Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20058C1231990-10-18018 October 1990 Responds to Which Objected to NRC Response to Inspector General Rept 90-N02 Re Emergency Preparedness. Special Task Force Established to Review Comments & Documents Presented at 900906 Meeting ML20059H3711990-09-0505 September 1990 Responds to Sent to M Miller Re Actions Taken by Util to Install Tanks on Property Adjoining Power Station. Tanks Being Installed as Part of Sewage Leach Field Sys for New Waste Treatment Facility.Nrc Has No Concerns Re Tanks ML20058M3261990-08-0909 August 1990 Responds to Re Fr Notices to Amend OL for Plant. Plant Request Consistent W/Previously Approved Requests Re BWRs & BWR Sts.Most Other BWRs Perform Logic Sys Functional Test Once Per 18 Months ML20055G7841990-07-19019 July 1990 Responds to Enclosing Article from Providence Journal Which Stated That Plant Could Operate at No More than 65% of Power While Recirculation Pump Working.License Condition Does Not Permit Continuous Single Loop Operation ML20055G3261990-07-13013 July 1990 Responds to to AR Blough Concerning NRC Findings of Reasonable Assurance Re Emergency Preparedness at Plant. Reasonable Assurance Exists Now & Existed When NRC Permitted Initiation of Power Ascension Program Above 5% Power ML20055F0541990-06-19019 June 1990 Final Response to FOIA Request.App C Records Encl & Available in PDR ML20245A8151989-06-14014 June 1989 Responds to 890515 Request for Info Re 880412 RCIC Sys Event.Augmented Insp Team Concluded That Transient Minor Since Several Barriers Remained Intact to Mitigate Effects of Potential Intersystem Loss of Coolant DD-89-03, Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 8906061989-06-0606 June 1989 Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 890606 ML20246P6791989-05-0202 May 1989 Responds to Questions in Re Liability & Responsibility Requirements Under Price-Anderson Act.State of Ma Civil Defense Agency or FEMA Should Be Contacted Re Draft Implementing Procedures for Duxbury,Ma ML20244D6521989-04-17017 April 1989 Responds to to Chairman Zech Re Concerns W/Status of Emergency Preparedness at Facility.Commission Continues to Endorse Deliberate,Phased Startup Program,Over 4 to 6 Month Period,W/Augmented NRC Oversight ML20247F6481989-03-30030 March 1989 Ack Receipt of Info Sent in Transmittal Postmarked 890218 Re NRC TLD Direct Radiation Monitoring Network ML20245C1501989-03-30030 March 1989 Forwards NRC Biweekly Status Insp Repts of Plant in Response to 890315 Article Re Lapse in NRC Insp Coverage.W/O Encl ML20246M4591989-03-10010 March 1989 Responds to to Vice President Bush Re Personal Safety If Facility Permitted to Restart.Resumption of Power Dependent on Satisfactory Demonstration of Required Improvements in Emergency Preparedness ML20235R3601989-02-23023 February 1989 Discusses Review of Current Status of Licensee Power Ascension Test Program & Specific Issues Identified During 880408 Mgt Meeting ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20205S0951988-11-0707 November 1988 Responds to 881015 Concerns Re Proposed Restart of Plant. Chairman Zech to P Agnes Re Expulsion from Meeting Encl ML20206B3011988-11-0303 November 1988 Forwards Util Description of Safety Enhancement Program, NRC Initial Assessment,Request for Addl Info & Util Revised Info Re Direct Torus Vent Sys,Per 881004 Discussion.W/O Encls ML20154P9021988-09-27027 September 1988 Forwards NRC Restart Assessment Panel Restart Readiness Assessment Rept for Facility.W/O Encl ML20154Q3271988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility,For Public Availability.W/O Encl ML20154Q3091988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20154Q2811988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20154Q3521988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcripts from ACRS Subcommittee 880826 Meeting in Bethesda,Md Re Proposed Plant Restart.W/O Encl ML20154Q2451988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99 for 870201-880515 & Transcript from ACRS 880826 Meeting for Public Review.W/O Encls ML20154Q1571988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99.Transcript of ACRS 880826 Meeting Also Encl.W/O Encls ML20154P8861988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcript of ACRS 880826 Meeting in Plymouth,Ma & 880908 Meeting in Bethesda,Md Re Plant Restart.W/O Encls ML20151W1741988-08-16016 August 1988 Responds to 880623 Appeal of 880610 Denial of FOIA Request. Previously Withheld Record Encl.Region I Responded to Remaining Portion of Not Directly Relating to FOIA Request ML20151B1801988-07-0808 July 1988 Responds to Expressing Concern Re Adequacy of Highway Network Being Considered as Part of Emergency Plan. Location in Wellesley Tentatively Selected as Site for Reception Ctr.Fema Approves Adequacy of Ctrs ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195C6711988-06-14014 June 1988 Forwards Answers to Questions from Recipient Ref by Senator Kennedy,Per .Nrc Does Not Inspect or Monitor Animal Census & Distribution of Carcasses,Meat,Organs & Milk.Licensee Monitors Milk Samples ML20155G4301988-06-10010 June 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App C & Releasable Portion of App D. Apps B & C Records Available in Pdr.App D Documents Partially Withheld (Ref FOIA Exemption 7) ML20195C1871988-06-10010 June 1988 Forwards Info Re Provisions for Emergency Plans for transport-dependent & mobility-impaired Population,Per 880511 Request.Facilities Are Addressed within Individual Town Plans & Procedures ML20151N6891988-04-19019 April 1988 Final Response to FOIA Request for Records Re Boston Edison.App a Documents Located in PDR ML20151H0921988-04-13013 April 1988 Expresses Disappointment w/880409 Article.Article Made Inadequate Representation of Author 880407 Conversation W/ Reporter.Incorrect Conclusions in Article Attributed to Author Ltr.Herald Should No Longer Contact Author ML20151G6551988-03-25025 March 1988 Responds to Re 880211 Fire Event at Plant & Request for Adjudicatory Hearing Before Allowing Restart of Reactor.Event Was Not Considered as Having Potential to Escalate to an Event Which Would Have Threatened Public ML20148C4821988-03-17017 March 1988 Responds to to Chairman Zech Expressing Concerns Re Emergency Preparedness Plans at Plant.Nrc Will Not Permit Plant to Resume Operation Until Safe Operation Can Be Determined ML20205H0981988-03-15015 March 1988 Expresses Appreciation for Input & Comments Re Emergency Preparedness Concerns for Restart Plans at Pilgrim Station. Pilgrim Restart Task Force Instituted to Disposition Public Comments & Emergency Preparedness Issues ML20149M8311988-02-23023 February 1988 Partial Response to FOIA Request.Forwards Apps J & K Documents.Apps I,J & K Documents Also Available in Pdr. App K Documents Partially Withheld (Ref FOIA Exemptions 5 & 6.)App L Documents Withheld (Ref FOIA Exemption 5.) ML20236B1721987-11-17017 November 1987 Forwards R Bird Clarification Re Licensee Offsite Emergency Planning Process for Plant,Including Studies Conducted for Sheltering Beach/Transient Populations to Provide Town of Duxbury,Ma W/Data to Identify Final Usable Shelters ML20236H8581987-11-0202 November 1987 Responds to Recipient Ltr to Chilk,Expressing Concerns Re Emergency Preparedness for Plant.Nrc Will Not Permit Plant to Resume Operation Until Determination That Health & Safety of Public Can Be Protected ML20236G1461987-10-23023 October 1987 Discusses Murley 871016 Response to Re Overtime at Plant.Util Will Investigate Matter & Provide Rept to Nrc. NRC Review Will Not Involve Obtaining Copies of All Overtime Documentation IA-87-602, Final Response to FOIA Request for Documents.App a Documents Already Available in Pdr.No Addl Records Located Since Requested Info Possessed by Licensee Only1987-10-0202 October 1987 Final Response to FOIA Request for Documents.App a Documents Already Available in Pdr.No Addl Records Located Since Requested Info Possessed by Licensee Only ML20235S2351987-10-0202 October 1987 Final Response to FOIA Request for Documents.App a Documents Already Available in Pdr.No Addl Records Located Since Requested Info Possessed by Licensee Only ML20238E3931987-09-10010 September 1987 Final Response to FOIA Request.App D Documents Re SALP Rept Preparation Encl & Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5).App F Documents Partially Withheld (Ref FOIA Exemption 4) ML20238E0081987-09-0101 September 1987 Responds to 870715 Questions Re Plant Concerning GE Pumps ML20237L2391987-08-25025 August 1987 Partial Response to FOIA Request for Documents Used by Enforcement Staff as Guideline for Issuance of Enforcement Actions.Forwards Documents Listed in App D.App D Documents Available in PDR ML20237G4811987-08-12012 August 1987 Partial Response to FOIA Request for Listed Documents Re Nov 1985 - Jan 1987 SALP for Facility.Forwards App a Documents.App a & B Documents Available in Pdr.App C Documents Withheld (Ref FOIA Exemption 5) ML20236H0831987-07-30030 July 1987 Responds to Re Possibility of LOCA at Plants. Majority of LOCA Research Complete & Understanding of ECCS Performance During LOCA Greatly Improved.Conservatism of Methods Specified in Commission Rules Demonstrated ML20215C0481987-06-12012 June 1987 Final Response to FOIA Request for Info Re Environ Monitoring Rept Samples & Insp Rept 50-293/78-27.App a Documents Already Available in PDR ML20214M2131987-05-22022 May 1987 Responds to 870403 Request Re Iodine Releases,Availability of Records & Measurement of Calculation Methods.Nrc Routinely Inspects Util Effluent Release & Sampling Programs & Semiannual Effluent Repts ML20214H9311987-05-20020 May 1987 Responds to 870428 Mailgram Demanding Proof Prior to Restart That Stated Circumstances,Including Valve Failure Permitting Loss of Coolant from Reactor Core Through Failed Valve, Cannot Occur 1990-09-05
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Text
- - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _
U.S. NUCLEA:t RESULATORY COMMISSION Nac saa snoUthT NUusER<si FOIA-87-394
[ =*'*g Q 'f REs,%so m E l '^"'
[,'Z1' -
- RESPONSE TO FREEDOM OF A , L/ O I *^'
^"
INFORMATION ACT (FOIA) REQUEST AUG 121987 (e.ee e DOCKET NUMBERi$i Ur oppeceam KtOVE3id Ms. Rachel Shimshak PART l.-RECORDS RELEASED OR NOT LOCATED (See checked bones)
No opency records subpect to the request have been located.
No additenal agency records subpect to the request have been located.
Agency recorde subsect to the roguast that are idendhed in Appendia b are already evadable for pub 6sc irspecten and copying in the NRC Pec Document Room.
N 1717 H Street, N W., Washington DC.
Agency records subpect to the request that are identified in Appendix A are being made avaitabie for pubiac insp.cton and opying in the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under this FOIA number and requester name.
The nonpropnetary version of the proposalls) tn., you agreed to accept in a telephone conversation wrth a member of my staff is now being made avanable for public inspecten and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under this FO;A number and requemer name.
X incioned is informaten on how you may obtain access to and the charges for copying records placed in the NRC Publec Docurnent Room,1717 H Street, N.W., Washington. DC.
A gency records subpmet to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments secten.
Records subpect to the request heve been refe. red to another Federal egencylies) for review and direct response to you.
In view of NRC's response to the request, no further action is being taken on appeal letter dated PART If A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certan informaton in the requested records is being withheld from public disclosure pursuant to the FOlA exemptons desenbod in and for the reasons stated in Fart 11, sec.
tiors B. C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspecten and copying in N t he NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder pr. der this FOIA number and requester riamo.
Comments
- 0, ?)
. ) ._
i
/
StGN O , DIR CTOR. DM Of RU ND RECDRDS YW -
s 870G140093 070012 PDR FO]A SHIM 5 HAG 7-394 PDR N".C FORM 464 IPen 11 seen
FREEDOM OF INFORMATION ACT RESPONSE FOIA NUMBER (SI: 87-394 DATE: atir: 19 -
PAMT ll.B- APPLICABLE FOIA EXEMPTIONS R3 corda subject to the request that are descritad in the enclosed Appendices C are being withneid in their entirety or in part under FOIA Emsmptions and for the reasons set forth below pursuant to 5 U.S.C. 552(b) and 10 CFR 9.5(a) of NRC Regulations,
- 1. The withhe ad information is property classrfed pursuant to Executive Order 12356 IEXEMPTION 11
- 2. The withheld information relates solely to the intamal personnel rules a.id procedures of NRC. (EXEMPTION 2)
- 3. The withheld information is specifically exempted from public declosure by statute indicated: (EXEMPTION 3)
Secten 141145 of the Atomic Energy Act which prohitxts the declosure of Restncted Data 'or Formerty Restncted Deta (42 U.S.C. 216121651.
Secten 147 of the Atomic Energy Act which prohibits the declosure of Unclassified Safeguards Informaton 142 U.S.C. 2167).
- 4. The withheld information is a trade secret or commercial or financial informaton that is being withheld for the reason (s) indicated: (EXEMPTION di The infotmaten is Considered to be Confidential business (proprotary) information.
The information is considered to be proprietary informaton pursuant to 10 CFR 2.790(d)(1L
?
The information was submitted and received in confidence from a foreign source pursuant to 10 CFR 2.790(d)(2).
- 6. The withheld information consists of interagency or intraagency records that are not available through discovery dunng litigaten. Onclosure of predecisional informaton X would tend to inhibit the open and frank enchange of ideas essental to the deliberative process. Where records are withheld in their entirety, the facts are inextricably intertwmed with the predecmonal informaten. There also are no reasonably segregab6e factual portions because the release of the facts would permet an indirect inquery into tre predecisonal process of the agency. (EXEMPTION 5)
- 6. The withr s information is exempted from public dadosure because its disclosure would result in a clearly unwarranted invasion of personal privacy. (EXEMPTION 6)
- 7. The withheld information consets of investigatory records compleo for law enforcement purposes and is being withheld for the reason (f1 indicated. (EXEMPTION 7)
Disclosure would interfere wtth en enforcement proceedsng because et could reveal the scope, directen, and focus of enforcement efforts. and thus could possibly allow them to take action to sheid potental wrongdoing or a violation of NRC requirements from investigators. (EXEMPTION 7(All Disclosure would constitute an unwarranted invasson of personal privacy (EXEMPTION 71C))
The information consists of names of individuals and other informaton the disclosure of which would reveal identrbes of confusential sources. (EXEMPTION 7(D))
PART !!.C-DENYING OFFICIALS Pursuant to 10 CFR 9 9 and/or 9.15 of the U.S. Nuclear Regulatory Commasen regulatons, it has been determined that the information withheid is exempt from productiun or declusufe, gnd that its producten or declosure is contrary to tra publ#c interest. The persons responsible for the denial are those officials identified below as denying officials and the Director, Divicion of Rules and F;ecords, Office of Adminstraten, for any denials that may be appealed to the Executive Director for Operations (EDol.
DENYING OFFICIAL TITLE / OFFICE RECORDS DENIED APPELLATE OFFICIAL Regional Administrator' """ '
Mr. William T. Russell Region 1 Appendix C X PART 110- APPEAL RIGHTS The denial by each denying officialidentified in Part ILC may be appealed to the Appellate Official identified in that section. Any such appeal must be in writing and must be made within 30 days of receipt of this response. Appeals must be addressed as appropriate to the Executive Director for Operations or to the Secretary of the Commission, U.S. Nucteer Regulatory Commission, Washington, DC 20555, and should clearly state on the enveiope and in the letter thct it is an " Appeal from en initial FOIA Decision."
t'Ac FonM asa trert 2) U.S. NUCLEAR REGULATORY COMMISSION masi FOIA RESPONSE CONTINUATION
1 APPENDIX A DOCUMENTS TO BE RELEASED FOIA REQUEST NUMBER 87-394 DATE ORIGINATOR RECIPIENT DESCRIPTION 1, 11/15/85 NRC, Region I File BECo Meeting Notes (1 Page)
- 2. 6/11/86 Boston Edison Security Program Flow Chart I Company (BEco) (Annotated) (2 Pages) 1
- 3. 7/24/86 Boston Edison Security Program Flow Chart l Company (BEco) (Annotated) (2 Pages) '
- 4. 7/25/86 NRC NRC Manual Chapter 0516 -
Systematic Assessment of Licensee Performance (46 Pages)
- 5. 7/30/86 NRC/ Boston Ediron Company Management Meeting Agenda (1 Page) i
- 6. 10/10/86 BECo NRC, Region I ' Letter revising completion date for HVAC Vital Area barrier modifications (2 Pages)
- 7. 11/12/86 NRC, IE IE Manual Chapter 2515 -
Light-Water Reactor Inspection Program -
Operations Phase (26 Pages)
- 8. 1/13/87 List of Meeting attendees and charts for on-site meeting 1/13-1/15/87 (8 Pages)
- 9. 1/15/87 Closecut notes and charts from meeting (6 Pages)
- 10. 2/9/87 'lRC, Region I Region I Instruction 1440.1, Revision 0 - Systematic Assessment of Licensee Performance (43 Pages) i l
____--___----a
g" , .- ., APPENDIX D,. . ,
DOCUMiNFS AVAIIABIE FaQM DE PDR/DCS 7 ' #'
~
FOIA RDQUEST 87-394 yhe fo) lowing ara ex@ frm the DCS e az c tan providing brief description, accession ntnber and microfiche g NO.
inspection reports that went into the SALP 2 05000293 CLNTU 860128 8602280781 Forwards Saf,ety Syus Functional Insp Rept 50-293/85-30 on 86/01 34756 C51104-08 & 18-22.Rept includes findings that may re 054 3 05000293 TIUTIN 860121 8602280784 86/01 34756 Insp Rept 50-293/85-30 on 851023-1122.No noncompliance 056 noted. Major areas inspected: operational readiness of 4 05000293 CLNTU 860106 8601150169 86/01 34280 Forwards Saf ety Insp Rept 50-293/85-31 on 851105-1206.No 294 violations noted. Errors f ound in tagging & listing a
~~
1 05000293 TIUTIN 860103 8601150194 86/01 34280 Saf ety Insp Rept 50-293/85-31 on 851105-1206.No violations 296 noted. Errors f ound in operating procedure & valve ch r
2 05000293 CLNTU 851231 8601070174 85/12 34175 Forwards Radiological Safety Insp Rept 50-293/85-32 on 215 851117-22 & notice of violation. Concerns identified 4 05000293 TIUTIN 851220 8601070233 85/12 $4175 s Insp Rept 50-293/85-32 on 851117-22. Vi ol ati ons noted s f ailure 220 '
to search package brought into protected area & fail 4 05000293'CLNTU 851226 8512310110 85/12 34096 Forwards Saf ety Insp Rept 50-293/85-34 on 851202-06.No 314 violation noted.
3 05000293 TIUTIN 851220 8512310114 85/12 34096 Insp Rept 50-293/85-34 on 851202-06.No violation or 316 dsviation noted. Major areas inspected inservice test
r 3;r.5h Y ~ *. ,
& ; 0 rr$ ?SA -
.c I'
2 C5000293 CLNTU' 860415-8604170370 86/04 35585 Forwards Insp Rept 50-293/85-35 on 851209-13.Two 123 d:2ficiencies involving failure to. fully document 3 05000293 CLNTU 860415 8604250157. 86/04 35693 Forwards'Insp Rept 50-293/85-35 on 851209-13. Deficiency re 109
' failure to' fully document qualification of.Barton 28 3 05000293 TIUTIN 860408 8604250165 86/04 35693 Insp Rept 50-293/85-35 on 851209-13.No viol ation noted. 112 Major areas inspected: implementation of program to 2 05000293 TIUTIN. 860408 8604170377 86/04 35585 i Insp Rept 50-293/85-35 on 851209-13. Deviations noted:f ailure 127 to f ully document qualification of Barton 288A main 1'05000293 CLNTU 860124 8602060010 86/01 34490 Forwards Safety Insp Rept 50-293/85-!6 on 851207-31.No 232 violations noted.
4 05000293 TIUTIN 860123 8602060011 86/01 34490 Insp Rept 50-293/85-36 on 851207-31. No viol ati ons noted. 234 ;
Major areas inspected control room, plant operations, {
l
\ \
2 05000293 CLNTU 860116 8601240178 86/01- 34359 Forwards Safety Insp Rept 50-293/85-37 on 851216-20.No 252 violation noted.
l 2 05000293 TIUTIN 860106 8601240182 66/01 34359 Insp Rept 50-293/85-37 on 851216-20. No vi ol ati on . noted . Major 254 creas inspecteds fire protection / prevention program,i 2.05000293 CLNTU 860313 0603200289 86/03 35146 Forwards safety Insp Rept 50-293/86-01 on 860101-0217 & 314 notice of violation.Mgt attention should be given to 5
I 4 05000293 TIUTIN 860312 8603200298 .
86/03 35146 Insp Rept 50-293/86-01 on 860101-0217. Violation noted: 317 f aulire to f ollow procedural instructions for comple l
1
- -'"'"99Sp en gapepe hs. enemaei egome 9t ee o e en .,gg..g.g ,99g @g et S9**WD -g k
'? l,]y. ' q4', .,_. ,e , ,,,
, 3:05000293 CLNTU 860310 8603170224 86/03 34950 Forwards Radiological Safety Insp Rept 50-293/86-02 on 310 C60113-17.No, violations noted. Establishment & implem 3 05000293 TIUTIN 860307 8603170227 86/03 34950 Insp Rept 50-293/86-02 on 860113-17. Major areas inspected: 312 ;
items identified in radiological improvement program 2 05000293 CLNTU 860306 8603130175 86/03 34921 Forwards Safety Insp Rept 50-293/86-03 on 860122-24.No 046 violation identified. -
2 05000293 TIUTIN 860306 8603130178 86/03 34921 Emergency Preparedness Insp Rept 50-293/86-03 on 860122-24. 048 No viol ation identified. Major areas inspected:util a s
2 05000293 CLNTU 860212 8602200065 86/02 34642 Forwards Insp Rept 50-293/86-04 on 860102 & notice of ' 085 i violation. Insp conducted by State of SC of shipment 86/02 34642 1 05000293 TIUTIN 860204 8602200073 089 Insp Rept 50-293/86-04 on 860102 by State of SC of shipment of radwaste f rom f acility. Violation noted:f ailure to 2 05000293 CLNTU 060402 8604100305 86/04 35491 Forwards Saf ety Insp Rept 50-293/86-06 on 860218-0307 & 191 notice of violation. Corrective action programs in pl 5 05000293 TIUTIN 860328 8604100309 86/03 35491 l 195 Insp Rept 50-293/86-06 on 860218-0307. Violation noted:
replacement squib charges installed in standby liqui 1
l I - --. - . . ... .. - .. . .-
i
- a. n ,$
ll.) .. ;. ,
L'~ 3'05000293 CLNTU 860619.8606260273 86/06 36731 Forwards Safety Insp Rept 50-293/86-07Jon 860309-0428.No 001-
' violation noted. Initial review ' of debris f ound in MS 4.05000293LTIUTIN 860613 8606260281_ 86/06 36731 Insp Rept.50-293/86-07.on 860309-0428.No violation noted. 003 Major.. areas -inspected: accessible parts of plant stru
]
i q
. j 5 05000293 CLNTU 860529 8606090461 86/05 36396 Foresards Saf eguards Insp Rept 50-293/86-08 on 860317-21, 110 Concerns. noted re f molementation of physical securit 2 05000293.TIUTIN 860528 8606090473 .
86/05 36396 Partia11y 'wi thheld Physical Security Insp Rept 50-293/86-08 112 on 860317-21. (ref 10CFR73.21).Eight concerns identif
\
3 05000293 CLNTU 860523 8606040161 '
Forwards' Saf ety Insp Rept 50-293/86-09 on 860428-0502.No 86/05 36314 violations noted.Little or no in.provement noded sinc 139 4-05000293 TIUTIN 860522 8606040167 86/05 36314 Insp Rept 50-293/86-09 on 860428-0502. No viol ations 'noted. 141 Major areas inspected: radiological. environ monitorin 4 05000293 CLNTU 860506 8605120187 86/05 35915 Forwards Safety Insp 'Rept 50-293/86-10 on 860324-27 & notice 004 of violation. Correction of violations & deviations . . . . . . . . . . - _
1 05000293 TIUTIN 860501 8605120194 86/05 35915 Safety Insp Rept 50-293/86-10 on 860324-27. Violations noted: 008 failure to conduct QC of packages transferred to lan 4 05000293 CLNTU 860620 8606260267 86/06 36730 Forwards Saf ety Insp Rept 50-293/86-11 on 860512-16.No 054 violation noted. .
5 05000293 TIUTIN.860618 8606260272 86/06 36730 Insp Rept . 50-293/86-11 on 860512-16.No violation noted. 056 Major areas inspected: repair of MSIVs which could no
== a.e o e e e
.,7 ,, ,,
-3 05000293 CLNTU 860502 8605090069 86/05 35909 Forwards safety Insp Rept 50-293/86-12 on 860324-28.No 298 violation noted.
4'05000293 TIUTIN 860421 8605090077 86/04 35909 Insp Rept 50-293/86-12 on 860324-28. No viol ati on or 300 devi ation noted. Major areas inspected: plant mod f or 4 05000293 CLNTU 860528 8606060107 86/05 36349 Forwards Safety Insp Rept 50-293/86-13 on 860403.No 144 viol ation noted.
5 05000293 TIUTIN 860528 8606060112 86/05 36349 Emergency Preparedness Insp Rept 50-293/86-13 on 860403.No 146
. viol ation noted. Major areas inspected: f ollowup on ac t
1 5 05000293 CLNTU 86073b 8608040282 ,
86/07 37356 Forwards Safety Insp Rept 50-293/86-14 on 860428-0602 L 022 notice of violation. Inadequacies re preparation of s 2 05000293 CLNTU 860813 8608210027 86/08 37615 Forwards cover sheet to Resident Insp Rept 50-293/86-14. 001 Cover sheet inadvertently omitted from original subm 4 05000293 TIUTIN 860811 8608210033 86/08 37615 Cover sheet to Resident Insp Rept 50-293/86-14 on 860419- 003 0602. Violations ,noted:f ailure to take prompt correct 3 05000293 TIUTIN 860730 8608040293 86/07 37356 Insp Rept 50-293/86-14 on 860428-0602. Violations noted: 027 inadequate surveillance testing of HPCI sys uncorrec l
3 05000293 CLNTU 860814 8608260099 86/08 37653 Forwards combined Exam & Training Program Insp Rept 294 50-293/85 15DL, conducted during wk of 860505. ___ , _ _
1 05000293 TIEXAM 860717 8608260104 86/07 37653 Combined Exam L Insp Rept 50-293/86-150L, conducted during 296 wk of 860505. Exam results:f our reactor operator & tw
1 2 05000293- CLNTU 860523 8605300321 86/05 36143 1 Forwards .Radi ol ogi cal Safety Insp Rept 50-293/86-16 on 3o9 1 860414-17.No violation noted. Deficiencies identified j 3 05000293 TIUTIN 860521 8605300327 86/05 36143 Insp Rept 50-293/86-16 on 860414-17.No violations noted. 311 l Major- areas inspected: radiological improvement plan i i
5 05000293 CLNTU 860516 8605280044 86/05 36113 Forwards Saf ety Insp Rept- 50-293/86-17 on 860412-0425.No 204 violation noted.Rept identifies several areas for 86/05 36113 2 05000293 TIUTIN 860516 8605280047 207 Insp Rept 50-293/86-17 on 860412-0425.No viol ation noted.
Ma j or- areas inspected: spurious Group i primary conta l
i 5 05000293 CLNTU 861215 612220379 86/12 39062 Forwards Health Physics Appraisal Insp Rept 50-293/86-19 on 252 !
C61020-24,in response to 841129 order modifying lice 2 05000293 TIUTIN 861205 8612220390 86/12 39062 Insp Rept 50-293/86-19 on 861020-24.No violations noted. 255 Major areas inspected:mgt oversight & control,organi 4 05000293 CLNTU 870107 8701200459 87/01 39316 Forwards errata to Insp Rept 50-293/86-19,consi sting' of 090 !
revised cover page w/ signature of insp team member 3 05000293 TIUTIN 870106 8701210051 87/01 39316 ;
Errata to Insp Rept 50-293/86-19 on 861020-24, consisting of 092 !
revised cover page w/ signature of insp team member 86/08 37712 4 05000293 CLNTU 860825 8609030346 262
- Forwards Saf ety Insp Rept 50-293/86-21 on 860602-0707 &
notice of violation. Requests schedule for completion ,
l 86/08 37712 l 3 05000293 TIUTIN 860825 8609030356 265 Resident Insp Rept 50-293/86-21 on 860602-0707. Violation noted s use of inadequate battery test procedure.Failu l
- Q;,)
1 05000293 CLNTU 860701 8607'140286 86/07 36999 Forwards Mgt Meeting Rept 50-293/86-22 on'860612 re util 131 l corrective actions & improvement programs, including 2 05000293 TIUTIN 860623 8607140289 86/06 36999 Mgt Meeting Rept 50-293/86-22 on 860612. Major areas 133 discussed: licensee corrective action programs, status 3 05000293 CLNTU 861007 8610150403 86/10 38251 Forwards Saf ety Insp Rept 50-293/86-24 on 860BO4-08.No 305 violations noted.Results of,most recent f ailure anal _ , , ,_ _
1 05000293 TIUTIN 860918 8610150409 86/09 38251 Insp Rept 50-293/86-24 on 860804-08.No violations noted. 307 ,
Major areas inspected: actions to address Generic Ltr 1
5 05000293 CLNTy 860925 8610060747 86/09 38108
' Forwards Saf ety Insp Rept 50-293/86-25 on 860708-0804 & 325 notices of violation & deviation.
3 05000293 CLNTU 861030 8611070196 86/10 38523 Forwards corrected pages to Insp Rept 50-293/86-25.Ref date 142 for performance of Surveillance Test Procedure 8.M.2 O 05000293 TIUTIN 860902 8610060773 86/09 38108 Insp Rept 50-293/86-25 on 860708-0804. Violations noted: 331 f ailure to f ollow surveillance test procedures & to 86/10 38523 3 05000293 TIUTIN 861030 8611070201 144 Corrected Pages 2 & 16 to Insp Rept 50-293/86-25, correcting date f or perf orm.ance of' Surveillance Test Procedure 2 05000293 CLNTU 860829 8609080212 86/08 3774.6 Forwards Saf ety Insp Rept 50-293/86-27 on 860804-OB.No 137 j
violatibns noted. , , -
1 86/08 37746 0 2 05000293 TIUTIN 860821 86090805224 139
- Insp Rept 50-293/86-27 on 860804-08.No violations noted.,
Major areas inspected:maint program & . associated act ,
1
_ . _ _ _ . _ . _ _ _ _ _ _ _ _ __w
?. @g .$8 .
861030 8611100078 86/10 38524 4 05000293 CLNTU Forwards Safeguards Insp Rept 50-293/86-28 on 860804-06. 246 No violations noted.
86/10 38524' 5 05000293 TIUTIN 861023 8611100088 248 Physical Security Insp Rept 50-293/86-28 on 860804-06.No vi ol at i ons . noted . Ma j or areas inspected: status of sec ,
86/10 38311 2 05000293 CLNTU 861014 8610210414 296 Forwards Saf ety Insp Rept 50-293/86-29 on 860805-0908.No violations observed. Concern expressed re lack' of ef f 86/10 38311 3 05000293 TIUTIN 861008 8610210425 298 Insp Rept 50-293/86-29 on 860805-0915.No violations observed. Major areas inspected: plant operations,radi I
860820 8702190673 86/08 39687 2 05000293 CLNTU 075 Forwards Mgt Meeting Insp Rept 50-293/86-30 on 860730.
86/08 39687 5 05000293 TIUTIN 860819 8702190675 077 Mgt Meeting Insp Rept 50-293/86-30 on 860730. Major areas inspected: plant status,SALP improvement status, overt 86/10 38325 3 05000293 CLNTU 861014 8610220297 277 Forwards Insp Rept 50-293/86-31 on 860908-12.No violation noted.
86/10 38325 4 05000293 TIUTIN 861009 8610220300 279 Insp Rept 50-293/86-31 on 860908-12.No noncompliance noted.
Major areas inspected:IE Bulletins 79-07 re seismic 86/09 38189 5 05000293 CLNTU 860929 8610100232 202 Forwards Mgt Meeting Rept 50-293/86-32 on 860909, 86/09 38189 2 05000293 TIUTIN 860925 8610100240 204 Mgt Meeting Rept 50 ,293/86-32 on 860909. Major i tems discussed status of licensee mgt sys improvements,SA
2 05000293 CLNTU 861030.8611060043 86/10 38498 Forwards saf ety Insp Rept 50-293/86-33 on 860930-1003.No 103 violations noted. . ..
2 05000293 TIUTIN 861029 8611060049 86/10 38498 Emergency Preparedness Insp Rept 50-293/86-33 on 105 C60930-1003.No violations noted. Major areas inspecte 4 05000293 CLNTU 861210 8612290217 86/12 39091 Forwards Insp Rept 50-293/86-34 on 860916-1020 L notice of 285 violation. Concern expressed re initial followup to f 5 05000293 TIUTIN 861106 8612290224 86/11 39091 Pcrtially wi thheld Insp Rept 50-293/86-34 on 860916-1020 288 (ref 10CFR73.21) . Violation noted: implementation of s 861105 8611110015 86/11 38533 5 05000293 CLNTU i Forwards Saf ety Insp Rept 50-293/86-35 on 860929-1002. 278 86/11 38533 4 05000293 TIUTIN 861104 8611110016 280 Insp Rept 50-293/86-35 on 860929-1002.No violation noted.
Major areas inspected: radioactive liquid & gaseous e 861230 8701080574 86/12 39214 5 05000293 CLNTU
- 185 Forwards Saf ety Insp Rept 50-293/86-36 on 861020-24 & notice of violation. Response to notice of violation should 86/12 39214 5 05bO293 TIUTIN 861223 8701080581 189 Insp Rept 50-293/86-36 on 861020-24.Two violations noted &
three items remain unresolved re fire protection pro, 2 05000293 CLNTU 861231 8701090318 86/12 39219 Forwards Saf ety Insp Rept 50-293/86-37 on 861021-1124 & 327 notice of violation. Expresses concern re continuing 2 05000293 TIUTIN 861223 8701090349 86/12 39219 Insp Rept 50-293/86-37 on 861021-1124. Viol ations noted: 331 i nadequ' ate implementation of fire brigade training
f' .
,y '
I l
3 05000293 CLNTU 861209 8612120331 86/12 38949 j Forwards Safety Insp Rept 50-293/86-38 on 861112-14 & 315 l notice of violation. Weaknesses in fire protection pr l 1 05000293 TIUTIN 861203 8612120343 86/12 38949
! Insp Rept 50-293/86-38 on 861112-14. Violations noted: 318 l ina,dequate fire water sys drawings & operating proce l
4 05000293 CLNTU 861224 8701070389 86/12 39180 Forwards Safety Insp Rept 50-293/86-39 on 861210.No 352 violations noted.Util performance during exercise 86/12 39180 l C 05000293 TIUTIN 861223 8701070396 Emergency Preparedness Insp Rept 50-293/86-39 on 861209-11. 354 No violations noted. Major areas inspected: licensee p 1
2 05000293 CLNTU 870212 8702240427 87/02 39722 Forwards Saf ety Insp Rept 50-293/86-40 on 861125-1231.No 264 violations noted. Exploration of insulator design cha 4 05000293 TIUTIN 870204 8702240435 87/02 39722 Insp Rept 50-293/86-40 on 861124-1231. No vi ol ations noted. 266 Major areas inspected radiation protection, physical 3 05000293 CLNTU 861231 8701090424 86/12 39228 Forwards Mgt Meeting Rept 50-293/86-41 on 861124. Concerns re 259 elow response to findings & weaknesses in areas,inc1 3 05000293 TIUTIN 861219 8701090605 86/12 39228 Mgt Meeting Rept 50-293/86-41 on 861124. Major areas 266 j discussed: plant status, status of licensee mgt sys l
~
4 05000293 CLNTU 870205 8702190200 87/02- 39680 Forwards Saf eguards Insp Rept 50-293/86-4a on 861209-11.No 273 violation noted. Steps taken to correct violation not 1 3 05000293 TIUTIN 870203 8702190216 87/02 39680 Physical Security Insp Rept 50-291'86-42 on 861209-11.No 275 viol ation noted. Major areas inspected: status of secu l
i
.j p., :
~
87/01 39451 4 05000293 CLNTU. 870121 8702020310 122 Forwards Safety Insp Rept 30-293/86-43 on 861215-19.No violations noted.
4 05000293 TIUTIN 870115 8702020320 87/01 39451 Insp Rept 50-293/86-43 on 861215-19.No violations noted. '
124 Major areas inspected:maint program, including contra !
3 05000293 CLNTU 870130 8702090041 87/01 39549 Forwards Radiological Safety Insp Rept 50-293/86-44 on 076 i 861217-19 & notice of violation.
87/01 '39549 5 05000293 TIUTIN 870121 8702090048 079 Insp Rept 50-293/86-44 on 861217-19. Violations noted s f ailure to perf orm radiological survey of vehicles leaving s ,
s 4 05000293 CLNTU 870224 8703030259 87/02 39820 !
Forwards Requalification Program Evaluation Rept 244 50-293/86-450L on 861001-03. ,
1 2 05000293 TIEXAM 870220 8703030273 87/02 39820 {
Requalification Program Evaluation Rept 50-293/86-450L on 247 l 861001-03. Evaluation results:f our senior reactor ope l
l
^
5 5 05000293 CLNTU 870317 8703300254 87/O3' 40267 Forward s Insp Rept 50-293/87-01 on 870105-09 & notice of 181 {
vi ol ati on.
3 05000293 TIUTIN 870219 8703300275 87/O2 40267 f Insp Rept 50-293/87-01 on 870105-09. Violations notedstwo 184 items in post-accident sampling sys & structural ste 1
870210 8702180508 87/02 39666 5 05000293 CLNTU 207 Forwards Saf ety Insp Rept 50-293/87-02 on 870105-09.N violation noted. . . .
39666 87/02 2 05000293 TIUTIN 870202 8702180517 209 Insp Rept 50-293/87-02 on 870105-09.No vi ol ation or deviation noted. Major areas inspected: local leak rat 4
- hp ., ,
870323 8703300580 87/03 40274
-4 05000293 CLNTU 250 Forwards Safety..Insp Rept 50-293/87-03 on 870101-0220 &
notice of violation. Violations in area of high radia i
87/03 40274 3 05000293 TIUTIN 870319 8703300592- 254 Insp Rept 50-293/87-03 on _870101-0220. Violations noted:
failure to properly control high radiation area keys 87/03 40133 1 05000293 CLNTU 870310 8703200249 274 Forwards Safety Insp Rept. 50-293/87-04 on 870112-16 &
notice of violation. Requests response address person 87/03 40133 3 05000293 TIUTIN 870306 8703200271 280 Insp Rept 50-293/07-04 on 870112-16. Violations noted:
inadequate surveillance test of standby gas treatmen l
870219 8703020458 87/02 39802 3 05000293 CLNTU 305 Forwards Safety Insp Rept 50-293/87-05 on 870112-16.No
' violation noted. '
_i 87/02 39802 2 05000293 TIUTIN 870217.8703020464 307 I
Insp Rept 50-293/87-05 on 870112-17.No viol ation noted. Major creas inspected: previous insp findings,IE Bulletin 8 I
" + " * * * * * = = + + = = . . . . , . . ,
t APPENDIX C ;
DOCUMENTS TO BE WITHHELD IN THEIR ENTIRETY UNDER EXEMPTION (5)
F0IA REQUEST NUMBER 87-394 DATE ORIGINATOR RECIPIENT DESCRIPTION i
1,. 1985 SALP Issue Status (64 Pages)
- 2. 11/14/85 NRC, Region I SALP - Physical Protection (6 Pages)
- 3. .12/15 - NRC, Region I Pilgrim Post-Inspection 12/19/86 SALP Performance Analysis (36 Pages)
- 4. 1/27/87 NRC, Region I NRC, Region.I Memo
Subject:
Emergency j Preparedness SALP Input for :
Pilgrim Nuclear Power Station i (3 Pages)
- 5. 2/18/87 NRC, Region I SALP - Physical Protection (6 Pages) q
- 6. 2/18/87 NRC, Region I NRC, Region I Memo
Subject:
Pilgrim DRS SALP Input for SALP Period Nov. 1, 1985 - Jan. 31, 1987 (12 Pages)
- 7. 2/20/87 NRC, Region I NRC, Region I Memo
Subject:
Radiological Controls SALP Input' for Pilgrim Station (6 Pages) l
- 8. 3/5/87 NRC, Region I Post-Inspection SALP Data Sheet (4 Pages)
_