ML17354A385: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/31/1996 | | issue date = 12/31/1996 | ||
| title = Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr | | title = Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr | ||
| author name = | | author name = Hovey R, Knorr J | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE)1!ACCESSION NBR:9701170309 DOC'.DATE: | {{#Wiki_filter:CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE) 1 | ||
96/12/31 NOTARIZED: | ! ACCESSION NBR:9701170309 DOC'.DATE: 96/12/31 NOTARIZED: NO DOCKET I FACIL:50<250. Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co. | ||
NO DOCKET I FACIL:50<250. | HOVEY,R.J. Florida Power 6 Light Co. | ||
Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. | RECIP.NAME RECIPIENT AFFILIATION | ||
Florida Power 6 Light Co.HOVEY,R.J. | |||
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME'PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB | Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr. | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK/ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL ,'10 | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE: | TITLE: Monthly Operating Report (per Tech Specs) | ||
REPORT MONTH No.Date Duration | NOTES: | ||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL | |||
'PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D | |||
U N | |||
NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/ | |||
ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL , '10 | |||
L-97-11 APL 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | |||
Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant | |||
>'7005y 970ii7030'F 9b1231 PDR ADQCK 05000250 R PDR an FPL Group company | |||
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-250 uNIT Turkey Point k3 DATE Jan 08. 1997 COMPLETED 8Y J. E. Knorr TELEPHONE (305) 246-6757 MONIH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/96 724 12/02/96 719 12/03/96 715 12/04/96 714 12/05/96 715 12/06/96 712 12/07/96 710 12/08/96 712 12/09/96 725 12/10/96 731 12/11/96 728 12/12/96 720 12/13/96 717 12/14/96 715 12/15/96 719 12/16/96 723 12/17/96 721 12/18/96 720 12/19/96 720 12/20/96 730 12/21/96 735 12/22/96 731 12/23/96 727 12/24/96 724 12/25/96 720 12/26/96 717 | |||
'2/27/96 711 12/28/96 710 12/29/96 708 12/30/96 721 12/31/96 709 | |||
OP ING DATA REPORT DOCKET NO 50 - 250 DATE 01/08/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757 | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: December, 1996 | |||
: 3. UCENSED THERMALPOWER (MWD: 2300 | |||
: 4. NAMEPlATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 720 | |||
: 6. MAXIMUMDfPENDABLE CAPACllY (GROSS MWE): 726 | |||
: 7. MAXIMUMDEPENDABLE CAPACllY (NET MWE): 693 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT. | |||
GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESIICTED, IF ANY (NET MWE) | |||
: 10. RESONS FOR RESTRICTION, IF ANY: | |||
MONTHLY - YTD- CUMUlATIVE | |||
: 11. HOURS IN REPORT PERIOD: 7449 87849 211041') | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8545.6 1454515 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844A | |||
: 14. HOURS GENEPATOR ON-LINE 744.0 8491A 143387.1 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 12'I.S | |||
: 16. GROSS THERMAL ENERGY GENEPATED (MWH) 1704245 18542301 299573320 f | |||
: 17. GROSS ELECTRICAL NERGY GENERATED (MWH) 559737 6031012 96267997 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 535188 5746810 91160206 | |||
: 19. UNIT SERVICE FACTOR 100.0 96.7 67.9 | |||
: 20. UNIT AVAILABIUlY FACTOR 100.0 96.7 689 | |||
: 21. CAPACflYFACTOR ( USING MDC NET) 1033 973 62A | |||
: 22. CAPACllY FACTOR ( USING DER NET ) 99.9 93.6 60.1 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 33 103 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: | |||
RefueRng outage scheduled March 1997 | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
UNIT NAME: | |||
DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
REPORT MONTH No. Date Duration Reason Method of Licensee System nent Cause C Corrective Action to (Hours) Shutting Event. code< Codes Prevent Recurrence Down Reports Reactora N/A 1 2 3 4 5 F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training S 9 - Other (Explain) | |||
License Examination F - Administrative G - Operational Error (Explain) | |||
H - Other (Explain) | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO. | OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point $ 3 DATE: Januar 8 1997 COMPLETED BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100% reactor power through the month of December, 1996. | ||
50-250 Turke Point$3 Januar 8 1997 J.E.Knorr (305)246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100%reactor power through the month of December, 1996. | |||
AVERAGE DAIL'I IT POWER LEVEL | AVERAGE DAIL'I IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point k4 DATE Jan 08. 1997 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/Ol/96 724 12/02/96 721 12/03/96 716 12/04/96 716 12/05/96 718 12/06/96 714 12/07/96 710 12/08/96 711 12/09/96 724 12/10/96 730 12/11/96 726 12/12/96 722 12/13/96 718 12/14/96 715 12/15/96 716 12/16/96 720 12/17/96 720 12/18/96 721 12/19/96 722 12/20/96 733 12/21/96 737 12/22/96 733 12/23/96 729 12/24/96 726 12/25/96 723 12/26/96 719 12/27/96 714 12/28/96 714 12/29/96 713 12/30/96 726 12/31/96 713 | ||
IF ANY (NET MWE)10.AESONS FOP RESTRICTION. | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~ | ||
IF ANY: 11.HOUAS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT AESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS | UNIT Turke Point $ 4 Januar 8, 1997 NAME'ATE: | ||
TELEPHONE'0-251 COMPLETED BY J. E. Knorr (305) 246-6757 REPORT MONTH No. Date Duzation Reason Method of Licensee System Co~nant cause a Corrective Action to (Hours) Shutt,ing Event Code< Code> Prevent Recuzzence Down Repoztt Reactor> | |||
N/A 1 2 3 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 Manual Scram Entry Sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training 6 9 - Other (Explain) | |||
~~I}} | License Examination F - Administrative G - Operational Error (Explain) | ||
H - Other (Explain) | |||
~ | |||
OP ING DATA REPORT DOCKET NO 50 -251 DATE 01/08/97 PAEPAAED BY J. E. Knorr TELEPHONE (305) 246-6757 | |||
: l. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD: December, 1996 | |||
: 3. UCENSED THERMALPOWER (MW): 2300 | |||
: 4. NAMEPLATE PATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL PATING (NET MWE): 720 | |||
: 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 726 | |||
: 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE) | |||
: 10. AESONS FOP RESTRICTION. IF ANY: | |||
MONTHLY - YTD- CUMULATIVE | |||
: 11. HOUAS IN REPORT PERIOD: 7440 87840 2047738) | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7440 79672 1414530 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6 | |||
: 14. HOURS GENERATOR ON-UNE 744.0 7772.8 137166.0 | |||
: 15. UNIT AESERVE SHUTDOWN HOURS 0.0 0.0 5772 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1708644 16869311 290542568 | |||
: 17. GROSS fLECTRICAL ENERGY GfNERATED (MWH) 560873 5425732 92964873 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 536230 5164163 88053578 | |||
: 19. UNIT SERVICE FACTOR 100.0 885 67.0 | |||
: 20. UNIT AVAILABILIIY FACTOR 100.0 885 673 | |||
: 21. CAPACIIY FACTOR ( USING MDC NET) 104.0 87.7 62.1 | |||
: 22. CAPACIIY FACTOR ( USING DER NET) 100.1 843 59.8 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 03 9.8 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: | |||
None | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
~,. | |||
K | |||
~ 0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE: | |||
Turke Point $ 4 Januar 8, 1997 COMPLETE BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 4 operated at approximately 100% reactor power through the month of December 1996. | |||
~ ~ I}} |
Latest revision as of 21:17, 3 February 2020
ML17354A385 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 12/31/1996 |
From: | Hovey R, Knorr J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-97-11, NUDOCS 9701170309 | |
Download: ML17354A385 (11) | |
Text
CATEGORY 1 REGULATE INFORMATION DISTRIBUTIOSTEM (RIDE) 1
! ACCESSION NBR:9701170309 DOC'.DATE: 96/12/31 NOTARIZED: NO DOCKET I FACIL:50<250. Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.
HOVEY,R.J. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Dec 1996 for Turkey Points Units 3 a 4.W/970110 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL
'PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D
U N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/
ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL , '10
L-97-11 APL 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc:Luis A. Reyes, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant
>'7005y 970ii7030'F 9b1231 PDR ADQCK 05000250 R PDR an FPL Group company
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-250 uNIT Turkey Point k3 DATE Jan 08. 1997 COMPLETED 8Y J. E. Knorr TELEPHONE (305) 246-6757 MONIH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/96 724 12/02/96 719 12/03/96 715 12/04/96 714 12/05/96 715 12/06/96 712 12/07/96 710 12/08/96 712 12/09/96 725 12/10/96 731 12/11/96 728 12/12/96 720 12/13/96 717 12/14/96 715 12/15/96 719 12/16/96 723 12/17/96 721 12/18/96 720 12/19/96 720 12/20/96 730 12/21/96 735 12/22/96 731 12/23/96 727 12/24/96 724 12/25/96 720 12/26/96 717
'2/27/96 711 12/28/96 710 12/29/96 708 12/30/96 721 12/31/96 709
OP ING DATA REPORT DOCKET NO 50 - 250 DATE 01/08/97 PREPARED BY J. E. Knorr TELEPHONE (305) 246-6757
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: December, 1996
- 3. UCENSED THERMALPOWER (MWD: 2300
- 4. NAMEPlATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 720
- 6. MAXIMUMDfPENDABLE CAPACllY (GROSS MWE): 726
- 7. MAXIMUMDEPENDABLE CAPACllY (NET MWE): 693
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.
GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESIICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMUlATIVE
- 11. HOURS IN REPORT PERIOD: 7449 87849 211041')
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8545.6 1454515
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844A
- 14. HOURS GENEPATOR ON-LINE 744.0 8491A 143387.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 12'I.S
- 16. GROSS THERMAL ENERGY GENEPATED (MWH) 1704245 18542301 299573320 f
- 17. GROSS ELECTRICAL NERGY GENERATED (MWH) 559737 6031012 96267997
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 535188 5746810 91160206
- 19. UNIT SERVICE FACTOR 100.0 96.7 67.9
- 20. UNIT AVAILABIUlY FACTOR 100.0 96.7 689
- 21. CAPACflYFACTOR ( USING MDC NET) 1033 973 62A
- 22. CAPACllY FACTOR ( USING DER NET ) 99.9 93.6 60.1
- 23. UNIT FORCED OUTAGE RATE 0.0 33 103
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
RefueRng outage scheduled March 1997
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No. Date Duration Reason Method of Licensee System nent Cause C Corrective Action to (Hours) Shutting Event. code< Codes Prevent Recurrence Down Reports Reactora N/A 1 2 3 4 5 F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training S 9 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point $ 3 DATE: Januar 8 1997 COMPLETED BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 3 operated at approximately 100% reactor power through the month of December, 1996.
AVERAGE DAIL'I IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point k4 DATE Jan 08. 1997 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONTH December. 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/Ol/96 724 12/02/96 721 12/03/96 716 12/04/96 716 12/05/96 718 12/06/96 714 12/07/96 710 12/08/96 711 12/09/96 724 12/10/96 730 12/11/96 726 12/12/96 722 12/13/96 718 12/14/96 715 12/15/96 716 12/16/96 720 12/17/96 720 12/18/96 721 12/19/96 722 12/20/96 733 12/21/96 737 12/22/96 733 12/23/96 729 12/24/96 726 12/25/96 723 12/26/96 719 12/27/96 714 12/28/96 714 12/29/96 713 12/30/96 726 12/31/96 713
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~
UNIT Turke Point $ 4 Januar 8, 1997 NAME'ATE:
TELEPHONE'0-251 COMPLETED BY J. E. Knorr (305) 246-6757 REPORT MONTH No. Date Duzation Reason Method of Licensee System Co~nant cause a Corrective Action to (Hours) Shutt,ing Event Code< Code> Prevent Recuzzence Down Repoztt Reactor>
N/A 1 2 3 5 F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 Manual Scram Entry Sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory 4 - Continued (NUREG-0161) restriction 5 - Load Reduction E Operator Training 6 9 - Other (Explain)
License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
~
OP ING DATA REPORT DOCKET NO 50 -251 DATE 01/08/97 PAEPAAED BY J. E. Knorr TELEPHONE (305) 246-6757
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: December, 1996
- 3. UCENSED THERMALPOWER (MW): 2300
- 4. NAMEPLATE PATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL PATING (NET MWE): 720
- 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 726
- 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 693 8, IF CHANGES OCCUR IN CAPACIlY PATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY(NET MWE)
- 10. AESONS FOP RESTRICTION. IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOUAS IN REPORT PERIOD: 7440 87840 2047738)
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7440 79672 1414530
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-UNE 744.0 7772.8 137166.0
- 15. UNIT AESERVE SHUTDOWN HOURS 0.0 0.0 5772
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1708644 16869311 290542568
- 17. GROSS fLECTRICAL ENERGY GfNERATED (MWH) 560873 5425732 92964873
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 536230 5164163 88053578
- 19. UNIT SERVICE FACTOR 100.0 885 67.0
- 20. UNIT AVAILABILIIY FACTOR 100.0 885 673
- 21. CAPACIIY FACTOR ( USING MDC NET) 104.0 87.7 62.1
- 22. CAPACIIY FACTOR ( USING DER NET) 100.1 843 59.8
- 23. UNIT FORCED OUTAGE RATE 0.0 03 9.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
~,.
K
~ 0 SUMhGGtY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:
Turke Point $ 4 Januar 8, 1997 COMPLETE BY: J. E. Knorr TELEPHONE: (305) 246-6757 REPORT MONTH December 1996 Unit 4 operated at approximately 100% reactor power through the month of December 1996.
~ ~ I