SEP 151988
,
i
Carver Public Library
l
ATTN:
Librarian
-
Post Office Box 328
l
Main Street
Carver, Massachusetts 02330
,
Gentlemen:
,
4
This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-
,
grated Assessment Team Inspection (IATI) Report (No. 50-293/88-21), conducted
'r
at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the
Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/
l
87-99), dated July 27, 1988, covering the period February 1, 1987 through
May 15, 1988; and the transcripts from the NRC's Advisory Committee on Reactor
!
Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
l
Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on
September 8, 1988,
in Bethesda,
concerning
the proposed plant
!
restart.
l
Please place this material with the copy of the PNPS Restart Plan and Self-
l
Assessment Report, which were previously provided, and make it available for
l
public review.
l
Thank you for your continuing cooperation in this matter.
[
!
Sincerely,
i
l
'0RIGINR RIANm RY
f
[
Samuel J. Collins, Deputy Director
,
01 vision of Reactor Prchets
!
'
t
Enclosures:
As stated
i
cc w/o encis:
Public Document Room (POR)
!
Local Public Document Room (LPDR)
j
i
!
l
!
I
f
1
0FFICIAL RECORD COPY LIBRARY CARVER - 0001.0.0
t
09/15/88
LQ
estooso216 eso,is
TED
ADoCK c50o0293
O
j
.
m
'
l
.
.
..
Carver Public Library
2
SEP 151988
bec w/o encis:
L. T. Doerflein, DRP
M. J. 010onato, DRP
M. T. Miller, SLO
O
RIORP
RI:0RP
I:0RP
L0oerflein/mjd
~'JWiggins
ollins
9/16/88
9/j $/88
9/6/88
0FFICIAL RECORD COPY LIBRARY CARVER - 0002.0.0
09/15/88