- p ar

  • [
  • UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION L j WASHINGTON, D, C. 20555 BALTIMORE GAS AND ELECTRIC COMPANY DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 116 License No. DPR-53
1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Baltimore Gas & Electric Company (the licensee) dated December 17, 1985, as supplemented by letter dated January 16,~1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

J M

d 8604110647 860331 PDR ADOCK 05000317 P PDR

.-~

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-53 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.116 , are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/{QhdW Asho C. Thadani, Director PWRProjectDirectorate#8 Division of PWR Licensing-B

Attachment:

Changes to the Technical Specifications Date of Issuance: March 31, 1986

't I

i f

ATTACHMENT TO LICENSE AMENDMENT NO.iin FACILTIY OPERATING LICENSE NO. DPR-53 DOCKET NO. 50-317 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change. The corresponding overleaf page is provided to maintain document completeness.

Remove Pages Insert Pages 3/4 3-29 3/4 3-29 I

e 1

i

l l

INSTRUMENTATION INCORE DETECTORS LIMITING CONDITION FOR OPERATION 3.3.3.2 The incore detection system shall be OPERABLE

  • with at least one i OPERABLE detector segment in each core quadrant on each of the four axial elevations containing incore detectors and as further specified below:
a. For monitoring the AZIMUTHAL POWER TILT:

At least eight quadrant symmetric incore detector segment groups containing incore detectors in the outer 184 fuel assemblies with sufficient OPERABLE detector segments in these detector groups to compute at least two AZIMUTHAL POWER TILT values at three of the four axial elevations containing incore detectors. I

b. For recalibration of the excore neutron flux detection system:
1. At least 50% of all incore detector segments, -

l

2. A minimum.of 9 OPERABLE incore detector segments at each detector segment level, and
3. A minimum of 2 OPERABLE detector segments in the inner 109 fuel assemblies and 2 OPERABLE segments in the outer 108 fuel assemblies at each segment level.
c. For monitoring the UNRODDED PLANAR RADIAL PEAKING FACTOR, the UNRODDED INTEGRATED RADIAL PEAKING FACTOR, or the linear heat rate:
1. At least 50% of all incore detector locations, 1
2. A minimum of 9 OPERABLE incore detector segments at each detector segment level, and
3. A minimum of 2 OPERABLE detector segments in the inner 109 fuel assemblies and 2 OPERABLE segments in the outer 108 fuel assemblies at each segment level.

An OPERABLE incore detector segment shall consist of an OPERABLE rhodium detector constituting one of the segments in a fixed detector string.

An OPERABLE incore detector location shall consist of a string in which at least three of the four incore detector segments are OPERABLE.

  • For Cycle 8 only.

CALVERT CLIFFS - UNIT 1 3/4 3-29 Amendnent No, M,116

INSTRUMENTATION ,__

LIMITING CONDITION FOR OPERATION (Continued)

.I An OPERABLE quadrant symmetric incore detector segment group shall con-sist of a minimum of three OPERABLE rhodium incore detector segments in 90* symmetric fuel assemblies.

APPLICABILITY: When the incore detection system is used for:

a. Monitoring the AZIMUTHAL POWER TILT, f
b. Recalibration of the excore neutron flux detection system, or
c. Monitoring the UNRODDED PLANAR RADIAL PEAKING FACTOR, the UNRODDED INTEGRATED RADIAL PEAKING FACTOR, or the linear heat rate.

ACTION: _-

With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration functions. The provisions of specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS b 4.3.3.2 The incore detection system shall be demonstrated OPERABLE:

)

i a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to l its use and at least once per 7 days thereafter when required i for:

I

1. Monitoring the AZIMUTHAL POWER TILT.
2. Recalibration of the excore neutron flux detection system.
3. Monitoring the UNRODDED PLANAR RADIAL PEAKING FACTOR, the UNRODDED INTEGRATED RADIAL PEAKING FACTOR, or the linear heat rate. ,,

~

b. At least once per 18 months by performance of a CHARNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall be calibrated prior to installation in ,

the reactor core.

1 CALVERT CLIFFS - UNIT 1 3/4 3-30 Amendment- No. 34 ,