{{#Wiki_filter:_ ._
-
  l
                                                  APR 221986
          Docket No. 50-440
          The Cleveland Electric Illuminating
            Company
        -ATTN: Mr. Murray R. Edelman
                  Vice President'
                  Nuclear Group
          Post Office Box 5000
          Cleveland, CH 44101
          Gentlemen:
          This refers to the special safety _ inspection conducted by Mr. J. H.- Neisler
          of this office on February 19 through March 12, 1986, of activities at Perry
          Nuclear Power Plant, Unit 1, authorized by NRC Construction Pemit No. CPPR-148
          and to the discussion of our findings with Mr. C. Y. Shuster and other members
          of your staff at the conclusion of the inspection.
          The enclosed copy of our inspection report ident'ifies areas examined during
                                                                -
                                                                .
          the inspection. Within these areas, the inspection consisted of a selective
          examination of procedures and representative records, observations, and
          interviews with personnel.
        ~ No violations of NRC requirements were identified during the course of this
          inspection..
          In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
          this letter and the enclosed inspection report will be placed in the NRC
          Public Document Room.
          We will gladly discuss any questions you have concerning this inspection.-
                                                      Sincerely,
                                                                              ~
                                                        ;Cr:;td Rd d'7 C
                                                                                          "
                                                                                        '
                                                      J. J. Harrison, Chief
                                                      Engineering Branch
          Enclosures:
          1. - Inspection Report
                No. 50-440/86007(DRS)
          2. ~ Attachment - Ltr dtd                                      "
                02/19/86, A. Kaplan          s604290066 860422
                to J. G. Keppler            {DR
                                                  ADOCK O        4jo
          See_ A_t_t_ ached Distribution
          RI I                I        RIII    RII}        III          I      III
                    8b^              -d \&\    /jck
                                                            W1
                                                                            h
          Ne s er/jkttMP Ph ips Muffett Knop                                rison P    riello
          04/21/8                i
                          04/J /86 04/22/86 04hk/86 4/            86 04/ @ 6      4/    86
            P            %                                  Laenicer re0'
 
'
    _
  L
      The Cleveland Electric Illuminating = 2 APR 221986
        : Company
      Distribution
      cc w/ enclosures:
        J. J. Waldron, Manager, Perry -
              .
          Plant Technical Department
      M. D. Lyster, Manager, Perry Plant
          Operations Department
      RL. 0. Beck, General Supervising
          Engineer, Nuclear Licensing and
          Fuel Management Section
      - C. .Y. Shuster,  Manager, Quality
          . Assurance
        DCS/RSB (RIDS)
        Licensing Fee Management Branch
        Resident Inspector, RIII
        Harold W. Kohn, Ohio EPA
        Terry- J. Lodge, Esq.
      . James W. Harris, State of Ohio
      . Robert H.-Quillin, Ohio
          Department of _ Health
                                                    4
L
}}
}}

Latest revision as of 18:31, 31 December 2020

Forwards Safety Insp Rept 50-440/86-07 on 860219-0312.No Violation Noted
ML20203G421
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/22/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20203G426 List:
References
NUDOCS 8604290066
Download: ML20203G421 (2)


See also: IR 05000440/1986007

Text

_ ._

-

l

APR 221986

Docket No. 50-440

The Cleveland Electric Illuminating

Company

-ATTN: Mr. Murray R. Edelman

Vice President'

Nuclear Group

Post Office Box 5000

Cleveland, CH 44101

Gentlemen:

This refers to the special safety _ inspection conducted by Mr. J. H.- Neisler

of this office on February 19 through March 12, 1986, of activities at Perry

Nuclear Power Plant, Unit 1, authorized by NRC Construction Pemit No. CPPR-148

and to the discussion of our findings with Mr. C. Y. Shuster and other members

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report ident'ifies areas examined during

-

.

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

~ No violations of NRC requirements were identified during the course of this

inspection..

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.-

Sincerely,

~

Cr
;td Rd d'7 C

"

'

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1. - Inspection Report

No. 50-440/86007(DRS)

2. ~ Attachment - Ltr dtd "

02/19/86, A. Kaplan s604290066 860422

to J. G. Keppler {DR

ADOCK O 4jo

See_ A_t_t_ ached Distribution

RI I I RIII RII} III I III

8b^ -d \&\ /jck

W1

h

Ne s er/jkttMP Ph ips Muffett Knop rison P riello

04/21/8 i

04/J /86 04/22/86 04hk/86 4/ 86 04/ @ 6 4/ 86

P  % Laenicer re0'

'

_

L

The Cleveland Electric Illuminating = 2 APR 221986

Company

Distribution

cc w/ enclosures:

J. J. Waldron, Manager, Perry -

.

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

RL. 0. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

- C. .Y. Shuster, Manager, Quality

. Assurance

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry- J. Lodge, Esq.

. James W. Harris, State of Ohio

. Robert H.-Quillin, Ohio

Department of _ Health