IR 05000293/1988021

From kanterella
Jump to navigation Jump to search
Provides Updated Info Re 880808-19 Pilgrim Integrated Team Insp 50-293/88-21,w/onsite 880719-21 Preparation.Revised Operational/Insp Plan Will Be Issued Shortly.Current Team Roster & Preliminary Schedule Encl
ML20235R445
Person / Time
Site: Pilgrim
Issue date: 07/14/1988
From: Blough R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20235R314 List:
References
FOIA-88-519 NUDOCS 8903030306
Download: ML20235R445 (4)


Text

__ _ - __

-. -- -_-

}',

3 m

_,

.s .

t; JUL 141988 i

MEMORANDUM FOR: Team Members FROM: ' Randy Blough

. Team Leader SUBJECT: PILGRIM INTEGRATED ' ASSESSMENT TEAM INSPECTION (50-293/88-21) j

'i

'This is to provide you with updated information about the subject _ inspection in, which you are assigne The- inspection is scheduled to be conducted August 8-19, 1988, with onsite preparation July 19-21', 1988. We will issue a revised operational / inspection plan shortly which provides the primary adminis-trative and technical guidance. ' Detailed planning and preparation for func-tional area inspections is, 'of- course, the responsibility of the . individual inspectors. Note that shift inspectors have also been assigned responsibility for various functional area We-have made lodging. arrangements at the Sheraton Plymouth at Village Landing, 180 Water Street, . Plymouth, Massachusetts (508) 747-4900. Members should make their own travel arrangement Attachment ' 1 ~ is the current team roste Attachment 2 is a preliminary schedul For _ Region _ I inspectors, any necessary overtime will be paid. There will'be no compensatory time unless you make special arrangements with your superviso Headquarters participants should make their own arrangements for overtime or compensatory tim Please contact me if you have any further comments or questions (FTS 346-5146)

or (215) 337-514 d Q Randy Blough

! -

i 3 Team Leader Attachments: Team Roster Preliminary Schedule cc w/ attachments:

Restart Panel Members W. Kane, DRP L. Doerflein, DR !

M. Kohl, DRP i R. Gallo, DRS l

jj j 8903030336OkE25 FOIA I ( PDR PDR

. - _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ - -

-_ _ - _ _ _ _ _ _ - _ _ _ _

,

~d'+: \':;. 1'

.( <

, s y

'

s.;

iy . ,

'

,

d

) f f 5

'

]l}

p

.

f.[ cATTACHMENT li L

, .

Pilgrim IATI' Roster-

. .e-

-

, ..c

, _

J- Senior Manager: : Sam Collins-Team Leader: Randy Blough 1 Technical: Assistant: . Clay Warren

" Administrative Assistant: Mary Jo DiDonato Shift Inspectors: Bill Raymond (Maintenance)

'

Larry Rossbach (Fire Protection)

Larry Doerflein- (Surveillance)

Loren Plisco '(Review Committees /0A).

Frank Akstulewicz (Surveillance / Review-

'

Committees)

. Specialist Inspectors:

HP: Tom Dragoun Security: Greg-Smith-Maintenance: 'Jeff Lyash-

' Training / Management:

-

.Michele Evans Dan Mcdonald n

,

e

>

if

____ --___ ____,___- -_ - - - - _ - _ _

_ ,. .

-. -. .

, ? .NJ

.

/

{'

r

4y

, / ,

'

ATTACHMENT 2'

i. .

Pilgrim IATI Preliminary Schedule -

. .'7/19-21 - Prep Week Onsite,. as' needed.. for individual preps and badging. As a minimum, ' team :

members should complete badging, arrange and receive. a- briefing from the-resident inspectors, and attend licensee presentation '7/19 Complete' badging. Obtain.' briefing books / discussion from residents. Team meeting to discuss -inspection scope and individual ~ responsibilities / '

assignment,

,

7/19 Detailed- plant tour in three groups (Warren, Lyash and Kim coordinate).

-7/20 ' Licensee L presentation on plant and program status and results of' INPOL revie /20'- 4:00'- 6:00 Team me'eting onsite. Additional meetings will be held as needed throughout-the inspection.-

II. 8/8 - 8/19 - Inspection 8/8 -L1:00'p.m.

I Entrance interview onsit Team meeting to follow entrance interview.

8l8

-

Begin specialist inspection (each inspector is responsible for his per-sonal inspection sequencing and scheduling). Shift inspectors will have I assignments of programmatic issues to evaluate when not in shift work.

i 8/9-10 Continue inspection.

)

p .. o mp."

.

'

~

fg[

.g Attachment 2 - Preliminary Schedule- ,

,

8/10 - 3:00 Begin shift coverag /11-1 Continue'spe'cialist and shift inspectio /13 - 8:00 Decision will be made whether enough has been learned to discontinue shift inspections.'

,

8/14

.SundayOff-(Optional).

8/15-17 Continue specialist inspection and followup of shift inspector' identified

. issue /18 Individuals organize / summariz /1'8 - 2:00 Team Meetin /18 - 4:00 First Exit Dry Run and Critqu '8/19 - 9:00 Second Exit Dry Run. Wrap-up - fill hole . .

,

8/19 - 1:00 Exit Interview 111.'8/19-24 Complete Individual Documentation Onsite L

l' Each inspector will be reouired to provide report input, acceptable to the Team Leader, prior to being released. Inspectors may work the weekend to accomplish this or may take as much of 8/22-24 onsite as needed. _ - - _ _ - _ - _ _ _ _ _ _ _ - _ _ _ - _ - _ _ . _ _