ML20154Q157
| ML20154Q157 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/15/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | PLYMPTON PUBLIC LIBRARY |
| References | |
| NUDOCS 8810030326 | |
| Download: ML20154Q157 (2) | |
See also: IR 05000293/1988021
Text
_ _ _ - . _ _ _ _ _ _ _ _ .
- .
,
SEP 151988
'
- Plympton Pubile Library
ATTN:
Librarian
248 Main Street
Plympton, Massachusetts 02367
Gentlemen:
This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-
grated Assessment Team Inspection (IATI) Report (No. 50-293/88-21), conducted
at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the
Systematic Assessment of Liceasee Performance (SALP) Board Report (No. 50-293/
87-99), dated July 27, 1988, covering the period February 1, 1987 through
May 15, 1988; and the transcripts from the NRC's Advisory Committee on Reactor
Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on
September 8, 1988,
in Bethesda,
concerning
the proposed plant
restart.
Please place this material with the copy of the PNPS Restart Plan and Self-
Assessment Report, which were previously provided, and make it available for
public review.
Thank you for your continuing cooperation in this matter.
Sincerely,
'MIGINAL ff0NIO I
Samuel J. Collins, Deputy Director
Olvision of Reactor Projects
Ei.-l o sure s :
As stated
cc w/o encls:
Public Document Room (POR)
local Public Document Room (LPDh)
k)
0FFICIAL RECORD COPY LIBRARY PLYMPTON - 0001.0.0
09/15/88
\\
8810030326 es. 15
.
N}
f
ADOCK 000 0293
M
ME/
j
, _ _ _ _ _ _ _ _ _ _ _ _-
e
'
'
'
Plympton Public Llurary
2
SEP 151988
bec w/o encis:
L. T. Doerflein, ORP
M. J. 010onato, CRP
M. T. Miller, SLO
k)
RI:0RP
RI:DRP
I:0RP
L0cerflein/mjd
e 'JWiggins
Collins
9/K /88
9/p/88
9/15/88
0FFICIAL RECORD COPY LIBRARY PLYMPTON - 0002.0.0
09/15/88
.
_.)