384 02/15/96 371 02/16/96 58 02/17/96 0 02/18/96 0 02/19/96 0 02/20/96 0 02/21/96 383 02/22/96 683 02/23/96 686 02/24/96 687 02/25/96 687 02/26/96 686 02/27/96 686 02/28/96 686 02/29/96 686

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 began operation for the month at 60% reactor power. Power was reduced to 40% for a turbine valve test on February 2. Power was returned to 60% power for waterbox and heat exchanger cleaning on February 2 and taken to 100% power on February 3.

The unit remained at essentially 100% power until February 9. On February 9 power was reduced to 60% power for waterbox cleaning and testing of a main feed water pump discharge check valve.

During this testing an automatic reactor trip occurred on February 9 due to hi-hi steam generator water level, which is discussed in LER 96-002. The unit was restarted on February 11 and operated at approximately 60% during repair of the main feed water pump discharge check valve. On February 16 the unit was taken to Mode 3 due to a grass influx into the intake and remained off line until February 19. The unit was taken to Mode 2 on February 19 however returned to Mode 3 due to rod control problems. The unit was returned to power on February 21 and remained at essentially 100% power through the end of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/96 689 02/02/96 688 02/03/96 689 02/04/96 698 02/05/96 709 02/06/96 709 02/07/96 707 02/08/96 704 02/09/96 700 02/10/96 693 02/11/96 692 02/12/96 697 02/13/96 701 02/14/96 700 02/15/96 697 02/16/96 695 02/17/96 703 02/18/96 705 02/19/96 700 02/20/96 695 02/21/96 690 02/22/96 681 02/23/96 675 02/24/96 681 02/25/96 681 02/26/96 678 02/27/96 678 02/28/96 670 02/29/96 664

C OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 3/ 7/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: FEBRUARY 1996
3. LICENSED THERMAL POWER (MWT): 2200 4 . NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHL~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 696 1440 197429.0
12. NUMBER OF HOURS REACTOR 696.0 1440.0 134925.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 696.0 1440.0 130833.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 ST59845 YKE33102
17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 504313 1046564 88585705
18. NET ELECTRICAL ENERGY GENERATED (MWH) 481644 999512 83884427
19. UNIT SERVICE FACTOR 100.0 100.0 66.3
20. UNIT AVAILABILITYFA 100.0 100.0 66.6
21. CAPACITY FACTOR (USING MD 103.9 104.2 64.7
22. CAPACITY FACTOR (USING DER NET) 99.9 100.2 61.3
23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2
24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR MARCH 1996
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason Method of Event Systen Code Code'ause Conponent 4 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports N/A F - Forced Reason Method Exhibit 0 - Instructions Exhibit 1 - Sane Sourco S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 - Autonatic Scran Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG 0161)

E - Operator Training 4 5 - Load Reduction License Exan (nation 9 - Other (Explain)

F - Adninistratlve C - Operational Error (Explain)

H - Othor (Explain)

)

J

~ ~

DOCKET NO.

UNIT'ATE'EPORT MONTH Unit 4 operated at essentially 100% reactor power for the month.

A T,, coast down, due to fuel depletion, was begun at the end of the month in anticipation of the scheduled refueling shutdown on March 4.

.0 1 lt