| number = ML20133G680
| number = ML20133G680
| issue date = 07/19/1985
| issue date = 07/19/1985
| title = Forwards Safety Insp Repts 50-245/85-14 & 50-336/85-21 on 850513-0629.No Violation Noted.Ltrs Dtd 850528 & 31 Received & Reviewed
| title = Forwards Safety Insp Repts 50-245/85-14 & 50-336/85-21 on 850513-0629.No Violation Noted.Ltrs & 31 Received & Reviewed
| author name = Wenzinger E
| author name = Wenzinger E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8508090034
| document report number = NUDOCS 8508090034
| title reference date = 05-28-1985
| package number = ML20133G683
| package number = ML20133G683
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 00:31, 10 August 2022

Forwards Safety Insp Repts 50-245/85-14 & 50-336/85-21 on 850513-0629.No Violation Noted.Ltrs & 31 Received & Reviewed
ML20133G680
Person / Time
Site: Millstone, Hatch  Dominion icon.png
Issue date: 07/19/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133G683 List:
References
NUDOCS 8508090034
Download: ML20133G680 (2)


See also: IR 05000245/1985014

Text

- ;4

JUL 101985

Docket Nos. 50-245; 50-336

Northeast Nuclear Energy Company

ATTN: Mr. John F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

Post Office Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection 50-245/85-14; 50-336/85-21 (5/13/85-6/29/85)

This routine safety inspection was of operational and supporting activities at

Millstone Units 1 and 2. Particular attention was directed to Unit 2 refueling

outage activities. No violations of NRC requirements were identified, and no reply

to this letter is required.

The following Northeast Utilities letters on issues identified during NRC inspec-

tions have been received and reviewed. Additional NRC followup will occur during

routine inspections, but we have no questions at this time.

--

May 28, 1985 letter concerning the deviation from ASME B&PV Code requirements

for reactor coolant system piping inspections at Unit 2.

--

May 31, 1985 letter concerning the failure to follow station procedures for

local leak rate testing at Unit 2.

Your cooperation with us is appreciated.

Sincerely,

l Or3ginal Signed Btt

Edward C. Wenzinger, Chief

Projects Branch No. 3

,

Division of Reactor Projects

i. Enclosure: NRC Region I Inspection Report 50-245/85-14; 50-336/85-21

!

l

1

0FFICI AL RECORD COPY

- - . ~ _ . . _ . . . . . _

8508090034 850719 / -gQ/ $

i

'

PDR

O

ADOCK 05000245

PDR

/

I

L

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________ ____ ____ _ - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _______-_ _ _ _

..

.. <*

.

Northeast Nuclear Energy Company 2

JUL 191985

cc w/ enc 1:

E.J. Mroczka, Vice President, Nuclear Operations

W.D. Romberg, Station Superintendent

D.0. Nordquist, Manager of Quality Assurance

R.T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of-Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

Director DRS

Director DRS&S

DRP Section Chief

W. Kane (for Event.V)

RI:DRP RI:DRP R

@ik &

Shediosky/meo McCabe We zin'ger'

7/.3B/85 7 118

}

0FFICIAL'RE'ORD

C

C

(*)

COPY

_.-