ML17354A385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1996
| issue date = 12/31/1996
| title = Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr
| title = Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr
| author name = HOVEY R J, KNORR J E
| author name = Hovey R, Knorr J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE)1!ACCESSION NBR:9701170309 DOC'.DATE:
{{#Wiki_filter:CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM                 (RIDE) 1
96/12/31 NOTARIZED:
! ACCESSION NBR:9701170309             DOC'.DATE: 96/12/31     NOTARIZED: NO           DOCKET I FACIL:50<250. Turkey Point         Plant, Unit 3, Florida       Power and Light   C 05000250 50-251 Turkey Point         Plant, Unit 4, Florida       Power and Light   C 05000251 AUTH. NAME             AUTHOR AFFILIATION KNORR,J.E.             Florida Power 6 Light Co.
NO DOCKET I FACIL:50<250.
HOVEY,R.J.             Florida Power 6 Light Co.
Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.
RECIP.NAME             RECIPIENT AFFILIATION
Florida Power 6 Light Co.HOVEY,R.J.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME'PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R E CENTER 1 OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL LITCO BRYCE I J H NRC PDR 1 1 1 1 NOAC 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts for Dec 1996 for Turkey Points Units 3 a   4.W/970110     ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK/ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL ,'10 APL L-97-11 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A.Reyes, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant>'7005y 970ii7030'F 9b1231 PDR ADQCK 05000250 R PDR an FPL Group company AVERAGE DAIL IT POWER LEVEL MONIH December.1996 DOCKET NO.50-250 uNIT Turkey Point k3 DATE Jan 08.1997 COMPLETED 8Y J.E.Knorr TELEPHONE (305)246-6757 DAY AVE RAGE 12/01/96 12/02/96 12/03/96 12/04/96 12/05/96 12/06/96 12/07/96 12/08/96 12/09/96 12/10/96 12/11/96 12/12/96 12/13/96 12/14/96 12/15/96 12/16/96 12/17/96 12/18/96 12/19/96 12/20/96 12/21/96 12/22/96 12/23/96 12/24/96 12/25/96 12/26/96'2/27/96 12/28/96 12/29/96 12/30/96 12/31/96 DAILY POWER LEVEL (MWe-Net)724 719 715 714 715 712 710 712 725 731 728 720 717 715 719 723 721 720 720 730 735 731 727 724 720 717 711 710 708 721 709 OP ING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-250 01/08/97 J.E.Knorr (305)246-6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: December, 1996 3.UCENSED THERMAL POWER (MWD: 2300 4.NAMEPlATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 720 6.MAXIMUM Df PENDABLE CAPACllY (GROSS MWE): 726 7.MAXIMUM DEPENDABLE CAPACllY (NET MWE): 693 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE lAST REPORT.GIVE REASONS: 9.POWER LEVE L TO WHICH RESIICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION, IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENEPATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENEPATED (MWH)17.GROSS ELECTRICAL f NERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABIUlY FACTOR 21.CAPACflY FACTOR (USING MDC NET)22.CAPACllY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: RefueRng outage scheduled March 1997 MONTHLY 7449 744.0 0.0 744.0 0.0 1704245 559737 535188 100.0 100.0 1033 99.9 0.0-YTD-87849 8545.6 0.0 8491A 0.0 18542301 6031012 5746810 96.7 96.7 973 93.6 33 CUMUlATIVE 211041')1454515 844A 143387.1 12'I.S 299573320 96267997 91160206 67.9 689 62A 60.1 103 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL     SIZE:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
TITLE: Monthly Operating Report (per Tech Specs)
REPORT MONTH No.Date Duration (Hours)Reason Method of Shutting Down Reactora Licensee Event.Reports System code<nent Codes Cause C Corrective Action to Prevent Recurrence N/A 1 F-Forced S-Scheduled 2 Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training S License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit 1-Same Source
NOTES:
RECIPIENT           COPIES            RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME       LTTR ENCL
            'PD2-3 PD                   1    1      CROTEAU,R              1    1 INTERNAL: AEOD/SPD/RRAB                 1    1          E CENTER      1    1    1 NRR/DRPM/PECB               1   1       OC/DBA/PAD             1     1 RGN2                        1   1 EXTERNAL   LITCO BRYCE I J H           1   1       NOAC                    1   1 NRC PDR                    1   1 D
U N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/
ROOM OWFN   5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL   , '10
 
L-97-11 APL                                                  10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very   truly     yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant
            >'7005y 970ii7030'F 9b1231 PDR     ADQCK     05000250 R                     PDR an FPL Group company
 
AVERAGE DAIL       IT POWER LEVEL DOCKET NO. 50-250 uNIT         Turkey Point k3 DATE         Jan 08. 1997 COMPLETED 8Y J. E. Knorr TELEPHONE   (305) 246-6757 MONIH December. 1996 DAY               AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/96                   724 12/02/96                   719 12/03/96                   715 12/04/96                   714 12/05/96                   715 12/06/96                   712 12/07/96                   710 12/08/96                   712 12/09/96                   725 12/10/96                   731 12/11/96                   728 12/12/96                   720 12/13/96                   717 12/14/96                   715 12/15/96                   719 12/16/96                   723 12/17/96                   721 12/18/96                   720 12/19/96                   720 12/20/96                   730 12/21/96                   735 12/22/96                   731 12/23/96                   727 12/24/96                   724 12/25/96                   720 12/26/96                   717
                  '2/27/96 711 12/28/96                   710 12/29/96                   708 12/30/96                   721 12/31/96                   709
 
OP       ING DATA REPORT DOCKET NO                   50 - 250 DATE                      01/08/97 PREPARED BY              J. E. Knorr TELEPHONE            (305) 246-6757
: 1. UNIT NAME:       TURKEY POINT       UNIT 3
: 2. REPORTING PERIOD:     December, 1996
: 3. UCENSED THERMALPOWER      (MWD:                           2300
: 4. NAMEPlATE RATING (GROSS MWE):                             760
: 5. DESIGN ELECTRICAL RATING (NET MWE):                       720
: 6. MAXIMUMDfPENDABLE CAPACllY (GROSS MWE):                   726
: 7. MAXIMUMDEPENDABLE CAPACllY (NET MWE):                     693
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.
GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESIICTED, IF ANY (NET MWE)
: 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY            - YTD-      CUMUlATIVE
: 11. HOURS IN REPORT PERIOD:                                      7449          87849            211041')
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                         744.0        8545.6            1454515
: 13. REACTOR RESERVE SHUTDOWN HOURS                                 0.0            0.0              844A
: 14. HOURS GENEPATOR ON-LINE                                     744.0        8491A            143387.1
: 15. UNIT RESERVE SHUTDOWN HOURS                                   0.0            0.0              12'I.S
: 16. GROSS THERMAL ENERGY GENEPATED       (MWH)               1704245      18542301          299573320 f
: 17. GROSS ELECTRICAL NERGY GENERATED       (MWH)               559737        6031012            96267997
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                     535188        5746810            91160206
: 19. UNIT SERVICE FACTOR                                         100.0            96.7              67.9
: 20. UNIT AVAILABIUlY FACTOR                                     100.0            96.7              689
: 21. CAPACflYFACTOR ( USING MDC NET)                             1033            973                62A
: 22. CAPACllY FACTOR ( USING DER NET )                             99.9            93.6              60.1
: 23. UNIT FORCED OUTAGE RATE                                       0.0            33                103
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
RefueRng outage scheduled March 1997
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
UNIT   SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.       Date     Duration     Reason     Method of     Licensee System           nent         Cause C Corrective Action to (Hours)                Shutting        Event. code<      Codes              Prevent Recurrence Down        Reports Reactora N/A 1               2                          3                        4                        5 F Forced      Reason                        Method                  Exhibit G - Instructions  Exhibit  1  - Same  Source S Scheduled   A - Equipment Failure       1  Manual              for Preparation of  Data B - Maintenance or Test     2 - Manual Scram        Entry Sheets Licensee C - Refueling                 3 - Automatic Scram    Event Report (LER) File D - Regulatory               4 -  Continued          (NUREG-0161) restriction                   5 -  Load Reduction E Operator   Training S   9 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT:        Turke Point $ 3 DATE:        Januar 8 1997 COMPLETED BY: J. E. Knorr TELEPHONE:    (305) 246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100% reactor power through the month of December, 1996.
50-250 Turke Point$3 Januar 8 1997 J.E.Knorr (305)246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100%reactor power through the month of December, 1996.
 
AVERAGE DAIL'I IT POWER LEVEL MONTH December.1996 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 Turkey Point k4 Jan 08.1997 J.E.Knorr (305)246-6757 DAY 12/Ol/96 12/02/96 12/03/96 12/04/96 12/05/96 12/06/96 12/07/96 12/08/96 12/09/96 12/10/96 12/11/96 12/12/96 12/13/96 12/14/96 12/15/96 12/16/96 12/17/96 12/18/96 12/19/96 12/20/96 12/21/96 12/22/96 12/23/96 12/24/96 12/25/96 12/26/96 12/27/96 12/28/96 12/29/96 12/30/96 12/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net)724 721 716 716 718 714 710 711 724 730 726 722 718 715 716 720 720 721 722 733 737 733 729 726 723 719 714 714 713 726 713 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO~UNIT NAME'ATE: COMPLETED BY TELEPHONE'0-251 Turke Point$4 Januar 8, 1997 J.E.Knorr (305)246-6757 REPORT MONTH No.Date Duzation (Hours)Reason Method of Shutt,ing Down Reactor>Licensee Event Repoztt System Code<Co~nant Code>cause a Corrective Action to Prevent Recuzzence N/A 1 F-Forced S-Scheduled 2 Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit 1-Same Source
AVERAGE DAIL'I     IT POWER LEVEL DOCKET NO. 50-251 UNIT        Turkey Point k4 DATE        Jan 08. 1997 COMPLETED BY J. E. Knorr TELEPHONE    (305) 246-6757 MONTH    December. 1996 DAY       AVERAGE DAILY POWER LEVEL (MWe-Net) 12/Ol/96             724 12/02/96             721 12/03/96             716 12/04/96             716 12/05/96             718 12/06/96             714 12/07/96             710 12/08/96             711 12/09/96             724 12/10/96             730 12/11/96             726 12/12/96             722 12/13/96             718 12/14/96             715 12/15/96             716 12/16/96             720 12/17/96             720 12/18/96             721 12/19/96             722 12/20/96             733 12/21/96             737 12/22/96             733 12/23/96             729 12/24/96             726 12/25/96             723 12/26/96             719 12/27/96             714 12/28/96             714 12/29/96             713 12/30/96             726 12/31/96             713
*~OP ING DATA REPORT DOCKET NO DATE PAEPAAED BY TELEPHONE 50-251 01/08/97 J.E.Knorr (305)246-6757 l.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: December, 1996 3.UCENSED THERMAL POWER (MW): 2300 4.NAMEPLATE PATING (GROSS MWE): 760 5.DESIGN ELECTRICAL PATING (NET MWE): 720 6.MAXIMUM DEPENDABLE CAPACIlY (GROSS MWE): 726 7.MAXIMUM DEPENDABLE CAPACIIY (NET MWE): 693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE lAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED.
 
IF ANY (NET MWE)10.AESONS FOP RESTRICTION.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO           ~
IF ANY: 11.HOUAS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT AESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS f LECTRICAL ENERGY Gf NERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILIIY FACTOR 21.CAPACIIY FACTOR (USING MDC NET)22.CAPACIIY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 7440 7440 0.0 744.0 0.0 1708644 560873 536230 100.0 100.0 104.0 100.1 0.0-YTD-87840 79672 0.0 7772.8 0.0 16869311 5425732 5164163 885 885 87.7 843 03 CUMULATIVE 2047738)1414530 166.6 137166.0 5772 290542568 92964873 88053578 67.0 673 62.1 59.8 9.8 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT                       Turke Point $ 4 Januar 8, 1997 NAME'ATE:
K~,.~0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO.UNIT'ATE: COMPLETE BY: TELEPHONE:
TELEPHONE'0-251 COMPLETED BY J. E. Knorr (305) 246-6757 REPORT MONTH No.         Date     Duzation     Reason     Method   of     Licensee System       Co~nant                 cause   a Corrective Action to (Hours)                Shutt,ing      Event    Code<        Code>                      Prevent Recuzzence Down        Repoztt Reactor>
50-251 Turke Point$4 Januar 8, 1997 J.E.Knorr (305)246-6757 REPORT MONTH December 1996 Unit 4 operated at approximately 100%reactor power through the month of December 1996.  
N/A 1                 2                          3                                                          5 F - Forced       Reason                        Method                  Exhibit G - Instructions          Exhibit  1  -  Same  Source S - Scheduled   A - Equipment Failure       1  Manual              for Preparation of Data B - Maintenance or Test       2  Manual Scram        Entry Sheets Licensee C - Refueling                 3  Automatic Scram    Event Report (LER)  File D - Regulatory               4 -  Continued          (NUREG-0161) restriction                   5 -  Load Reduction E Operator Training   6   9 -  Other (Explain)
~~I}}
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
            ~
OP     ING DATA REPORT DOCKET NO                       50 -251 DATE                          01/08/97 PAEPAAED BY                  J. E. Knorr TELEPHONE                (305) 246-6757
: l. UNIT NAME:         TURKEY POINT     UNIT 4
: 2. REPORTING PERIOD:       December, 1996
: 3. UCENSED THERMALPOWER        (MW):                         2300
: 4. NAMEPLATE PATING (GROSS MWE):                             760
: 5. DESIGN ELECTRICAL PATING (NET MWE):                       720
: 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE):                     726
: 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE):                       693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS ( ITEMS NUMBER 3 THROUGH 7   ) SINCE lAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE)
: 10. AESONS FOP RESTRICTION. IF ANY:
MONTHLY              - YTD-      CUMULATIVE
: 11. HOUAS IN REPORT PERIOD:                                      7440            87840            2047738)
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                         7440            79672            1414530
: 13. REACTOR RESERVE SHUTDOWN HOURS                                 0.0                0.0              166.6
: 14. HOURS GENERATOR ON-UNE                                       744.0            7772.8          137166.0
: 15. UNIT AESERVE SHUTDOWN HOURS                                   0.0                0.0              5772
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                     1708644          16869311          290542568
: 17. GROSS     fLECTRICAL ENERGY GfNERATED (MWH)               560873          5425732          92964873
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                     536230          5164163          88053578
: 19. UNIT SERVICE FACTOR                                         100.0              885                67.0
: 20. UNIT AVAILABILIIY FACTOR                                   100.0              885                673
: 21. CAPACIIY FACTOR ( USING MDC NET)                             104.0              87.7              62.1
: 22. CAPACIIY FACTOR     ( USING DER NET)                       100.1              843                59.8
: 23. UNIT FORCED OUTAGE RATE                                       0.0                03                9.8
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
~,.
K
                          ~                               0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO.     50-251 UNIT'ATE:
Turke Point $ 4 Januar 8, 1997 COMPLETE BY:    J. E. Knorr TELEPHONE:      (305) 246-6757 REPORT MONTH   December   1996 Unit 4 operated at approximately 100%   reactor power through the month of December 1996.
 
~ ~ I}}

Latest revision as of 21:17, 3 February 2020

Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr
ML17354A385
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-11, NUDOCS 9701170309
Download: ML17354A385 (11)


Text

CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE) 1

! ACCESSION NBR:9701170309 DOC'.DATE: 96/12/31 NOTARIZED: NO DOCKET I FACIL:50<250. Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

'PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL , '10

L-97-11 APL 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

>'7005y 970ii7030'F 9b1231 PDR ADQCK 05000250 R PDR an FPL Group company

AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-250 uNIT Turkey Point k3 DATE Jan 08. 1997 COMPLETED 8Y J. E. Knorr TELEPHONE (305) 246-6757 MONIH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/96 724 12/02/96 719 12/03/96 715 12/04/96 714 12/05/96 715 12/06/96 712 12/07/96 710 12/08/96 712 12/09/96 725 12/10/96 731 12/11/96 728 12/12/96 720 12/13/96 717 12/14/96 715 12/15/96 719 12/16/96 723 12/17/96 721 12/18/96 720 12/19/96 720 12/20/96 730 12/21/96 735 12/22/96 731 12/23/96 727 12/24/96 724 12/25/96 720 12/26/96 717

'2/27/96 711 12/28/96 710 12/29/96 708 12/30/96 721 12/31/96 709

OP ING DATA REPORT DOCKET NO 50 - 250 DATE 01/08/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: December, 1996
3. UCENSED THERMALPOWER (MWD: 2300
4. NAMEPlATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 720
6. MAXIMUMDfPENDABLE CAPACllY (GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACllY (NET MWE): 693
8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.

GIVE REASONS:

9. POWER LEVEL TO WHICH RESIICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMUlATIVE

11. HOURS IN REPORT PERIOD: 7449 87849 211041')
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8545.6 1454515
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844A
14. HOURS GENEPATOR ON-LINE 744.0 8491A 143387.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 12'I.S
16. GROSS THERMAL ENERGY GENEPATED (MWH) 1704245 18542301 299573320 f
17. GROSS ELECTRICAL NERGY GENERATED (MWH) 559737 6031012 96267997
18. NET ELECTRICAL ENERGY GENERATED (MWH) 535188 5746810 91160206
19. UNIT SERVICE FACTOR 100.0 96.7 67.9
20. UNIT AVAILABIUlY FACTOR 100.0 96.7 689
21. CAPACflYFACTOR ( USING MDC NET) 1033 973 62A
22. CAPACllY FACTOR ( USING DER NET ) 99.9 93.6 60.1
23. UNIT FORCED OUTAGE RATE 0.0 33 103
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

RefueRng outage scheduled March 1997

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Duration Reason Method of Licensee System nent Cause C Corrective Action to (Hours) Shutting Event. code< Codes Prevent Recurrence Down Reports Reactora N/A 1 2 3 4 5 F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training S 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point $ 3 DATE: Januar 8 1997 COMPLETED BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100% reactor power through the month of December, 1996.

AVERAGE DAIL'I IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point k4 DATE Jan 08. 1997 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/Ol/96 724 12/02/96 721 12/03/96 716 12/04/96 716 12/05/96 718 12/06/96 714 12/07/96 710 12/08/96 711 12/09/96 724 12/10/96 730 12/11/96 726 12/12/96 722 12/13/96 718 12/14/96 715 12/15/96 716 12/16/96 720 12/17/96 720 12/18/96 721 12/19/96 722 12/20/96 733 12/21/96 737 12/22/96 733 12/23/96 729 12/24/96 726 12/25/96 723 12/26/96 719 12/27/96 714 12/28/96 714 12/29/96 713 12/30/96 726 12/31/96 713

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~

UNIT Turke Point $ 4 Januar 8, 1997 NAME'ATE:

TELEPHONE'0-251 COMPLETED BY J. E. Knorr (305) 246-6757 REPORT MONTH No. Date Duzation Reason Method of Licensee System Co~nant cause a Corrective Action to (Hours) Shutt,ing Event Code< Code> Prevent Recuzzence Down Repoztt Reactor>

N/A 1 2 3 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 Manual Scram Entry Sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training 6 9 - Other (Explain)

License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~

OP ING DATA REPORT DOCKET NO 50 -251 DATE 01/08/97 PAEPAAED BY J. E. Knorr TELEPHONE (305) 246-6757

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: December, 1996
3. UCENSED THERMALPOWER (MW): 2300
4. NAMEPLATE PATING (GROSS MWE): 760
5. DESIGN ELECTRICAL PATING (NET MWE): 720
6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 726
7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE)
10. AESONS FOP RESTRICTION. IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOUAS IN REPORT PERIOD: 7440 87840 2047738)
12. NUMBER OF HOURS REACTOR WAS CRITICAL 7440 79672 1414530
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-UNE 744.0 7772.8 137166.0
15. UNIT AESERVE SHUTDOWN HOURS 0.0 0.0 5772
16. GROSS THERMAL ENERGY GENERATED (MWH) 1708644 16869311 290542568
17. GROSS fLECTRICAL ENERGY GfNERATED (MWH) 560873 5425732 92964873
18. NET ELECTRICAL ENERGY GENERATED (MWH) 536230 5164163 88053578
19. UNIT SERVICE FACTOR 100.0 885 67.0
20. UNIT AVAILABILIIY FACTOR 100.0 885 673
21. CAPACIIY FACTOR ( USING MDC NET) 104.0 87.7 62.1
22. CAPACIIY FACTOR ( USING DER NET) 100.1 843 59.8
23. UNIT FORCED OUTAGE RATE 0.0 03 9.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~,.

K

~ 0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:

Turke Point $ 4 Januar 8, 1997 COMPLETE BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 4 operated at approximately 100% reactor power through the month of December 1996.

~ ~ I