ML20154Q309
| ML20154Q309 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/27/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | PLYMPTON PUBLIC LIBRARY |
| References | |
| NUDOCS 8810030362 | |
| Download: ML20154Q309 (1) | |
Text
<-
SEP 271988 Plympton Public Library ATTN:
Librarian 248 Main Street Plympton, Massachusetts 02367 Gentlemen:
This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for the Pilgrim Nuclear Power Station (PNPS),
Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely, ORIGINAL SIGNED BY Samuel J. Collins, Deputy Director Olvision of Reactor Projects
Enclosures:
As stated cc w/o encis:
Public Document Room (POR) local Public Document Room (LPOR) bec w/o encis:
L. T. Doerflein, DRP M. J. DiDonato, ORP M. T. Miller, SLO 41: RP I:0RP RI:0RP L0oerflein/mjd Viggins Sco11tns 9/3 /88 9/b/88 9/1Y/88 0FFICIAL RECORD COPY LIBRARY PLYMPTON - 0001.0.0 09/26/88 f 0
_- - I 8810030362 880927
/ C C/
gDR ADOCK0500yg3
,,,f C s e
-