JUL 141988 i
MEMORANDUM FOR: Team Members FROM:
' Randy Blough
. Team Leader SUBJECT:
PILGRIM INTEGRATED ' ASSESSMENT TEAM INSPECTION (50-293/88-21)
j
'i
'This is to provide you with updated information about the subject _ inspection in, which you are assigned.
The-inspection is scheduled to be conducted August 8-19, 1988, with onsite preparation July 19-21', 1988. We will issue a revised operational / inspection plan shortly which provides the primary adminis-trative and technical guidance. ' Detailed planning and preparation for func-tional area inspections is, 'of-course, the responsibility of the. individual inspectors. Note that shift inspectors have also been assigned responsibility for various functional areas.
We-have made lodging. arrangements at the Sheraton Plymouth at Village Landing, 180 Water Street,. Plymouth, Massachusetts (508) 747-4900. Members should make their own travel arrangements.
Attachment ' 1 ~ is the current team roster.
Attachment 2 is a preliminary schedule.
For _ Region _ I inspectors, any necessary overtime will be paid. There will'be no compensatory time unless you make special arrangements with your supervisor.
Headquarters participants should make their own arrangements for overtime or compensatory time.
Please contact me if you have any further comments or questions (FTS 346-5146)
or (215) 337-5146.
dl.
!
-
Q Randy Blough
Team Leader i
Attachments:
1.
Team Roster 2.
Preliminary Schedule cc w/ attachments:
Restart Panel Members W. Kane, DRP L. Doerflein, DRP.
!
M. Kohl, DRP i
R. Gallo, DRS l
8903030336OkE25 jj j
(
. - _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ - -
-_
_
- _ _ _ _ _ _ - _ _ _ _
,
.( <
~d'+:
1 \\':;.
s 1'
,
'
iy.
s.;
y
,
'
,
d
)
f f
]l}
'
p
.
f.[
cATTACHMENT li L
,
.
Pilgrim IATI' Roster-
..e-
-
,
..c
,
_
J-Senior Manager:
- Sam Collins-Team Leader:
Randy Blough 1 Technical: Assistant:
. Clay Warren
" Administrative Assistant:
Mary Jo DiDonato Shift Inspectors:
Bill Raymond (Maintenance)
Larry Rossbach (Fire Protection)
'
Larry Doerflein-(Surveillance)
Loren Plisco
'(Review Committees /0A).
Frank Akstulewicz (Surveillance / Review-Committees)
'
. Specialist Inspectors:
HP:
Tom Dragoun Security:
Greg-Smith-Maintenance:
'Jeff Lyash-
' Training / Management:
-
Dan Mcdonald n
,
e
>
if
____ --___ ____,___- -_ - - - - _ - _ _
_,.
.
-.
-..
, ?.NJ
.
{'
/
r
4y
/
,
,
ATTACHMENT 2'
'
i..
Pilgrim IATI Preliminary Schedule -
.I.
.'7/19-21 - Prep Week Onsite,. as' needed.. for individual preps and badging. As a minimum, ' team :
members should complete badging, arrange and receive. a-briefing from the-resident inspectors, and attend licensee presentations.
'7/19 a.m.
-
Complete' badging. Obtain.' briefing books / discussion from residents. Team meeting to discuss -inspection scope and individual ~ responsibilities / '
assignment,
,
7/19 p.m.
Detailed-plant tour in three groups (Warren, Lyash and Kim coordinate).
-7/20 a.m.
' Licensee L presentation on plant and program status and results of' INPOL review.
7/20'- 4:00'- 6:00 p.m.
Team me'eting onsite. Additional meetings will be held as needed throughout-the inspection.-
II. 8/8 - 8/19 - Inspection 8/8 -L1:00'p.m.
I Entrance interview onsite.
Team meeting to follow entrance interview.
8l8
-
Begin specialist inspection (each inspector is responsible for his per-sonal inspection sequencing and scheduling). Shift inspectors will have I
assignments of programmatic issues to evaluate when not in shift work.
i 8/9-10 Continue inspection.
)
p..
o mp."
.
'
~
fg[
Attachment 2 - Preliminary Schedule-2.
.g
,
,
8/10 - 3:00 p.m.
Begin shift coverage.
8/11-12.
Continue'spe'cialist and shift inspection.
8/13 - 8:00 p.m.
Decision will be made whether enough has been learned to discontinue shift inspections.'
,
8/14
.SundayOff-(Optional).
8/15-17 Continue specialist inspection and followup of shift inspector' identified
. issues.
8/18 a.m.
Individuals organize / summarize.
8/1'8 - 2:00 p.m.
Team Meeting.
8/18 - 4:00 p.m.
First Exit Dry Run and Critque.
'8/19 - 9:00 a.m.
Second Exit Dry Run. Wrap-up - fill holes.
.
.
,
8/19 - 1:00 p.m.
Exit Interview 111.'8/19-24 Complete Individual Documentation Onsite L
l'
Each inspector will be reouired to provide report input, acceptable to the Team Leader, prior to being released. Inspectors may work the weekend to accomplish this or may take as much of 8/22-24 onsite as needed.