ML20202E018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 23: Line 23:
==Dear Mr. Tiernan:==
==Dear Mr. Tiernan:==


The Commission has issued the enclosed Amendment No.116to Facility Operating License No. DPR-53 for Calvert Cliffs Nuclear Power Plant, Unit No.1. This amendment consists of changes to the Technical Specifications in response to your application dated December 17, 1985 as supplemented by your letter dated January 16, 1986.
The Commission has issued the enclosed Amendment No.116to Facility Operating License No. DPR-53 for Calvert Cliffs Nuclear Power Plant, Unit No.1. This amendment consists of changes to the Technical Specifications in response to your application dated December 17, 1985 as supplemented by your {{letter dated|date=January 16, 1986|text=letter dated January 16, 1986}}.
This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows:
This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows:
(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, are decreased from at least 75% to at 1
(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, are decreased from at least 75% to at 1
Line 62: Line 62:
i' The Commission has issued the enclosed Amendment No.                              to Facility Operating License No. DPR-53 for Calvert Cliffs. Nuclear Power Plant, Unit No.1. This                                                ,
i' The Commission has issued the enclosed Amendment No.                              to Facility Operating License No. DPR-53 for Calvert Cliffs. Nuclear Power Plant, Unit No.1. This                                                ,
I                      amendment consists of changes to the Technical Specifications in response to                                              -
I                      amendment consists of changes to the Technical Specifications in response to                                              -
your application dated December 17, 1985 as supplemented by your letter dated January 16, 1986.-
your application dated December 17, 1985 as supplemented by your {{letter dated|date=January 16, 1986|text=letter dated January 16, 1986}}.-
!'                      This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel: Cycle 8 operation, as follows:
!'                      This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel: Cycle 8 operation, as follows:
                       .(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore j                      detector segments required for recalibration' of the excore neutron. flux-i                      detection system, in TS 3.3.3.2b, are decreased from at least 75% to at least l                        50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat                                                  '
                       .(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore j                      detector segments required for recalibration' of the excore neutron. flux-i                      detection system, in TS 3.3.3.2b, are decreased from at least 75% to at least l                        50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat                                                  '

Latest revision as of 19:22, 7 December 2021

Forwards Amend 116 to License DPR-53 & Safety Evaluation. Amend Changes Tech Spec 3.3.3.2, In-Core Detectors, for Remainder of Fuel Cycle 8 Operation as Listed
ML20202E018
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/31/1986
From: Jaffe D
Office of Nuclear Reactor Regulation
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20202E022 List:
References
NUDOCS 8604110643
Download: ML20202E018 (3)


Text

f. .

March 31, 1986 Docket No. 50-317 DISTRIBUTION:

- DocketWe: FMiraglia Rs LTremper BGrimes LFMB SECY WRegan Mr. J. A. Tiernan PBD#8 Rdg OPA Vice President - Nuclear Energy WJones TBarnhart-4 Baltimore Gas & Electric Company PMKreutzer-3 EJordan P. O. Box 1475 DJaffe JPartlow Baltimore, Maryland 21203 OELD LJHarmon ACRS-10 CC Files +4

Dear Mr. Tiernan:

The Commission has issued the enclosed Amendment No.116to Facility Operating License No. DPR-53 for Calvert Cliffs Nuclear Power Plant, Unit No.1. This amendment consists of changes to the Technical Specifications in response to your application dated December 17, 1985 as supplemented by your letter dated January 16, 1986.

This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows:

(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, are decreased from at least 75% to at 1

  • t 50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat rate are decreased from at least 75% to at least 50% of all incore detector locations.

Approval of these Technical Specification changes is partly predicated on your commitment, contained in your application dated December 17, 1985 that, when the failure level of incore detector strings exceeds 25%, the power distribution map frequency will be increased to a Mode-1 once per-15-day schedule as described in the enclosed Safety Evaluation.

The notice of issuance will be included in the Commission's next bi weekly Federal Register notice.

Sincerely,

/S/

David H. Jaffe, Project Manager PWR Project Directorate #8 (<

F-Division of PWR Licensing-B gi F

Enclosures:

1.

2.

Amendment No.116 to DPR-53

' Safety Evaluation V[b be e pag [ *See previous white for concurrences.

PBD#8

  • PBD#8
  • PBD#8
  • OELD
  • PMKreutzer DJaffe AThadani CWoodhead 3'20'86- /

Y 2186 Y 21/86 - 3/ 24/86

~

3l 8604110643 860331 PDR ADOCK 05000317 P PDR .

e ____ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ . _ _. _ _ . _ _

y . _ _ _ . _ __. _. _ . _ _ __ _ . _ . _ _ _ ___ _ _ _ _ _ _ _

s l

I Docket N'o. 50-317 DISTRIBUTION: l Docket File FMiraglia NRC & LPDRs LTremper BGrimes LFMB SECY WRegan

'Mr. J. A. Tiernan PBD#8 Rdg OPA  :

1. Vice President - Nuclear Energy WJones TBarnhart-4 ,

Baltimore Gas & Electric Company PMKreutzer-3 EJordan  !

! P. O. Box 1475 DJaffe JPartlow Baltimore, Maryland 21203 OELD . LJHarmon 1 ACRS-10 CC Files +4 1

Dear Mr. Tiernan:

i' The Commission has issued the enclosed Amendment No. to Facility Operating License No. DPR-53 for Calvert Cliffs. Nuclear Power Plant, Unit No.1. This ,

I amendment consists of changes to the Technical Specifications in response to -

your application dated December 17, 1985 as supplemented by your letter dated January 16, 1986.-

!' This amendment changes the Unit 1 Technical Specification (TS) 3.3.3.2, "Incore Detectors" for the remainder of fuel: Cycle 8 operation, as follows:

.(1) TS 3.3.3.2a is changed so that the incore detectors are used to determine azimuthal power tilt at three axial elevations, (2) the number of incore j detector segments required for recalibration' of the excore neutron. flux-i detection system, in TS 3.3.3.2b, are decreased from at least 75% to at least l 50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat '

rate are decreased from at'least 75% to at least 50% of all incore detector locations.

Approval of these Technical Specification changes is partly predicat on-l your commitment, contained in your application dated December 17, 19 hat, ,

j when the failure level of incore detector strings exceeds 25%, the p er distribution map frequency will be increased to a Mode-1 once per-15-day ,

schedule as' described in the enclosed Safety Evaluation.

f The notice of issuance will be included in the Commission's next bi-weekly Federal Register notice.

4

. Sincerely, i .

David H. Jaffe, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B

Enclosures:

u 1. Amendment No.~ to DPR-53

] ,

2. . Safety Evaluation cc w/ enclosures:
.See next page i -PB 8 PB PBD#8 LD L

utzer.. DJ AThadani

,l j /86 /\/86 h/],}/86 3 /86 j ;q . .

Mr. J. A. Tiernan Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant

.-~

cc:

Mr. William T. Bowen, President Regional Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768 for Operations 631 Park Avenue D. A. Brune, Esq. King of Prussia, Pennys1vania 19406 General Counsel Baltimore Gas and Electric Company Mr. W. J. Lippold, Manager P. O. Box 1475 Nuclear Engineering Services Baltimore, Maryland 21203 Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 George F. Trowbridge, Esq. Lusby, Maryland 20657-0073 Shaw, Pittman, Potts and Trowbridge 1800 M Street, NW Mr. M. E. Bowman, General Supervisor Washington, DC 20036 Technical Services Engineering Calvert Cliffs Nuclear Power Plant Mr. J. R. Lemons MD Rts 2 & 4, P. O. Box 1535 Manager Nuclear Operations Lusby, Maryland 20657-0073 Baltimore Gas and Electric Company Calvert Cliffs Mr. R. M. Douglass, Manager MD Rts 2 & 4 Quality Assurance & Support Services Post Office Box 1535 Baltimore Gas and Electric Company Lusby, Maryland 20657-0073 Calvert Cliffs Nuclear Power Plant P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o U.S. Nuclear Regulatory Commission Combustion Engineering, Inc.

P. O. Box 437 ATTN: Mr. R. R. Mills, Manager Lusby, Maryland 20657-0073 Engineering Services P. O. Box 500 Mr. Leon B. Russell Windsor, Connecticut 06095 Manager - Nuclear Maintenance Calvert Cliffs Nuclear Power Plant Department of Natural Resources MD Rts 2 and 4, P. O. Box 1535 Energy Administratica, Power Plant Lusby, Maryland 20657-0073 Siting Program ATTN: Mr. T. Magette Bechtel Power Corporation Tawes State Office Building ATTN: Mr. D. E. Stewart Annapolis, Maryland 21204 Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 m -4

{

--