ML20154Q352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000293/1988021]]
{{Adams
| number = ML20154Q352
| issue date = 09/15/1988
| title = Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcripts from ACRS Subcommittee 880826 Meeting in Bethesda,Md Re Proposed Plant Restart.W/O Encl
| author name = Collins S
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Pillsbury M
| addressee affiliation = WAREHAM FREE LIBRARY, WAREHAM, MA
| docket = 05000293
| license number =
| contact person =
| document report number = NUDOCS 8810030377
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000293/1988021]]
 
=Text=
{{#Wiki_filter:, - - - - - - - - - - - - - - - -
                                .
                  ~
                      ,.
                                        '
                          '
                                    ,
                                                                                          SEP 151988
                                Wareham Free Library
                                ATTN: Ms. Mary Pillsbury
                                75 High Street
                                Wareham, Massachusetts 02571
                                Dear Ms. Pillsbury:
                                This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-
                                grated Assessment Team Inspection (IATI) Report (No. 50-293/88-21), conducted
                                at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the
                                Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/
                                87-99), dated July 27, 1988, covering the period February 1, 1987 through
                                May 15, 1988; and the transcripts from the NRC's Advisory Committee on Reactor
                                Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
                                Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on
                                September 8, 1988, in Bethesda, Maryland, concerning the proposed plant
                                restart.
                                Please place this material with the copy of the PNPS Restart Plan and Self-                                  -
                                Assessment Report, which were previously provided, and make it available for
                                public review.
                                Thank you for your continuing cooperation in this matter.
                                                                          Sincerely,
                                                                            ORIGINAL SIGNED BY
                                                                          Samuel J. Collins, Deputy Director
                                                                          Division of Reactor Projects
                                Enclosures:
                                As stated
                                cc w/o encls:
                                Public Document Room (PDR)
                                  Local Public Document Room (LPOR)
                                                                                                                                              i
                                                                                                                                              I
                                                            0FFICIAL RECORD COPY      LIBRARY WAREHAM - 0001.0.0                        n\0  '
                                                                                      09/15/88                                          .s / '
              8910030377 080915
              PDR
              Q              ADOCK 05000293
                                              PDC
                                                                                                              _ _ - _ - . _ _ _ - - _ _
 
F
  . ,'*
    #
      War ham Free Library                  2
      bec w/o encis:
      L. T. Doerflein, ORP
      M. J. DiDonato, DRP
      M. T. Miller, SLO
      b)I:0RP
      R                      RI:0RP              /$1:0RP
      L0oerflein/mjd      ./JWiggin s            V41 Collins
      9/is/88                  ,, ./88              9/\S/88
                              0FFICIAL RECORD COPY  LIBRARY WAREHAM - 0002.0.0
                                                    09/15/88
}}

Latest revision as of 20:21, 10 April 2022

Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcripts from ACRS Subcommittee 880826 Meeting in Bethesda,Md Re Proposed Plant Restart.W/O Encl
ML20154Q352
Person / Time
Site: Pilgrim
Issue date: 09/15/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pillsbury M
WAREHAM FREE LIBRARY, WAREHAM, MA
References
NUDOCS 8810030377
Download: ML20154Q352 (2)


See also: IR 05000293/1988021

Text

, - - - - - - - - - - - - - - - -

.

~

,.

'

'

,

SEP 151988

Wareham Free Library

ATTN: Ms. Mary Pillsbury

75 High Street

Wareham, Massachusetts 02571

Dear Ms. Pillsbury:

This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-

grated Assessment Team Inspection (IATI) Report (No. 50-293/88-21), conducted

at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the

Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/

87-99), dated July 27, 1988, covering the period February 1, 1987 through

May 15, 1988; and the transcripts from the NRC's Advisory Committee on Reactor

Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial

Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on

September 8, 1988, in Bethesda, Maryland, concerning the proposed plant

restart.

Please place this material with the copy of the PNPS Restart Plan and Self- -

Assessment Report, which were previously provided, and make it available for

public review.

Thank you for your continuing cooperation in this matter.

Sincerely,

ORIGINAL SIGNED BY

Samuel J. Collins, Deputy Director

Division of Reactor Projects

Enclosures:

As stated

cc w/o encls:

Public Document Room (PDR)

Local Public Document Room (LPOR)

i

I

0FFICIAL RECORD COPY LIBRARY WAREHAM - 0001.0.0 n\0 '

09/15/88 .s / '

8910030377 080915

PDR

Q ADOCK 05000293

PDC

_ _ - _ - . _ _ _ - - _ _

F

. ,'*

War ham Free Library 2

bec w/o encis:

L. T. Doerflein, ORP

M. J. DiDonato, DRP

M. T. Miller, SLO

b)I:0RP

R RI:0RP /$1:0RP

L0oerflein/mjd ./JWiggin s V41 Collins

9/is/88 ,, ./88 9/\S/88

0FFICIAL RECORD COPY LIBRARY WAREHAM - 0002.0.0

09/15/88