| title = Forwards Safety Insp Repts 50-245/85-14 & 50-336/85-21 on 850513-0629.No Violation Noted.Ltrs | | title = Forwards Safety Insp Repts 50-245/85-14 & 50-336/85-21 on 850513-0629.No Violation Noted.Ltrs & 31 Received & Reviewed | ||
| author name = Wenzinger E | | author name = Wenzinger E | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8508090034 | | document report number = NUDOCS 8508090034 | ||
| title reference date = 05-28-1985 | |||
| package number = ML20133G683 | | package number = ML20133G683 | ||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
Latest revision as of 00:31, 10 August 2022
ML20133G680 | |
Person / Time | |
---|---|
Site: | Millstone, Hatch |
Issue date: | 07/19/1985 |
From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
Shared Package | |
ML20133G683 | List: |
References | |
NUDOCS 8508090034 | |
Download: ML20133G680 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217D2901999-10-13013 October 1999 Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls 1999-09-30 Category:NRC TO UTILITY MONTHYEARML20062G6171990-11-19019 November 1990
[Table view]Forwards Insp Repts 50-321/90-22 & 50-366/90-22 on 901015- 19.No Violations or Deviations Noted ML20062F4991990-11-16016 November 1990 Forwards List of Unimplemented GSIs at Facilities,Per Generic Ltr 90-04.Timely Completion Requested ML20062G2441990-11-16016 November 1990 Forwards Combined Insp Repts 50-245/90-23,50-336/90-25 & 50-423/90-23 on 901001-05.No Violations Noted ML20217A6661990-11-15015 November 1990 Requests Addl Info Concerning Boraflex Degradation in Millstone 2 Spent Fuel Pool Storage Racks to Support Review of Util 901001 Submittal.Info Re Gamma Doses to Boraflex Matl During Blackness Testing & Storage Patterns Requested ML20058J1111990-11-14014 November 1990 Forwards Safety Insp Rept 50-423/90-19 on 900905-1015 & Notice of Violation ML20062F8171990-11-14014 November 1990 Forwards Insp Repts 50-321/90-20 & 50-366/90-20 on 900915- 1020 & Notice of Violation ML20058H8421990-11-13013 November 1990 Forwards Insp Repts 50-321/90-21 & 50-366/90-21 on 901001- 05.No Violations or Deviations Noted ML20217A2921990-11-13013 November 1990 Advises That Kn Jabbour Assigned as Project Manager for Plant ML20217A2021990-11-0909 November 1990 Forwards Insp Repts 50-213/90-83,50-245/90-82 & 50-336/90-82 & 50-423/90-83 on 900924-28.No Violations Noted ML20217A7441990-11-0707 November 1990 Forwards Insp Repts 50-321/90-16 & 50-366/90-16 on 901001-12.No Violations or Deviations Noted ML20217A0821990-11-0505 November 1990 Forwards Safety Insp Rept 50-336/90-18 on 900822-1001 & Notices of Violation & Deviation ML20058F7061990-11-0101 November 1990 Forwards Amend 47 to License DPR-21 & Safety Evaluation. Amend Deletes Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 from Tech Spec 1.0.X ML20062D5441990-10-30030 October 1990 Confirms 901018 Telcon Re Possible Unanalyzed Condition Re Repairs for Steam Generator Tube Plugs in Mar 1989 ML20058C3761990-10-30030 October 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $25,000 for Violations Re Main Steam Line High Flow Setpoints & Gas Turbine Generator Surveillance Testing ML20058G3421990-10-29029 October 1990 Forwards Exam Rept 50-245/90-10OL Administered During Wk of 900827 ML20058E6201990-10-26026 October 1990 Forwards Safety Insp Repts 50-245/90-19,50-336/90-21 & 50-423/90-17 on 900904-07.No Violations Noted ML20058E5871990-10-26026 October 1990 Discusses Programmed Enhancements for Generic Ltr 88-17, Loss of Dhr ML20058G6121990-10-25025 October 1990 Advises That 900926 Response to Station Blackout Evaluation Acceptable,Based on Installation of Alternate Ac Prior to Startup ML20058E0931990-10-25025 October 1990 Advises That Schedule for Installation of Alternate Ac Acceptable,Per 900925 Response to Station Blackout Rule ML20058D5601990-10-24024 October 1990 Forwards Team Insps 50-213/90-82,50-245/90-81,50-336/90-81 & 50-423/90-82 on 901001-12 ML20062C7041990-10-24024 October 1990 Forwards Environ Assessment & Finding of No Significant Impact Re 900418 Request from Section IV.F.3 of App E to 10CFR50,Section IV.F.3 ML20058G0151990-10-23023 October 1990 Forwards Exemption to 10CFR50,App E,Section IV.F.3 Re Conduct of Full Participation Emergency Exercise,Per 900418 & 0801 Ltrs ML20058E8491990-10-23023 October 1990 Forwards Insp Repts 50-321/90-19 & 50-366/90-19 on 900925-28.No Violations or Deviations Noted IR 05000336/19900271990-10-17017 October 1990 Forwards Operator Exam Rept 50-336/90-27OL on 901003.Exam Results:Operator Passed Retake Exam ML20058A9791990-10-17017 October 1990 Forwards Insp Rept 50-336/90-19 on 900910-14.No Violations Noted ML20058B3181990-10-17017 October 1990 Ack Receipt of Forwarding Payment of Civil Penalty in Amount of $50,000.Penalty Not Mitigated ML20058E0661990-10-16016 October 1990 Forwards SE Granting 900926 Request for Relief from ASME Code Inservice Insp Requirements to Repair Svc Water Sys ML20062B8831990-10-12012 October 1990 Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support ML20062B2461990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML20062B8751990-10-12012 October 1990 Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support ML20059N4061990-10-0303 October 1990 Forwards Safety Evaluation Accepting pressure-temp Limits Re Generic Ltr 88-11.Current pressure-temp Limits for Heatup, Cooldown,Leak Test & Criticality of RCS Acceptable ML20059N9681990-10-0303 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-245/90-16,50-336/90-17 & 50-423/90-16 on 900827-31 & Notice of Violation ML20059N3291990-10-0202 October 1990 Forwards Response to Comments Contained in Util Re Installation of Hardened Wetwell Vent IR 05000336/19900091990-10-0101 October 1990 Ack Receipt of 900727 & 0907 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-336/90-09. Actions Will Be Examined During Future Insps ML20059M1471990-09-27027 September 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $50,000 Proposed by NRC .Corrective Actions Will Be Examined During Future Insps ML20059M0471990-09-14014 September 1990 Advises That NRC Does Not See Need for Formal Relief from ASME Code Section XI to Repair Leak in Svc Water Piping ML20059J8621990-09-12012 September 1990 Grants 900911 Request for Temporary Waiver of Compliance from Tech Spec Table 3.2.2 Re Containment Spray Interlock ML20059J7621990-09-12012 September 1990 Forwards Amend 45 to License DPR-21 & Safety Evaluation. Amend Changes Tech Spec Section 3/4.5.C by Adding Operability & Surveillance Requirements for Mods Made to Tie Breakers 14A to 14G ML20059J9151990-09-0707 September 1990 Forwards Guidance for Reporting of Events Under Requirements of 10CFR50.73.W/o Encl ML20059F3301990-08-29029 August 1990 Forwards Safety Evaluation Accepting Util 890417,0530 & 900330 Responses Concerning Method of Dealing W/Station Blackout Provided Util Make Mods,Procedure Changes & Calculations Discussed.Technical Evaluation Rept Also Encl ML20059C8261990-08-28028 August 1990 Forwards Safety Insp Repts 50-245/90-11,50-336/90-12 & 50-423/90-09 on 900611-15 & 25-29.No Violations Noted ML20059D7281990-08-27027 August 1990 Requests Listed Ref Matls Needed for Senior Reactor Operator Licensing Exams Scheduled for Wk of 901112.Completed License Applications Required 30 Days Before Exam Date ML20059E2201990-08-24024 August 1990 Forwards Radiological Controls Insp Repts 50-245/90-14, 50-336/90-15 & 50-423/90-13 on 900723-27.One Noncited Violation Identified ML20059D7341990-08-23023 August 1990 Forwards Safety Insp Rept 50-423/90-10 on 900612-0723 & Notice of Violation.Util Should Respond to Violation Re Inaccurate Statement in LER 90-013 Concerning Rev of Procedure by Following Instructions in Encl App a ML20059J8481990-08-16016 August 1990 Forwards Training Effectiveness Team Insp Rept 50-423/90-06 on 900604-08.Training Programs Well Implemented & Personnel Effectively Trained.Few Weaknesses Identified ML20058M7711990-08-0909 August 1990 Requests Addl Info Re License Amend Application Under Generic Ltr 87-09 for Facility.Affirms That Remedial Measures Prescribed for Affected Action Statements Consistent W/Updated SAR & Supporting Safety Analysis ML20058M3561990-08-0808 August 1990 Discusses Util Response to Generic Ltr 89-10, Safety- Related Motor-Operated Valve (MOV) Testing & Surveillance. Recommends That Licensees Test MOVs in Situ Under Design Basis Conditions ML20056A9451990-08-0707 August 1990 Forwards Insp Rept 50-423/90-80 on 900416-25.Weaknesses Identified ML20058M5361990-08-0606 August 1990 Forwards Review of Westinghouse Rept WCAP-12277, Westinghouse Owners Group Bounding Evaluation for Pressurizer Surge Line Thermal Stratification, Per NRC Bulletin 88-011 ML20058N0581990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Other Power Reactor Licenses in Region 1 Encouraged to Start Similar Initiative to Provide for Sharing of Info & Experiences Involving Engineering & Solutions of Problems Common to All 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D2901999-10-13013 October 1999 Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review ML20211H9971999-08-27027 August 1999 Forwards Insp Rept 50-423/99-07 on 990614-0715.Violations of NRC Requirements Occurred Re Adequacy of C/As for Organizational Changes & Being Treated as NCVs DD-99-09, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 9908261999-08-26026 August 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 990826 ML20211F5841999-08-23023 August 1999 Discusses Proposed Rev 21 to Northeast Utils Quality Assurance Program TR for NRC Review & Approval,Iaw 10CFR50.54 ML20211D5701999-08-20020 August 1999 Informs That in May 1999,Northeast Nuclear Energy Co, Restarted Millstone Nuclear Power Station,Unit 2.Licensee Has Been Tasked Charter with Listed Specific Responsibilities ML20211C4621999-08-18018 August 1999 Discusses Rev to TS Bases Sections 3/4.5.2 & 3/4.5.3, Emergency Core Cooling Sys Subsystems ML20210T6421999-08-17017 August 1999 Discusses Licensee 950814 Initial Response to GL 92-01, Rev 1,Supp 1, Rv Structural Integrity (Rvid), Issued on 950519 to Plant.Staff Revised Info in Rvid & Being Released as Rvid Version 2 ML20210V3311999-08-13013 August 1999 Provides Synposis of NRC OI Report Re Alleged Untruthful Statements Made to NRC Re Release of Contaminated Matl to Onsite Landfill.Oi Unable to Conclude That Untruthful state- Ments Were Provided to NRC ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210N4921999-08-0909 August 1999 Ack Receipt of 990331 Electronic Transfer of $88,000 for Civil Penalty,Proposed on 990309.Corrective Actions Will Be Examined During Future Insp ML20210Q4821999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr,As Listed,Identifying Individual to Take Exam,Thirty Days Before Exam Date ML20210L7581999-08-0404 August 1999 Forwards Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210J9501999-08-0202 August 1999 Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9021999-08-0202 August 1999 Forwards SER Finding Licensee Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210C0751999-07-21021 July 1999 Forwards 990721 Notice of Public Meeting Re post-shutdown Decommissioning Activities Rept ML20210E1601999-07-20020 July 1999 Forwards Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Noted Being Treated as Ncv.Team Identified Lack of Procedural Guidance for Identification & Trending of Repetitive Instrument Drift & Calibr Problems ML20210A9681999-07-14014 July 1999 Responds to Re Changes to Millstone Physical Security Plan Identified as Rev 32,submitted Per Provisions of 10CFR50.54(p).No NRC Approval Is Required,Based on Util Determination That Revs Do Not Decrease Plan Effectiveness ML20209E7341999-07-12012 July 1999 Discusses Util Responses to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Responses Acceptable.Info Revised in Reactor Vessel Integrity Database (Rvid) & Is Releasing as Rvid Version 2 ML20209G2921999-07-0909 July 1999 Forwards Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy DD-96-23, Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 9508211999-07-0101 July 1999 Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 950821 1999-09-30 |
See also: IR 05000245/1985014
Text
- ;4
JUL 101985
Docket Nos. 50-245; 50-336
Northeast Nuclear Energy Company
ATTN: Mr. John F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
Post Office Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Inspection 50-245/85-14; 50-336/85-21 (5/13/85-6/29/85)
This routine safety inspection was of operational and supporting activities at
Millstone Units 1 and 2. Particular attention was directed to Unit 2 refueling
outage activities. No violations of NRC requirements were identified, and no reply
to this letter is required.
The following Northeast Utilities letters on issues identified during NRC inspec-
tions have been received and reviewed. Additional NRC followup will occur during
routine inspections, but we have no questions at this time.
--
May 28, 1985 letter concerning the deviation from ASME B&PV Code requirements
for reactor coolant system piping inspections at Unit 2.
--
May 31, 1985 letter concerning the failure to follow station procedures for
local leak rate testing at Unit 2.
Your cooperation with us is appreciated.
Sincerely,
l Or3ginal Signed Btt
Edward C. Wenzinger, Chief
Projects Branch No. 3
,
Division of Reactor Projects
i. Enclosure: NRC Region I Inspection Report 50-245/85-14; 50-336/85-21
!
l
1
0FFICI AL RECORD COPY
- - . ~ _ . . _ . . . . . _
8508090034 850719 / -gQ/ $
i
'
O
ADOCK 05000245
/
I
L
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________ ____ ____ _ - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _______-_ _ _ _
..
.. <*
.
Northeast Nuclear Energy Company 2
JUL 191985
cc w/ enc 1:
E.J. Mroczka, Vice President, Nuclear Operations
W.D. Romberg, Station Superintendent
D.0. Nordquist, Manager of Quality Assurance
R.T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of-Connecticut
bcc w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
Director DRS
Director DRS&S
DRP Section Chief
W. Kane (for Event.V)
RI:DRP RI:DRP R
@ik &
Shediosky/meo McCabe We zin'ger'
7/.3B/85 7 118
}