ML20154P902

From kanterella
Jump to navigation Jump to search
Forwards NRC Restart Assessment Panel Restart Readiness Assessment Rept for Facility.W/O Encl
ML20154P902
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pillsbury M
WAREHAM FREE LIBRARY, WAREHAM, MA
References
NUDOCS 8810030220
Download: ML20154P902 (1)


Text

.

I SEP 271988 Wareham Free Library ATTN: Ms. Mary Pillsbury 75 High Street Wareham, Massachusetts 02571 i

Dear Ms. Pillsbury:

l l

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim i

Restart Assessmer.t Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Power Station (PNPS).

Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for t

. public review.

(

Thank you for your continuing cooperation in this matter.

{

Sincerely, j

l blelNAI. SIGNED BY l

Samuel J. Collins, Deputy Director i

Division of Reactor Projects t

Enclosures-As stated l

cc w/o encis:

Public Document Room (POR) local Public Document Room (LPOR) f bec w/o encis:

L. T. Doerflein, DRP M. J. OtDonato, DRP M. T. Miller, SLO r

R

'I:0RP RP L0oerflein/mjd Wiggins ins I

9/W /88 9/E/88 9 [ /88 0FFICIAL RECORD COPY 1.10RARY WAREHAM - 0001.0.0 i

j 09/26/88 I

l

[

QA $$50 ES$k&3

' 0

~p

{

P

>