ML20154Q327

From kanterella
Jump to navigation Jump to search
Forwards Restart Readiness Assessment Rept for Facility,For Public Availability.W/O Encl
ML20154Q327
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
CARVER PUBLIC LIBRARY
References
NUDOCS 8810030369
Download: ML20154Q327 (1)


Text

~-

. -O SEP 271988 Carver Public Library ATTN: Librarian Post Office Box 328 Main Street Carver, Massachusetts 02330 Gentlemen:

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Power Station (PNPS).

Please place this material with the . copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely, ORIGINAL SIGNED 3Y Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encis:

Pubite Document Room (POR)

Local Public Document Room (LPOR) bec w/o encis:

L. T. Doerflein, ORP M. J. DiDonato, DRP M. T. Miller, SLO Y

RI:0RP RI:0RP ) RP L0oerflein/mjd JWiggins /5 llins 9/,d/88 9/%/88 9M/88 0FFICIAL RECORD COPY LIBRARY CARVER - 0001.0.0 09/26/88 0

8810030369 880927 '

PDR P

ADOCK 05000293 PDC 4-g[/[

._ -__- __- ._ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . . - _ _ _ _ _ _ -_ __ . - - - _ _ _ - _ _ ____________-__-___-_n