ML20154Q245
| ML20154Q245 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/15/1988 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Driscoll M FREDERICK C. ADAMS PUBLIC LIBRARY |
| References | |
| NUDOCS 8810030349 | |
| Download: ML20154Q245 (2) | |
See also: IR 05000293/1988021
Text
__
-
_ _ _ - _ _
.
,
-.~
.
'
-
SEP 151988
Frederick C. Adams publ : Library
ATTN: Ms. Mary Ann Driscoll
Summer Street
Kingston, Massachusetts 02369
Dear Ms. Driscoll:
.This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-
grated Assessment Team Inspection (IATI) Report (No. 50-293/88-21), conducted
at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the
!
Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/
87-99), dated July 27, 1988, covering the period February 1, 1987 through
May 15, 1988; and the transcripts from the NRC's Advisory Committee on Reactor
Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on
September 8, 1988,
in Bethesda,
Maryl a r.d ,
concerning
the proposed plant
,
restart.
,,
Please place this material with the copy of the PNPS Restart Plan and belf-
Assessment Report, which were previously provided, and make it available for
public review.
Thank you for your continuing cooperation in this matter.
Sincerely,
ORIGINAL $10NFl1 BY
J
l
Samuel J. Collins, Deputy Director
~
Division of Reactor Projects
Enclosures:
)
As stated
]
l
cc w/o encis:
.l
Public Document Room (POR)
'
j
Local Public Document Room (LPOR)
.
,
5
J
ko
t
0FFICIAL RECORD COPY LIBRARY KINGSTON - 0001.0.0
pgj
'
$$N*S0$$E888;
/
l
<-
o
.
,
.
.- .
'
Frederick C. Adams Public Library
2
SEP 1519gg
bec w/o encls:
L. T. Doerflein, DRP
M. J. DiDonato, DRP
M. T. Miller, SLO
s
N
O
RI:DRP
RI:DRP
b. .DRP
LDoerflein/mjd
JWigg)ns
'
111ns
9/t < /88
9/l'/88
9/15 /88
0FFICIAL RECORD COPY LIBRARY KINGSTON - 0002.0.0
09/15/88