ML20154Q281
| ML20154Q281 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/27/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Driscoll M FREDERICK C. ADAMS PUBLIC LIBRARY |
| References | |
| NUDOCS 8810030355 | |
| Download: ML20154Q281 (1) | |
Text
g-SEP 271988 Frederick C. Adams Public Library ATTN: Ms. Mary Ann Oriscoll Summer Street Kingston, Massachusetts 02369
Dear Ms. Driscoll:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for tha Pilgrim Nuclear Power Station (PNPS).
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely, ORIGINAL SIGNED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
Enclosures:
As stated cc w/o encis:
Public Document Room (POR) local Public Document Room (LPOR) bec w/o encls:
L. T. Doerflein, DRP M. J. 010onato, DRP M. T. Miller, SLO ot RI:0RP
- 0RP I
RP L0oerflein/mjd Wiggins 111ns I
9A4/88 9A6/88 9 4 /88 0FFICIAL RECORD COPY LIBRARY KINGSTON - 0001.0.0 09/26/88 i
1 0
[fa' v '[
8s10030355 880927 ADOCK0500go3 DR
_